[2025] VCAT 1018
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-11-18
Original judgment source is linked above.
IS THE PROPOSAL AN APPROPRIATE BUILT FORM RESPONSE TO ITS CONTEXT?
Residential Areas Framework
The Residential Areas Framework addresses the issues affecting the municipality as a result of increasing population, and changes to household size and structure, including impacts on neighbourhood character. The ability to protect and enhance valued neighbourhood character across Banyule depends on directing new housing to areas that are able to accommodate greater densities and increased diversity.
The vision for each residential area identified in Table 1 is based on its proximity to shops, services and transport, as well as its walkability, neighbourhood character, and heritage and landscape qualities.
Diversity
These areas typically have the following characteristics:
Diversity Areas will provide for shop-top and apartment living in higher density mixed use and residential developments. These areas include strategic redevelopment sites that provide for higher density housing.
Development will make a positive contribution to the identity of the activity centre and the preferred character of surrounding residential neighbourhoods.
In these areas people live close to train stations, transport interchanges, shops, services and nodes of employment. These areas include higher density and some medium density housing opportunities.
Postcode 3081 Urban Design Framework Diversity Areas
Postcode 3081 is renewing. Properties along main roads, along the creekside area at interfaces with parks, and close to the Bell Street Mall Neighbourhood Activity Centre and Olympic Village, are well located to support increased density on consolidated lots.
Policy application
This policy applies to land identified on the Postcode 3081 Urban Design Framework Plan forming part of this clause.
Objective
To guide the future identity of the Postcode 3081 Urban Design Framework area while providing for housing change and urban renewal.
Strategies
Establish a cohesive and contemporary architectural character that responds to the natural creek environment and treed character of the suburb.
Create an inviting, safe and vibrant public realm.
Avoid development that would entrench buildings and/or uses that are inconsistent with the preferred built form or vision for the urban renewal area.
Maintain good solar access to footpaths, in addition to existing and proposed public open space.
Ensure buildings include the use of natural materials and colours of muted tones that blend in with the surrounding environment.
...
In Areas 1-4:
9.4 Importantly and relevant to this proposal, opportunities for appropriately scaled development by consolidating smaller lots is not only encouraged by the DDO14 provisions, but also necessary to realise the development potential of the site and the vision developed in the Postcode 3081 Urban Design Framework.
To encourage site consolidation enabling preferred scale and dwelling form outcomes that improve housing diversity.
Ms Bell's evidence showed why at least three properties may need to be consolidated to achieve six levels and comply with the proposed side setbacks. She explained that this is why it is unlikely that there will ever be continuous six storey built form along the main roads. Ms Bell considered that a mix of heights between four, five and six storeys would be a more likely outcome.[4]
The Panel agrees with Ms Bell the subject area is likely to evolve into a mix of building heights rather than a continuous streetscape of six storey buildings.[5]
In contrast, the proposal that is now before me could not be permitted in most other residential zones, and it has a higher site coverage (59%) and lower permeability (27%) than the proposal that was before the Tribunal in this previous decision.
WILL THERE BE ANY UNREASONABLE OFF-SITE AMENITY IMPACTS?
Any part of a building above 3 storeys should be setback a minimum of 3 metres from the front building line and a further 3 metres above 5 storeys
6 metres where a building does not share a boundary with a park plus 1 metre for every metre of height over 10.9 metres
3 metres where a building shares a boundary with a park plus 1 metre for every metre of height over 10.9 metres
2 metres plus 1 metre for each metre of height above 3 storeys
IS AN APPROPRIATE LEVEL OF INTERNAL AMENITY PROVIDED?
DOES THE PROPOSAL APPROPRIATELY PROVIDE FOR CAR PARKING AND TRAFFIC MOVEMENTS?
Coucnil's (sic) Traffic and Transport Team have reviewed the proposed reductio (sic) in car parking and advised that they have no objection to the reduction of one visitor parking space noting that Milton Court is a residential street with no parking restrictions with additional parking available on Southern Road as well as a bus stop servicing two routes in close proximity.
Waste and recycling objectives
To ensure dwellings are designed to encourage waste recycling.
To ensure that waste and recycling facilities are accessible, adequate and attractive.
To ensure that waste and recycling facilities are designed and managed to minimise impacts on residential amenity, health and the public realm.
Standard B45
Developments should include dedicated areas for:
I am satisfied with on-street collection. The site enjoys a substantial frontage of 53.4m (minus the proposed crossover) for the storage of bins for 7 dwellings. The WMP proposes only 7 bins in total. Accordingly, the sites frontage has adequate space to place bins from the seven proposed dwellings side by side.
The private waste collection vehicle will be required to drive along Milton Court and briefly prop while collecting the waste before continuing. There is no material difference in truck travel path between the Council or private waste vehicle. Any one truck would only be collecting 3 bins, which means that the vehicle is propping for only a short time.
