[2025] VCAT 668
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-08-15
Peter J
Original judgment source is linked above.
The use includes the griding [sic] of slag into cement productions [sic] and operates 24/7. The raw material is delivered via ship and the Port of Melbourne land. Trucks enter and exit the site via Whitehall Street.
Building and works
The proposal involves the construction of new industrial plant equipment and storage facilities, including:
The existing operations on the site occupy approximately 37,000sqm (3.7 hectares). The new works would occupy approximately 20,000sqm (2 hectares).
(a) Material for use in production of cement products, which may include slag, clinker, limestone and gypsum, being unloaded at the wharf and conveyed to the subject land consistent with existing processes. The material would be conveyed from the wharf to dedicated material storages using enclosed conveyors. > > (b) Material would be transferred from dedicated storages to the mill feed slag bin via modifications and incorporation of belt plough to the existing conveyor. > > (c) Gypsum and limestone will be reclaimed via a front-end loader to a single hopper for transfer to their respective mill feed bins. Clinker will automatically reclaim from the clinker storage to the mill feed bins. > > (d) A common conveyor will be used to feed 'wet' material into the proposed mill for processing. > > (e) Despatch trucks will be loaded from four weighbridges during Stage 1 to six weighbridges with the installation of additional despatch storage as part of Stage 2.
(a) all accessways within the subject site to be sealed; and > > (b) slag and clinker to be stockpiled inside buildings, rather than outside as occurs from time to time in existing circumstances, > > in each case removing potential sources of nuisance dust.
To implement the Municipal Planning Strategy and the Planning Policy Framework.
To provide for manufacturing industry, the storage and distribution of goods and associated uses in a manner which does not affect the safety and amenity of local communities.
Land used for any of the following operations:
a) any process of manufacture;
b) dismantling or breaking up of any article;
c) treating waste materials;
d) winning clay, gravel, rock, sand, soil, stone, or other materials;
e) laundering, repairing, servicing or washing any article, machinery, or vehicle, other than on-site work on a building, works, or land; or
f) any process of testing or analysis.
If on the same land as any of these operations, it also includes:
a) storing goods used in the operation or resulting from it;
b) providing amenities for people engaged in the operation;
c) selling by wholesale, goods resulting from the operation; and
d) accounting or administration in connection with the operation.
If Materials recycling, goods resulting from the operation may be sold by retail.
1 - permit not required, and provides the following conditions opposite the use:
Must not be a purpose listed in the table to Clause 53.10 with no threshold distance specified.
The land must be at least the following distances from land (not a road) which is in an Activity Centre Zone, Capital City Zone, Commercial 1 Zone, Docklands Zone, residential zone or Rural Living Zone, land used for a hospital, an education centre or a corrective institution or land in a Public Acquisition Overlay to be acquired for a hospital, an education centre or a corrective institution:
Must not adversely affect the amenity of the neighbourhood, including through the:
The threshold distance referred to in the table to this clause is the shortest distance from any part of the land to:
An application to use land for an industry, utility installation or warehouse for a purpose listed in the table to this clause must be referred to the Environment Protection Authority under section 55 of the Act if the threshold distance is not to be met or no threshold distance is specified.
Decision guidelines
Before deciding on an application, in addition to the decision guidelines in Clause 65, the responsible authority must consider, as appropriate:
Decision guidelines
Before deciding on an application, in addition to the decision guidelines in Clause 65, the responsible authority must consider, as appropriate:
Core Employment Areas are key industrial and commercial areas with an employment role that need to be protected and enhanced to ensure the City's economic future. Council seeks to protect and enhance Core Employment Areas because they function efficiently for employment purposes. Underutilised industrial premises in Core Employment Areas are not obsolete. Instead, they should be regarded as needing adaption or modification.
There are eight identified Core Employment Area precincts in the City including the State Significant Industrial Precincts at Yarraville Port, Tottenham and West Footscray. The Core Employment Areas are:
Yarraville Port
...
Yarraville Port Core Employment Area
The Yarraville Port Core Employment Area provides an important buffer between established residential areas and the Port of Melbourne and nearby state-significant MHFs. Most of the precinct is affected by the Environment Protection Authority reduced residual air emissions buffer and a MHF buffer where the integrity of these buffers will need to be protected. The Port of Melbourne is a major land owner and intends to use a part of the land for port, logistics and port-related industrial uses.
