[2025] NSWCATCD 190
General information, not legal advice.
NCAT Consumer and Commercial
2025-11-04
Original judgment source is linked above.
Bellgrove v Eldridge [1954] HCA 36; (1954) 90 CLR 613
Blacktown City Council v Hocking [2008] NSWCA 144
Makita (Australia) Pty Ltd v Sprowles [2001] NSWCA 305
McCartney v Orica Investments Pty Ltd [2011] NSWCA 337
Pownall v Conlon Management Pty Ltd [1995] WASC 117; (1995) 12 WAR 370
Tabcorp Holdings Pty Limited v Bowen Investments Pty Limited [2009] HCA 8 (12 February 2009)
X-Build Construction Services Pty Ltd v O'Rourke [2020] NSWCATAP 181
'(a) a warranty that the work will be done with due care and skill and in accordance with the plans and specifications set out in the contract,
(b) a warranty that all materials supplied by the holder or person will be good and suitable for the purpose for which they are used and that, unless otherwise stated in the contract, those materials will be new,
(c) a warranty that the work will be done in accordance with, and will comply with, this or any other law,
(d) a warranty that the work will be done with due diligence and within the time stipulated in the contract, or if no time is stipulated, within a reasonable time,
(e) a warranty that, if the work consists of the construction of a dwelling, the making of alterations or additions to a dwelling or the repairing, renovation, decoration or protective treatment of a dwelling, the work will result, to the extent of the work conducted, in a dwelling that is reasonably fit for occupation as a dwelling,
(f) a warranty that the work and any materials used in doing the work will be reasonably fit for the specified purpose or result, if the person for whom the work is done expressly makes known to the holder of the contractor licence or person required to hold a contractor licence, or another person with express or apparent authority to enter into or vary contractual arrangements on behalf of the holder or person, the particular purpose for which the work is required or the result that the owner desires the work to achieve, so as to show that the owner relies on the holder's or person's skill and judgment.'
(a) What rectification methodology should be ordered in relation to the shower ensuite floor defect?
(b) Is the builder liable for the defective items of incomplete works and poor workmanship which the parties have not agreed on?
(c) If the builder is liable, what rectification methodology should be ordered?
The orders sought by the owners were:
'Pursuant to s 48MA of the HB Act, the Respondents are ordered to perform rectification works to unit [xxx] in Strata Plan 22/78364 (the Rectification Works); and
The Rectification Works are to be carried out in accordance with the report of Mr Steven Nakhla issued on 9 October 2023; and
Within 7 days of these orders, the Applicants are to nominate 3 appropriate experts to supervise the Rectification Works; and
Within 7 days of receiving the Applicant's nominees, the Respondents are to elect one expert to supervise the Rectification Works; and
Mr Robert Ghalbouni being the Second Respondent, is not to:
(i) personally perform the Rectification Works; and
(ii) attend on site at any time in relation to the Rectification Works; and
(iii) otherwise have any contact with the Applicants other than through legal representatives.
Such further or other orders as the Tribunal thinks fit.'
'The Rectification works are to be carried out in accordance with the report of Mr Craig Nisbett from Tyrrells Building Advisory and dated 8 April 2024'
(1) the expert's opinion must clearly indicate the facts upon which it is based,
(2) those facts must be proved so there is a factual basis for the opinion,
(3) the reasons or the process of reasoning for the opinion must be disclosed, and
(4) any opinion must fall within the qualifications and experience of the expert.
'Expert opinion is to be judged like any other evidence. It must be comprehensible and reach conclusions that are rationally based. The process of inference that leads to the conclusions must be stated or revealed in a way that enables the conclusions to be tested and a judgment made about the reliability of them.'
Rectification methodology for ensuite shower floor
'During my investigations I inspected the ensuite shower of the home and documented my findings.
The homeowner notified me that water ponds after the shower is used and does not drain away.
I observed the tiles around the floor waste had not been transversely cut indicating the tiles had been laid on a relatively flat surface.'
'Note: The ensuite will all require all fittings, floor and wall coverings removed, new waterproof membrane installed, new wall and floor tiles installed throughout and fittings re-installed.
There is no method to repair the shower area only as the waterproof membrane must be monolithic.'
'In my opinion the rectification of the shower area floor be rectified in isolation from the main ensuite floor. This can be done by installing a new water stop angle to the shower area when re-waterproofing the floor.'
(a) The waterproof membrane is initially installed in the whole bathroom as one unit; and
(b) Membranes generally work as a liquid membrane which develop into a solid substance; and
(c) His method of rectification will involve installing new waterproofing membrane and creating a join with the waterproofing originally installed; and
(d) The possibility cannot be ruled out that there will be a substandard join; and
(e) There are increased consequences in this circumstance where a leakage could affect other units in the block; and
(f) A monolithic approach to waterproofing bathrooms is always preferred.
'Q :You can't rule out a substandard joint'
A: You can't rule out anything.'