The potential challenge in navigating Milton Court raised by Council's waste team is a result of the 6.5m carriageway width. In driver's park opposite one another (illegally) or closely staggered, this may pose a challenge for a Council's waste vehicle. The solution to this existing situation is to formally ban on-street parking on one side of Milton Court by signage (as opposed to relying on the road rules under existing conditions). This would not reduce the amount of legal, available on-street parking. It would only regularise on-street parking and ensure a clear traffic lane at all times.
A private waste collection could be limited to the mini-waste truck (6.4m long x 1.7m wide), which is substantially smaller than a typical Council truck (10m long x 2.5m wide). This truck would navigate the street much more easily than Council's truck.
On-site waste collection in my view is not practical. Clause 55.05-5 requires that on-site waste collection be completed as follows:
Where access is provided for private bin collection on the land the design of access ways must allow the vehicle to enter and exit in a forward direction.
However, is no requirement in Clause 55.05-5 for private collection to be on-site. It is not possible to turn around the smallest commercial waste vehicle around on-site within the available accessway. Modifying the on-site carpark to make this possible would result in
the loss of a garage or car space. In my view, given that waste collection can be readily completed from the kerbside in a local street and this development is modest in scale, there is no need to require on-site waste collection in this instance.
Accordingly, I am satisfied that the waste collection arrangements are acceptable.
To construct a building and construct or carry out works.
(a) The doors of the under stair storage in the garages of Dwellings 4, 5, 6 and 7 altered to open outward;
(b) Deletion of notation indicating Tree #5 to be relocated;
(c) Notations for the use of double-glazed windows in conjunction with the SDA on all applicable/habitable windows;
(d) Selection of a roof colour to minimise the urban heat island effect with a maximum Solar Absorptance (SA) of 0.70;
(e) A schedule of external building materials, colours and finishes, including details of cladding and roofing materials.
(f) A notation that obscured film or spray applied to clear glazing is not accepted as 'obscured glazing';
(g) A Landscape Plan in accordance with Condition 3 of this permit;
(h) A Sustainable Design Assessment (SDA) in accordance with Condition 5 of this permit;
(i) A Water Sensitive Urban Design (WSUD) Drawing in accordance with Condition 6 of this permit;
(j) An Environmentally Sustainable Development (ESD) Drawing in accordance with Condition 7 of this permit;
(k) Tree Protection Fencing in accordance with Condition 8 of this permit.
(l) A Waste Management Plan in accordance with Condition 10 of this permit;
(m) The provision of a visitor bicycle space at the north-eastern 'cut-out' of the ground floor of Dwelling 1. This is to be facilitated by reducing slightly the internal space in Dwelling 1 at ground floor, to the extent required to make the external north-south wall of this cut-out a minimum length of 1700mm.
(n) A change to the car space for Dwelling 7 so as to increase its width to 2800mm, which is to be achieved by reducing the setback to the eastern boundary of the review site to the car space for Dwelling 1. This increased width to the car space for Dwelling 7 is to enable a reduced aisle width of 5800mm to the northern boundary, and in turn allow a gap to be created between the car space and the entry door for Dwelling 7.
(o) The provision of a partly open aspect to the northern edge of the first floor balcony to Dwelling 1, and the provision of a screening device to restrict overlooking to the adjoining property to the north.
(a) Amendments required by Condition 1 of this permit;
(b) Planting adjacent to driveways and within landscaping zones to consist of varying heights and species;
(c) Provision of the following minimum plantings:
- A small canopy tree (minimum mature height of 5m) planted within the front setback of Dwellings 1, 4, 5, 6 and 7;
- A medium canopy tree (minimum mature height of 8m) planted at a semi-advanced state (minimum pot size 16 litre) in the northeast corner of the site but outside the easement;
(d) An indigenous and/or drought tolerant planting theme;
(e) A schedule of all proposed trees, shrubs and ground cover, which includes the location and size at maturity of all plants, the botanical names of such plants and the location of all areas to be covered by grass, lawn or other surface material as specified;
(f) Tree species and planting locations must be carefully selected to avoid canopy or root conflicts with overhead wires, property boundaries, easements and existing trees;
(g) Location and details of paving, steps, retaining walls, water tanks, clotheslines, fence design details and other landscape works including cut and fill;
(a) Dwellings 4, 5, 6, and 7 not less than 7 Stars;
(b) Average rating of 7 Stars across for Dwellings 1, 2 and 3 with no unit achieving less than 6 Stars.
The Final NatHERS Star Rating Certificates must be provided at the completion of the development and at the request of the Responsible Authority.