Francis Street and Whitehall Street form a major port freight route through the precinct. Future use and development in this precinct will need to have regard to any future road infrastructure proposals that impact this route.
Council seeks to:
Core Employment Area objective
To maintain and enhance the economic development role of Core Employment Areas.
Core Employment Area strategies
Encourage a greater range of employment-generating uses.
Encourage development that provides cost-effective and attractive sites for employment generating uses and activities.
Consider as relevant:
Whether proposed use and development in Core Employment Areas is consistent with any relevant adopted framework plan or structure plan prepared for the precinct, including any associated urban design and development guidance.
Ensure that development is not prejudiced and community amenity and human health is not adversely impacted by noise emissions.
Minimise the impact on human health from noise exposure to occupants of sensitive land uses (residential use, child care centre, school, education centre, residential aged care centre or hospital) near the transport system and other noise emission sources through suitable building siting and design (including orientation and internal layout), urban design and land use separation techniques as appropriate to the land use functions and character of the area.
WHAT DOES THE ENVIRONMENT PROTECTION AUTHORITY SAY AND WHAT APPROVALS HAVE BEEN ISSUED?
Noise generation
EPA notes that the proposed 24 hour use of machinery on the site has the potential to generate significant noise, which may impact on sensitive receptors if not appropriately managed.
After a high level review of the submitted Noise Assessment (prepared by SLR Consulting, dated September 2022), EPA understands that the proponent is expected to be able to manage and mitigate this risk, and that the Assessment found that the facility will not exceed the applicable noise limits (as outlined by EPA Publication 1826.4 - Noise limit and assessment protocol for the control of noise from commercial, industrial and trade premises and entertainment venues) at sensitive receptors.
EPA appreciates that the Assessment emphasises the duty holders obligations under the General Environmental Duty (GED) to reduce noise so far as is reasonably practicable. The proponent is thus encouraged to adopt the noise management and mitigation measures provided in the Assessment in alignment with the GED.
In addition, Council and the proponent may refer to the EPA website page 'How to control noise from your business' for additional guidance relating to noise reduction, including generated by trucks and reversing alarms. Potential additional measures may include modifying activities to minimise the amount or duration of reversing alarms required, and minimising truck movements during the night period (when noise limits are lower).
Dust generation and air emissions
It is considered that by grinding and storing fine materials, the proposal has the capacity to generate significant dust and air emissions if not carefully managed.
A technical review of the submitted Air Quality Assessment (AQA, prepared by Ektimo and dated 5 September 2022) has not been undertaken. However, it is understood that the assessment found peak daily and annual average concentrations of PM10 and PM2.5 at the nearest sensitive receptors will comply with air pollution assessment criteria, inclusive of background concentrations. In addition, the AQA provided a risk treatment plan (RTP) for the site, and recommended several risk mitigation measures including the use of dust filters.
EPA expects the proponent to abide by the recommendations of this RTP, and to minimise risks associate [sic] with dust and air emissions o [sic] far as reasonable [sic] practicable, in alignment with the GED. Further guidance regarding dust management is available through the EPA website page 'How to control dust from your business'
EPA encourages and expects the proponent to adopt a preventative approach to the generation of contamination, dust, and noise from all operations on the site.
Should a permit for the proposed use and development be granted by Council, EPA also recommends the inclusion of the following permit notes:
(3) When determining whether or not to issue a development licence, the Authority must take into account -
(a) any measures the applicant has taken or proposes to take in order to comply with the general environmental duty when engaging in the activity that is the subject of the application; and
(b) the impact of the activity on human health and the environment, including the impact on any environmental values identified in any relevant environment reference standard, taking into account any other activities being or proposed to be engaged in by the applicant or any other person; and
(c) the principles of environment protection; and
(d) the best available techniques or technologies; and
(e) whether the activity is otherwise consistent with this Act and the regulations; and
(f) if the regulations require the Authority to refer the application to a prescribed agency, any comments or submissions received from that agency; and
(g) any comments and submissions received -
(i) in response to the notice of the application published under section 52; and
(ii) within the time specified in that notice; and
(h) any prescribed matter
(1) A person who is engaging in an activity that may give rise to risks of harm to human health or the environment from pollution or waste must minimise those risks, so far as reasonably practicable.
