Application under section 114 of the Planning and Environment Act 1987 - application for enforcement order.
We carried out an accompanied inspection of the site and an unaccompanied inspection of the surrounds on 27 August 2018.
Does the current use of the site contravene planning requirements?
Does the development of the site contravene planning requirements?
Should we exercise our discretion to issue an enforcement order in respect of any planning contravention?
DOES THE CURRENT USE OF THE SITE CONTRAVENE PLANNING REQUIREMENTS?
What has been the past use and what is the current use of the site?
Details of past use of the site (approximately 1993 until January 2015)
Grossman's Garden Supplies was initially a relatively small scale operation, involving the sale of firewood and soil products. Over time, the business grew and the products it sold expanded, to include a wide range of soils, sand and stone (obtained from various suppliers), gas bottle delivery, steel reinforcement and other items used in the construction of concrete slabs. For a period in late 1990's/early 2000's soil blending was carried out on land to the north-east of the central shed, with soil from subdivisions in the area being deposited to that area and then sifted and sold as top soil/ loam.
During this period, the central shed was extended twice. The first extension was to the north (pursuant to amended plans endorsed under the 1994 Permit in 1999) to include a small scale concrete batching facility which dispatched 'mini mixers' with concrete for customers. The second extension was to the south for an office (pursuant to amended plans endorsed under the 1994 Permit in 2000).
Left over concrete from the batching plant was used by an employee of Grossman's Garden Supplies to make concrete pavers in an area around the central shed. In approximately 2006, this individual ceased employment with Grossman's Garden Supplies and commenced a separate business on the site, making pavers.
The land primarily used by Grossman's Garden Supplies was east of the central shed, however an existing farm gate to the west of the shed, on Grossman's road, was used as an access for the use, together with a gate onto Ghazeepore Road.
The firewood part of the business, which had originally been located east of the central shed, was moved to a location in the north-west of the site. This area was also used for waste stockpiling and vehicle storage (including the vehicles of Mr Larcombe, who delivered supplies to Grossman's Garden Supplies and also carried out work for Mr Grossman's father on his farm on the remainder of the site).
Later, this area was primarily used as for storage by two other businesses, a scaffolding business and a tilt slab construction business. Neither of these businesses carried out any activities on the site, other than to each lease from Mr Grossman and use a discrete part of the north-western corner of the site to store materials and vehicles associated with their businesses.
Details of current use of the site (January 2015 - present)
Is the current use of the site authorised by the 1994 Permit?
Did the use authorised by the 1994 Permit commence?
Is the current use of the site authorised by existing use rights under clause 63 of the scheme?
Use lawfully carried out immediately before the approval date
...the starting point for any enquiry about whether existing use rights can be established should always be to enquire why it is necessary to establish existing use rights. Ordinarily this will only become relevant because the use of land does not comply in some way with the current planning scheme. If the use of land fully complies with the planning scheme - for example, it is a section 1 use and all conditions are complied with, or a permit has been issued under the provisions of the current planning scheme - the issue of existing use rights will not be relevant. The lawfulness of the use of the land will be able to be established either by reference to the provisions of the planning scheme or to a permit.
The need to established existing use rights will most commonly arise when there has been a change to the planning scheme since the use commenced that would mean the use would not now be permitted or would now require a permit under the planning scheme (as amended) and no such permit has been granted.
for the purpose for which it was being lawfully used [our emphasis]
as the use was authorised by a planning permit during the relevant 15 year period, it remains bound by the conditions of that permit.
... Sometimes, though, there is a tendency on the part of practitioners to assume that once a use has been established for 15 years, even though it commenced lawfully pursuant to a permit or the provisions of the (then) planning scheme, the establishment of an existing use right under clause 63.11 supersedes an existing use right established under the first dot point of clause 63.01 (use lawfully carried out immediately before the approval date) or a right under an ongoing permit. One implication of this assumption is that this renders the provisions of clause 63.05 inapplicable. In other words, the implication is that even though a use commenced lawfully under a permit, once it has been going for 15 years, the conditions of the permit can be ignored because an existing use right is established under the alternative provision of clause 63.11.
This cannot be right. It would make a mockery of the whole scheme of the Planning and Environment Act 1987 which provides that planning permits granted under a planning scheme and in accordance with the Act are a key means of regulating the use and development of land in Victoria.
Is the use of the site consistent with any applicable conditions or restrictions?
This plan is hand drawn in a square shape. It purports to show, along the outside of the square, an area of 100 x 100 metres. Within the square are the following:
This is the same as plan 1 but includes an extension to the central shed and an area to the north of the shed with a reference to 'bays for materials stone/sand'. Adjacent to the southern landscape strip there is also a reference 'indigenous (Jeanette Spittle)', perhaps referring to the type of planting.
