[2025] VCAT 245
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-03-24
Original judgment source is linked above.
Does the proposed child care centre result in an acceptable planning outcome?
The scale and intensity of the use and development.
The design, height, setback and appearance of the proposed buildings and works.
The proposed landscaping.
To provide for non-residential uses that serve the needs of the local community.
To support non-residential uses that are compatible with the residential character, scale and amenity of neighbourhoods.
Locate non-residential uses on sites that have access to a road in a Transport Zone.
Discourage non-residential uses from locating on sites in a local access street or lane.
Construct a building or construct or carry out works
Reduce the number of car parking spaces required under Clause 52.06-5
(a) Wheel stops for car parking spaces nos. 9 to 13;
(b) All boundary acoustic fencing at least 1.8 metres high (apart from a taper down to 0.9 metres high in the front setback area) and located in accordance with appendix B of the endorsed acoustic impact assessment report;
(c) First floor acoustic fencing in accordance with appendix B of the endorsed acoustic impact assessment report;
(d) Demonstration that 32 percent of the site area is covered with vegetation as specified in the BESS report submitted with the application;
(e) An amended sustainable design assessment report as required by condition 18 of this permit;
(f) A detailed landscape plan in accordance with condition 29.
(g) Provision of a 'maximum clearance' overhead sign and barrier at car park entry with a maximum height of 2.5m or as otherwise agreed by the Responsible Authority;
(h) Provision of a convex mirror on the western side of the driveway to aide safe pedestrian movements.
(i) Provision of digital directional signage at the entrance indicating number of available spaces at any time.
(a) Transport of materials, goods or commodities to or from the land;
(b) Appearance of any building, works or materials;
(c) Emission of noise, artificial light, vibration, odour, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil;
(d) Presence of vermin;
(a) Be constructed using lapped timber paling, fibre cement sheeting, lightweight aerated concrete, transparent acrylic panels, glass or profiled sheet cladding, as long as the selected material/s have a surface density of at least 12 kg/m2;
(b) Have no gaps or holes in it, or the likelihood of such occurring through natural causes or deformations, thus allowing noise to pass through. If existing fencing is to be retained, all gaps must be well sealed;
(c) Be constructed with cladding that is prefabricated to be jointed with an overlap or rebated joint (e.g., ship lapped). Or, where the requirement cannot be met, any butt joints shall be sealed with a fire-rated weatherproof mastic or an overlapping piece of material meeting the mass requirement of 12 kg/m2 (minimum 35mm each side of the butt joint);
(d) Ensure that all palings overlap by a minimum of 35mm where acoustic timber palings are installed;
(e) Ensure that joints in the cladding materials do not coincide where multiple cladding layers are used (e.g., FC sheeting over timber paling screen).
(a) Preliminary National Construction Code Section J assessment in accordance with the commitments outlined in the BESS report.
(a) pits and pipes sizes;
(b) extension of a minimum 225 diameter pipe the pit in front of 30 Walkers Road;
(c) finished and existing surface levels;
The design and construction of the roadworks and stormwater drainage and any other new Council infrastructure must be approved and supervised by Council.
(a) All storm water runoff is to be collected on site and discharged to the legal point of discharge using a pump system or as otherwise nominated by the responsible authority. The pump system is to be designed and constructed in accordance with Australian Standard 3500 Part 3.2 Section 9;
(b) In the event of any operational difficulties with the pump system, it is the responsibility of the landowner to rectify these difficulties;
(c) Any pump system is to be replaced by gravity discharge if and when available, and if directed by the Responsible Authority, at the landowner's full cost;
(d) Provision is made (if appropriate) in any subdivision for body corporate drainage works, and access to those drainage works to be on common property or within an easement in favour of the body corporate.
(a) Construct the site stormwater system connecting to a newly constructed underground drain in Walker St in accordance with approved plans, or other nominated point/s as approved by the Responsible Authority. The stormwater connection must be in accordance with the endorsed drainage plan;
(b) Construct the development in accordance with approved drainage plans;
(c) Provide a 5% civil maintenance bond for a 12 month defect liability period;
(d) Submit as-constructed drainage plans;
(e) A fee of 3.25% of the cost of the works is to be paid to Council for the checking and supervision of these works;
(f) Construct and complete all buildings and works, including landscaping works, in accordance with the endorsed plans;
(g) Construct and line mark the car parking area including accessways and surface with an all-weather sealed coat in accordance with the endorsed plans;
all to the satisfaction of the Responsible Authority.
When approved the tree protection management plan and its recommendations will be endorsed and will then form part of the permit.
All works within the nominated tree protection zones must be:
Works encroaching within the nominated tree protection zones must not be undertaken without the written consent of the Responsible Authority.
(a) A survey (including botanical names) of all existing vegetation to be retained and/ or removed;
(b) Details of surface finishes of pathways and driveways;
(c) A planting schedule of all proposed trees, shrubs and ground covers including botanical names, common names, pot sizes, sizes at maturity, and quantities of each plant;
(d) Landscaping and planting within all open areas of the site.
When approved, the plan will be endorsed and form part of the permit, all to the satisfaction of the Responsible Authority.
(a) The development is not commenced within two (2) years of the date of this permit.
(b) The development is not completed within four (4) years of the date of this permit.
(c) The use is not commenced within four (4) years of the date of this permit.
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires; or
(a) within six (6) months after the permit expires where the use or development has not yet started; or
(b) within twelve (12) months after the permit expires, where the development allowed by the permit has lawfully commenced before the permit expiry.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material is cited or referred to in these reasons.
Szabo
Greater Geelong CC [2025] VCAT 245