(a) any measures the applicant has taken or proposes to take in order to comply with the general environmental duty when engaging in the activity that is the subject of the application; and
(b) the impact of the activity on human health and the environment, including the impact on any environmental values identified in any relevant environment reference standard, taking into account any other activities being or proposed to be carried out by the applicant or any other person; and
(c) the principles of environment protection; and
(d) the best available techniques or technologies; and
(e) whether the activity is otherwise consistent with this Act and the regulations; and
(f) any prescribed matter.
WILL THE PROPOSAL RESULT IN UNACCEPTABLE AIR QUALITY IMPACTS?
Modelled maximum 24 hour average PM10 site contribution (µg/m3) (APAC: 50 µg/m3)
Modelled maximum 24 hour average PM2.5 site contribution (µg/m3) (APAC: 25 µg/m3)
Table 1 Comparison of modelled concentrations for dwelling in closest residential area, Frederick Street
For applications where particulate pollution rather than nuisance dust needs to be assessed or managed refer to Guidance for assessing and managing air pollution in Victoria (EPA publication 1961).
WILL THE PROPOSAL RESULT IN ANY UNACCEPTABLE NOISE IMPACTS?
WILL THE PROPOSAL RESULT IN ANY UNACCEPTABLE TRAFFIC IMPACTS?
The Head, Transport for Victoria has considered this application in conjunction with the existing freight movement bans that apply within the vicinity and has determined that, provided the Permit Holder adheres to the existing truck restrictions imposed along Francis and Whitehall Streets, the additional trips resulting from this development will not disrupt the local network.
The Head, Transport for Victoria has considered this application and does not object to the grant of a permit.
Construct a building or construct and carry out works
Reduce the number of car parking spaces required under Clause 52.06-5
Waive the requirements at Clause 52.34-5 and Clause 52.34-6
(a) details and specifications of all plant and equipment
(b) any changes arising out of the endorsement of reports or documents under the requirements of relevant permissions issued by the Environment Protection Authority under the Environment Protection Act 2017 (Vic)
(c) deletion of the depiction of 'new heavy duty pavement' running north-south between Comben Street and the Whitehall Street access, west of the main storage shed
(d) a minimum of 16 secure bicycle parking spaces conveniently located and undercover
(e) a Feature and Levels Survey that shows the natural ground level of the site
(f) the installation of 'car entry only' and 'car exit only' signs at the Francis Street staff car park crossover
(g) the vehicle crossover details, including:
- dimension of width
- corner splay dimensions
(h) the Environmental Sustainable Design initiatives identified in the report required by Condition No. 7.
(i) any modifications required by the Waste Management Plan required by Condition No. 9.
Compliance with permissions under Environment Protection Act 2017 (Vic)
(a) energy efficiency
(b) water resources
(c) stormwater management that is consistent with Civil Engineering Report (prepared by KPA Management and Consulting Pty Ltd) but modified to provide a stormwater catchment management plan that details reuse.
(d) transport
(e) waste management
(f) urban ecology.
When approved, the Environmentally Sustainable Design report will be endorsed to form part of this permit. No alterations to the endorsed Environmentally Sustainable Design report may occur without the written consent of the responsible authority. The development must be undertaken in accordance with the endorsed Environmentally Sustainable Design report to the satisfaction of the responsible authority.
(a) the management plan must confirm that all waste will be collected by private contractors not Council
(b) the bin storage areas, including dimensions
(c) the screening and bin storage enclosure, including construction details
(d) access for removal and collection.
(a) the contact name and phone number(s) of the site manager
(b) bulk excavation
(c) management of the construction site
(d) land disturbance
(e) hours of construction, including program/duration of works
(f) noise
(g) control of dust
(h) public safety
(i) traffic management
(j) construction vehicle road routes
(k) largest vehicle expected to the site
(l) soiling and cleaning of roadways
(m) discharge of any polluted water
(n) security fencing, disposal of site waste and any potentially contaminated materials
(o) crane locations during construction
(p) location of site offices, and on-site staff parking
(q) redirection of any above or underground services
(r) site lighting during any night works.
