austlii:qld/QBCCMCmr/2025/384
General information, not legal advice.
QBCCMCmr
2025-10-31
Original judgment source is linked above.
The Body Corporate for Sunrise at 1770 (applicant)
Sandra Laidlaw (owner) and Mark Olsen (occupier) (respondents)
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227(1)(b) and 229(3)(a)
Body Corporate and Community Management (Accommodation Module) Regulation 2020 (Accommodation Module)
INTERIM ORDERS - whether interim orders are warranted in the circumstances.
Act, ss 59, and 279
(a) remove any live vegetation, trees, flowers, plants and/or shrubs on any of Lot 60, Lot 62, common property, or any other lots;
(b) prepare for or install a driveway over any part of Lot 60, Lot 62, common property, or any other lots; or
(c) further develop, including by constructing a dwelling or preparing to construct a dwelling on Lots 60 or 62.
(i) noted that coastal banksias are "native to the area, they provide significant amenity value, habitat, and shelter, and play a crucial role in stabilizing the foreshore against erosion" > > (ii) considered the assessed banksias were otherwise in reasonable condition and demonstrated healthy growth > > (iii) was of the opinion that the nature of the damage to the banksias and the collection and heaping of debris was evidence that the damage was not from natural causes and was the result of deliberate actions, and the systematic nature and extent of damage indicated it was conducted over a period, potentially to improve views and gain access, and > > (iv) he considered the damage to and loss of the trees represents a significant negative impact on local amenity and ecological value
(i) the removal of any vegetation, trees, flowers, plants and/or shrubs on:
(ii) any works related to the installation of a driveway over:
(iii) any further development, including but not limited to the construction of a dwelling, over:
(iv) parking vehicles and machinery other than in approved driveways or on properly constructed parking areas on the Respondents' Lots; and
(v) storing fuel containers in quantities greater than required for normal domestic use on the Respondents' Lots or Common Property
(i) Schedule D - Part 2, section 5 - Body Corporate Approval Process; > > (ii) Schedule D - Part 3 - Design and Operations Manual, particularly the Building Design Code (section 3) and the Landscape Design and Vegetation Management (section 5); and
Nature or urgency of circumstances and the balance of harm
[1] The body corporate says that, by a power of attorney, the Respondent owner of the lots has appointed the Respondent occupier to act on her behalf for all matters relating to administration of the lots.
[5] Sections 226, 228 and 276 of the Act
[6] Until a final order is made, an adjudicator has the power to extend, vary, renew, or cancel an interim order. See Section 279(2)(b) of the Act. I note also that the body corporate and all owners will be invited to give their views before final orders are issued. See id. at Section 243
[8] Although an applicant must identify a genuine legal issue to be decided, the granting of an interim order by itself does not indicate whether or not an applicant will ultimately be successful on their application for final orders.
[9] See e.g., Australian Broadcasting Corporation v O'Neill [2006] HCA 46; (2006) 80 ALJR 1672 at [65] citing Beecham Group Ltd v Bristol Laboratories Pty Ltd (1968) 118 CLR 618 at 622 - 623
[10] Section 24 of the Act. The CMS for the scheme is binding on the body corporate, each member of the body corporate, and certain others. See Sections 31 and 59(2) of the Act
[13] Section 7(b) of the Accommodation Module
[15] See Brookwater Vista 2 Home Owners Club [2020] QBCCMCmr 649 at [29]; The Lake Port Douglas [2016] QBCCMCmr 71 at [19]; Calypso Bay Residential Land [2018] QBCCMCmr 195 at [35]
[16] For example sections 169,180 and 184 of the Act
[21] See Sections 182 and 183 of the Act
[22] See Sections 182 and 183 of the Act
[23] See id. The Commissioner produces BCCM Forms 10 and 11 to assist bodies corporate in ensuring compliance with the statutory requirements.
[25] See id. at Sections 182(4)(e) and 183(4)(e)
[26] Until a final order is made, an adjudicator has the jurisdiction and power to extend, vary, renew, or cancel an interim order. See Section 279(2)(b) of the Act
(1968) 118 CLR 618
(2006) 80 ALJR 1672