[2010] VCAT 1272
Victorian Civil and Administrative Tribunal
2010-07-26
Joris J
Original judgment source is linked above.
Section 77 of the Planning & Environment Act 1987; Hobsons Bay Planning Scheme;
Proposed construction of two, two-storey semi-detached-style dwellings. Whether site is vulnerable to future climate-change induced sea level rise and, if so, of what consequence. Whether proposal is respectful of neighbourhood character.
Suburban Blue Print Pty Ltd v Hobsons Bay CC [2010] VCAT 1272
Mr. John Glossop, town planner, of Glossop Town Planning. He submitted his expert report on climate-change-induced sea-level rise by Mr. Joris Jörrissen, of BMT-WBM Pty Ltd, and offered to call Mr. Jörrissen as expert witness, though this was not required.
Construct a pair of two-storey, semi-detached dwellings on a relatively flat site.
Application under Section 77of the Planning and Environment Act 1987 to review Council's refusal to grant a permit.
Clause 32.01-4: construct two or more dwellings on a site.
Clauses 12, 14, 15.08, 16.02 21.06, 22.08, 32.01, 55 and 65.
A rectangular site on the western side of Romawi Street; a frontage of about 20 metres and a depth of 50 metres. Adjoining sites contain a variety of one and two-storey dwellings.
I inspected the subject site and its locality after the hearing
Cadzow Enterprises Pty Ltd v Port Phillip [2010] VCAT 634
... may be vulnerability to coastal hazards and inundation arising from possible future rise in sea level due to coastal climate change and from storm surges.
Is the site vulnerable to future sea-level rise and, if so, is the proposal acceptable?
Is the proposal respectful of neighbourhood character?
... combine to create a development at odds with the generally more modest development surrounding the property and the preferred neighbourhood character.
Construction of two two-storey dwellings above basement parking in accordance with the endorsed plans.
The plans must be substantially in accordance with the plans advertised on 12 October 2009, but modified to show to the satisfaction of the Responsible Authority:
No excavation is allowed within the Tree Protection Zone except with the consent of Council's Town Planning Department and under the supervision of a qualified Arborist.
Street numbers contrasting in colour to the background must be fixed at the front boundary of the property as near as practicable to, or on the letterboxes. Separate unit numbers must be placed adjacent to the front entrance of each dwelling, such numbers must be clearly legible from the access driveway.
All service pipes, (excluding downpipes), fixtures and fittings must be concealed on exposed elevations to the satisfaction of the Responsible Authority.
Any alteration of soil level involving an increased or decreased level at the boundary must be retained by the provision of an adequate retaining wall, which is constructed of brick or masonry or other suitable alternative approved by the Responsible Authority, to buttress the soil against the possibility of shift. The construction of this retaining wall must be carried out by the owner. The retaining wall must remain in place whilst any increase or decrease level is present.
All brickwork on or facing the boundaries of the site must be either raked and cleaned (face brickwork) or rendered and painted or bagged and painted to the satisfaction of the Responsible Authority.
Prior to the occupation of the buildings hereby permitted, areas set aside for parked vehicles and access lanes as shown on the endorsed plans must to the satisfaction of the Responsible Authority be:
(b) Properly formed to such levels that they can be used in accordance with the plans.
Parking areas and access lanes must be kept available for these purposes at all times.
Before any construction or demolition works commence on the land, a secure fence must be provided around the perimeter of the land to prevent access to the land by unauthorised persons. This fence must be maintained for the duration of the construction and demolition, be a minimum height of 1.5m (or such alternative height as is approved in writing by the Responsible Authority), and be constructed to the satisfaction of the Responsible Authority. The gate or opening to the fence must be securely locked at all times when work is not being undertaken on the land.
The owner must meet the costs of all alterations to and reinstatement of, the Responsible Authority and other Public Authority Assets deemed necessary and required by such Authorities for the development. The owner must obtain the prior specific written consent of the Council or other relevant Authority to such alterations and reinstatements and must comply with conditions required by the said Authority in relation to the execution of such works.
Any vehicle crossings must be constructed in the location shown on the endorsed plan to a standard satisfactory to the Responsible Authority. The relocation of any services including electricity poles, drainage pits, Telstra pits, fire hydrants and the like must be at the expense of the owner and approved by the appropriate authority prior to undertaking such works. Consent for such crossings must be obtained through Council's Assets and Maintenance Department prior to construction.
If the nature strip is damaged during construction of the development approved or during the construction of any services, it must be reinstated and made good, (including by the planting of grass) at the cost of the owner to the satisfaction of the Responsible Authority.
Boundary fences must be replaced to the satisfaction of the Responsible Authority at no less than 1.8 metres and no more than 2.0 metres in height and at the cost of the owner unless otherwise agreed to in writing by the Responsible Authority.
This permit will expire if one of the following circumstances applies:
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires or within three months afterwards.
[1] Clause 15.08 (in part), states: "Planning to manage coastal hazards and the coastal impacts of climate change should:
[2] Cadzow Enterprises Pty Ltd v Port Phillip [2010] VCAT 634
[3] And furthermore, this provision would seem to be contrary to Council's last ground of refusal!
Suburban Blue Print Pty Ltd
Hobsons Bay CC [2010] VCAT 1272