'Q :You can't rule out a substandard joint'
A: You can't rule out anything.'
'There is no method to repair the shower area only as the waterproof membrane must be monolithic.'
'In my opinion the rectification of the shower area floor be rectified in isolation from the main ensuite floor. This can be done by installing a new water stop angle to the shower area when re-waterproofing the floor.'
'Where within the proved case there is a range, however, the wrongdoer can hardly complain if the loss is found at the upper end of the range.'
'The example which the Court' (in Bellgrove v Eldridge) 'gave of unreasonableness was the following [26]:
"No one would doubt that where pursuant to a building contract calling for the erection of a house with cement rendered external walls of second-hand bricks, the builder has constructed the walls of new bricks of first quality the owner would not be entitled to the cost of demolishing the walls and re-erecting them in second-hand bricks."
That tends to indicate that the test of "unreasonableness" is only to be satisfied by fairly exceptional circumstances.'
An example of such exceptional circumstances was stated to be closely aligned with a party 'merely using a technical breach to secure an uncovenanted profit' as referred to by Oliver J. in Radford v De Froberville [1977] 1 WLR 1262 at 1270
(a) Chipped paint in the stairwell;
(b) Wall outside the laundry
(c) Door frames and architraves to both bathrooms; and
(d) Stair void wall.
'I observed the missing section of skirting behind the laundry cupboard door and in my opinion this has always been removed so that the cupboard door can open against the wall.'
'Poorly completed finish against skirting to be cleaned.'
'Walls, skirting, doors and architraves to be repainting as scratches and texta marks visible.'
'Inadequate floor protection installed during construction works
Sand and polished damaged timber floor to affected areas.
This includes the kitchen, living, bedroom, stairs and upper hallway.'
'observe scratched polished timber floors outside the Ensuite door in the master bedroom'
and that he
'was instructed by the builder at 4.3.1 that the polished timber floors were covered at all times during the works.'
"[167] The use of photographic evidence has been the subject of discussion in this Court. Its admissibility as a visual reproduction is beyond doubt: R v Travers (1958) 58 SR (NSW) 85 at 108. However, in Short v Barrett, Court of Appeal, 5 October 1990 (unreported), Meagher JA, with the concurrence of Clarke and Handley JJA, observed that in relying on his own interpretation of photographic evidence, the trial judge had overlooked the "sage advice" of Lord Reid in C Van der Lely NV v Bamfords Ltd [1963] RPC 61 at 71. His Lordship said:
'Lawyers are expected to be experts in the use of the English language, but we are not experts in the reading or interpretation of photographs. The question is what the eye of the man with appropriate engineering skill and experience would see in the photograph, and that appears to me to be a matter for evidence. Where the evidence is contradictory the judge must decide. But the judge ought not, in my opinion, to attempt to read or construe the photograph himself; he looks at the photograph in determining which of the explanations given by the witnesses appears to be most worthy of acceptance.'"
'Inadequate floor protection installed during construction works'
(a) there is no evidence of the owners complaining about this issue during the construction of the work or afterwards;
(b) of Mr Ghalbouni's evidence referred to above; and
(c) the owners' and Mr Nakhla's photographic evidence being of little probative value.
'1. Pursuant to s 48MA of the HB Act, the Respondents are ordered to perform the following rectification works to unit [xxx], Camperdown NSW 2050 in Strata Plan 22/78364 (the 'Site'); and
2. The rectification of the ensuite bathroom is to be carried out in accordance with pages 17 - 18 in section 8.1 of the report of Mr Steven Nakhla issued on 9 October 2023 (the' Nakhla report'); and
3. The rectification of items 2 - 12, 14, 17, 20, 21, 22, 23, 24, 25, 26 and 27 referred to in section 8.2 of the Nakhla report is to be carried out in accordance with the scopes of work referred to in connection with those items;
4. The rectification of item 19 referred to in section 8.2 of the Nakhla report is to be carried out to the polished timber floor outside the ensuite door in the master bedroom in accordance with the scope of work referred to in connection with that item.
5. Within 7 days of these orders, the Applicants are to nominate 3 appropriate experts to supervise the Rectification Works; and
6. Within 7 days of receiving the Applicant's nominees, the Respondents are to elect one expert to supervise the Rectification Works; and
7. Mr Robert Ghalbouni being the Second Respondent, is not to:
(i) personally perform the Rectification Works; and
(ii) attend on Site at any time in relation to the Rectification Works; and
(iii) otherwise have any contact with the Applicants other than through legal representatives.'
8. The rectification work referred to in the preceding paragraphs must be carried out and completed within 120 days of the date of this order, unless extended by the Tribunal.
I hereby certify that this is a true and accurate record of the reasons for decision of the Civil and Administrative Tribunal of New South Wales.
Tanious
RJG Group Pty Ltd [2025] NSWCATCD 190;
(1954) 90 CLR 613
(1995) 12 WAR 370