(c) Plan 3 (also part of the 1999 endorsed plans) - this plan shows expansion of the central shed to include the concrete hopper.
(d) Plan 4 (2000) - currently endorsed plan
This plan is for a further extension to the central shed. This is a new hand drawn plan which has been drawn in a rectangular shape and does not include any buildings or other uses aside from the central shed and proposed extension. There are no road names included on this plan. Landscaping strips are shown along each boundary, for a width of 7 metres.
The shed is shown as being located 10 metres from a boundary and 21 metres from another boundary, after the extension. This is consistent with the measurements on Plan 1 which showed the central shed located 10 metres from the western boundary. On that basis we have interpolated that the driveway shown on this plan is running east-west generally to the north of the Grossmans Road frontage, with an entry from Ghazeepore Road. There is no access to the site shown from Grossmans Road on this plan.
DOES THE DEVELOPMENT OF THE SITE CONTRAVENE PLANNING REQUIREMENTS AS ALLEGED BY COUNCIL?
What earthworks were carried out by the respondents in late 2014/early 2015?
Was planning permission required for those earthworks?
Is there any requirement for further landscaping works to be carried out on the site?
we consider the requirements of condition 3 are met in this case. We consider that the substantive landscaping around the perimeter of the site and the lack of any indication from Council over the 24 year life of the 1994 Permit (including numerous amendments to endorsed plans) that this landscaping was insufficient, is adequate indication of Council's 'satisfaction' with the landscaping which has been provided and maintained. Accordingly, we do not find there to be any breach of condition 3 of the 1994 Permit.
SHOULD WE ISSUE AN ENFORCEMENT ORDER AND IF SO, ON WHAT TERMS?
Plans endorsed 1 April 1993 pursuant to permit 93/5112 issued by the Barrabool Shire for Wood Storage at 460 Grossmans Road.
Plan 1 to the 1994 Permit - endorsed 5 December 1994
Plan endorsed under 2001 Permit, dated 30 August 2001
Plans endosed under 2004 Permit, dated 23 December 2004
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Image of 330 Grossmans Road, Bellbrae, from www.nearmap.com.au. The blue lines shown along the southern and eastern boundaries of the site have been measured at 205 and 85 metres respectively.
[3] The land owned by Kithbrooke Park is lot 1 on Plan of Subdivision 738469, within Certificate of Title Volume 11648 Folio 765.
[4] This document was attached to the affidavit of Mr Grossman as exhibit SKG-6.
[6] Amendment C33 to the Scheme rezoned the site to LDRZ on 16 August 2007.
[7] In doing so, we note that until mid-2012, the extent of the site being described is approximately 205 metres by approximately 100 metres from north to south. In mid to late 2012, the northern 15 metres of the site was used to create a retaining mound and became a buffer area between the site and what later became Watergum Drive to the north.
[9] See e.g. Cook v Mornington Peninsula SC (Red Dot) [2017] VCAT 1129
[10] The balance of the land is still referred to as 460 Grossmans Road. We understand this parcel is now approximately 78 hectares in area and remains in the ownership of the Grossman family. The remaining area, which includes the subject site, is owned by Kithbrooke Park. Within this lot, Kithbrooke Park Country Club has an address of 350 Grossmans Road and Newcomb Sand and Soil has an address of 330 Grossmans Road.
[11] [2018] VCAT 838, at [86]-[88].
[12] Council had previously provided an extract of Schedule 1 definitions from the Local Section of the Surf Coast Planning Scheme dated 16 June 1994, which does not include a definition of plant nursery.
[13] As to the instances in which non-compliance with permit conditions may affect whether a use has been established under a planning permit, see eg. NBH Business Park Pty Ltd v Whittlesea CC & Ors (No 3) [2012] VCAT 968, [119]-[151]
[14] (Red Dot) [2008] VCAT 973.
[15] (Red Dot) [2016] VCAT 1198, [71] - [72].
[16] Although even if it was to be read in this way, adopting the reasoning we outline below in respect of the interpretation of the endorsed plans, there is nothing before us with suggests that there was not strict compliance with permit conditions
[17] Mornington Peninsula Shire Council v Anderson [2009] VSC 301
[18] [2016] VCAT 2101 at [80-81] and [119].
[20] See, for example, the Tribunal reasoning in Box v Moreland CC (Including Summary) (Red Dot) [2014] VCAT 246.
[21] There was an access point constructed at around the 120 metre point along Grossmans Road in 2005, pursuant to a separate permission.
Surf Coast SC