The development of each stage must be undertaken in accordance with the endorsed Construction Management Plan for that stage to the satisfaction of the responsible authority.
(a) A Statement of Environmental Audit for the land in accordance with section 210 of the Environment Protection Act 2017 (Vic); and
(b) An Environmental Audit Report for the land in accordance with section 212 of the Environment Protection Act 2017 (Vic).
(a) The development authorised by this permit must not be undertaken unless the Statement of Environmental Audit and Environmental Audit Report states that the land is suitable for the use for which the land is being developed; and
(b) The development authorised by this permit must not be undertaken until compliance is achieved with the terms and conditions that the Statement of Environmental Audit and Environmental Audit Report states must be complied with before the development starts.
(a) constructed
(b) properly formed to such levels that they can be used in accordance with the plans
(c) surfaced with an all weather seal coat.
(d) drained
(e) line marked to indicate each car space and all access lanes
(f) clearly marked to show the direction of traffic along access lanes and driveways
(g) car spaces, access lanes and driveways must be kept available for these purposes at all times
as relevant to the relevant stage and to the satisfaction of the responsible authority.
(a) transport of materials, goods or commodities to or from the land
(b) appearance of any building, works or materials
(c) emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil
(d) presence of vermin
and/or in any other way, to the satisfaction of the responsible authority.
(a) The use of Port of Melbourne Yarraville Berth 5 or 6 for the unloading of product associated with the use of the subject land:
- is not authorised by planning permit PA2302073 issued under the Port of Melbourne Planning Scheme; and;
- is not otherwise lawful under the Planning and Environment Act 1987 (Vic); or
(b) The development and use (including activities forming part of the use) which require permission/s under the Environment Protection Act 2017 (Vic) are not authorised by such permission/s.
(a) The development is not started within two (2) years of the issued date of this permit.
(b) The development of stage one is not completed within four (4) years of the issued date of this permit.
(c) The development of stage two is not completed within eight (8) years of the issued date of this permit.
(d) The use does not start within two (2) years of completion of the development of stage one.
(e) The use is discontinued for a period of two (2) years.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the responsible authority for an extension of the periods referred to in this condition.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Permit No. TP588/2012 (V0), issued to land at 295 Whitehall Street, Yarraville.
[3] The applicant submitted that in the Port Zone under the Port of Melbourne Planning Scheme ('PMPS'), permission is required to use the Port of Melbourne land as proposed. It further submitted that that permission has been granted through Planning Permit PA2302073. The permit was granted by the Minister for Planning as the responsible authority for the administration of the PMPS and allows the use of land at 267 Whitehall Street, Yarraville, for industry (cement production' pursuant to clause 37.09-1 of the PMPS.
[4] Operating Licence Number OL000128502, issued on 27 July 2016.
[5] The applicant confirmed that in excess of 150,000 tonnes per year will be produced by the proposed operation.
[6] Regulation 16(1) and Schedule 1 Item 56 (activity type H01 - Cement works (operating cement works in which cement clinker, clays, limestone or like materials are ground)).
[7] Regulation 16(2) and Schedule 1 Item 56 (activity type H01).
[8] Air Quality Expert Evidence by Mr Peter J Ramsay of Peter J Ramsay & Associates dated 30 May 2025, Tribunal Book pages 2642 - 2694
[9] Air Quality Assessment for a Proposed Cement Grinding Plant Addition Yarraville, Victoria by Ektimo dated 5 September 2022, Tribunal Book pages 127 - 229.
[10] Steel Cement Air Quality Impact Review by Dr Iain Cowan of Zephyr Environmental dated 30 May 2025, Tribunal Book 2583 - 2641.
[11] Guidelines for assessing and minimising air pollution in Victoria, EPA Publication 1961.2.
[13] Zephyr Environmental memorandum dated 10 June 2025, Tribunal Book 4147 - 4153.
[14] Environment Protection Authority (June 2022).
[15] Environment Protection Authority (August 2024).
Steel Cement Pty Ltd
Maribyrnong CC [2025] VCAT 668