(a) Deletion of the weighted average results from the Energy Rating Results table on page 14 of the SDA;
(b) Deletion of all references in the SDA that state that a minimum of 7 Star NatHERS will be achieved with the higher rating stated in the Energy rating results table on page 14 of the SDA (updated in accordance with Condition 1(b)) used instead;
(c) The annual heating loads, cooling loads and NatHERS star ratings, entered into the BESS report altered to be consistent with those provided in the Energy Rating Results table on page 14 of the SDA;
(d) The submitted STORM report updated to indicate 2 occupants for Dwelling 2 with appropriate additional water treatment measures to maintain a score of at least 100 per cent if the reduced occupants result in a score under 100 per cent;
(a) All features nominated within the associated STORM Report identified under Condition 5, as follows:
- The location and storage volume (Litres) of rainwater storage tank(s), pumps and connections to end-uses, such as toilets and laundry, as claimed;
- A roof plan demonstrating the portion of the roof diverted into the rainwater treatment/storage device;
- The location and type of any required other proprietary devices employed to improve the quality or reduce the loads of stormwater run-off from the site;
(b) A Maintenance Schedule for stormwater treatment devices such as rainwater tanks, toilet connections and raingardens, including responsibility, key serviceable components and frequency of maintenance;
Environmentally Sustainable Development (ESD) Plan
(a) Tree protection zone measures are to be established in accordance to Australian Standard 4970-2009 and including the following:
- Erection of solid chain mesh or similar type fencing at a minimum height of 1.8 metres held in place with concrete feet;
- Signage placed around the outer edge of perimeter fencing identifying the area as a TPZ. The signage should be visible from within the development, with the lettering complying with AS 1319-1994;
- Mulch across the surface of the TPZ to a depth of 100mm and undertake supplementary watering in summer months as required;
- No excavation, constructions works or activities, grade changes, surface treatments or storage of materials of any kind are permitted within the TPZ unless otherwise approved within this permit or further approved in writing by the Responsible Authority;
- All supports, and bracing should be outside the TPZ and any excavation for supports or bracing should avoid damaging roots where possible;
- No trenching is allowed within the TPZ for the installation of utility services unless tree sensitive installation methods such as boring have been approved by the Responsible Authority;
- Where construction is approved within the TPZ, fencing and mulching should be placed at the outer point of the construction area;
- Where there are approved works within the TPZ, it may only be reduced to the required amount by an authorised person only during approved construction within the TPZ and must be restored in accordance with the above requirements at all other times;
- For street trees, protection must be to the extent of the entire nature strip where the Calculated Tree Protection Zone (TPZ) occurs (not obstructing a footpath or cross-over);
- For neighbouring trees, protection must be to the extent of the calculated Tree Protection Zone (TPZ) where it occurs within the subject Land;
- Ground protection must be laid down where access is required through a TPZ outside the fenced area detailed in (a). It must consist of a permeable membrane beneath a layer of mulch or crushed rock with rumble boards on top. Rumble boards should be of a suitable thickness to prevent soil compaction and root damage. Ground protection must only be removed once all buildings and works have been completed;
- Once installed a TPZ must be maintained until the conclusion of all works on site, including landscaping to the satisfaction of the responsible authority;
Statement Of Compliance - Tree Protection Zone
(a) Details as to how prospective purchasers will be advised that all refuse and recycling collection for the property will be provided by a private contractor at the expense of the owner of the land;
(b) Collection to be by way of private contractor;
(c) How waste and recycling materials are to be managed within the site and collected from the site;
(d) That bins will be transferred to the street for collection by residents;
(e) Bin collection is to occur from kerbside in Milton Court;
(f) The location of the bin store and any bin wash;
(g) Anticipated frequency, hours and duration of collection(s);
(h) The size of the waste collection vehicle;
(i) Specify times for such collection;
(j) How bin storage areas will be maintained to ensure there is no unreasonable emission of odour or noise;
Once approved, the Waste Management Plan must be adhered to by the owner(s) and operator(s) of the development at all times unless otherwise approved in writing by the Responsible Authority.
(a) The use of an On-site Stormwater Detention (OSD) system;
(b) The connection to the Council nominated Legal Point of Discharge;
(c) The integration, details and connections of all Water Sensitive Urban Design (WSUD) features in accordance with the endorsed STORM report;
(d) A properly prepared design with computations for the internal drainage and method of disposal of stormwater from all roofed areas and sealed areas;
(e) The Tree Protection Zone and Structural Root Zone of Trees #1, #2, #3 and #4 as identified in the submitted Arboricultural Report shown to be retained.
Removal and Replacement of Council Street Trees - Payment
Residential Reticulated Gas Service Connection
(a) The development is not started within two (2) years of the issued date of this permit.
(b) The development is not completed within four (4) years of the issued date of this permit.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the responsible authority for an extension of the periods referred to in this condition
[1] Section 4(2)(d) of the Victorian Civil and Administrative Tribunal Act 1998 (Vic) states a failure to make a decision is deemed to be a decision to refuse to make the decision.
[2] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] With reference to the use of these words at Clause 65 of the Banyule Planning Scheme.
[4] Page 33 of the Panel Report dated 23 August 2019.
[5] Page 34 of the Panel Report dated 23 August 2019.
STB Property Holdings Pty Ltd
Banyule CC [2025] VCAT 1018