Spectrum [2025] QBCCMCmr 458
Body Corporate and Community Management Act 1997 (Qld) (), and (3)(a)
a) Demolition of selected non-structural walls to reconfigure the internal layout; > > b) Installation of new non-structural walls; > > c) The creation of a new room; > > d) Reflooring with either tiles or engineered timber; > > e) Replacement of existing window furnishings; > > f) Replacement or adding air conditioning units; etc.
a) A copy of drawings ('Floor Layout Plan') setting out the reconfiguration of the lot as prepared by an engineering company; and > > b) An invoice in relation to works proposed to modify the fire sprinkler infrastructure ('Fire Sprinkler Works') within the lot.
a) That unless the respondent has body corporate approval or the authority of an adjudicator's order, the respondent must, within six months of the date of the order, reinstate Lot 47 to its condition prior to the unauthorised demolition and renovation works to the same; > > b) Such other or alternate orders as the adjudicator reasonably considers necessary or appropriate in the circumstances.
a) That the respondent immediately cease any further demolition or renovation works to Lot 47 until such time as he has body corporate approval or the authority of an order of an adjudicator; or in the alternative > > b) That the respondent immediately cease any further demolition or renovation works to Lot 47 until such time as he has provided the applicant body corporate with the following: > > (i) A report from a licensed structural engineer which confirms that the works have not and, following completion, will not, adversely affect the structural integrity or soundness of the foundation structures and essential supporting framework, including any load-bearing walls, in Lot 47; and > > (ii) A report from a licensed fire safety inspector which confirms that the works have not and, following completion, will not, adversely affect any fire safety utility infrastructure (including sprinkler systems) within Lot 47; and
d) Such other or alternate order as the adjudicator reasonably considers necessary or appropriate in the circumstances.
a) His contract to purchase Lot 47 was expressly subject to the former owner lodging a renovation application with the applicant body corporate noting that the works will commence upon settlement; > > b) Accordingly, the former owner lodged the application with the applicant body corporate, with the same being resubmitted in the correct form by the respondent; > > c) The applicant body corporate indicated that it would respond within four weeks but did not do so; > > d) The respondent waited four weeks for a response from the applicant body corporate, and upon a lack of objection or request for further information, he commenced the works. 'The Body Corporate's administrative delay cannot retrospectively invalidate our lawful position'; > > e) The respondent complied with subsequent requests for information promptly, including requests regarding soundproofing; > > f) The solicitor for the applicant body corporate confirmed verbally that the respondent has provided all information required for the committee to make a decision. Accordingly, the delay in making a decision is not attributable to a deficiency on the part of the respondent but of the committee's internal issues; > > g) The Olive Tree report confirms that there has been no structural impact from the works, or any cracking, movement or any adverse impacts, or any damage to common property. This report makes clear that the applicant body corporate's allegation of structural alterations has no factual basis; > > h) Under the legislation, the applicant body corporate must not unreasonably withhold approval;
a) Plans of the proposed changes; > > b) Local council approvals; > > c) A certificate from a registered structural engineer, certifying that the works will not affect the structural integrity of the building; > > d) A deed of indemnity in respect of any costs incurred by the applicant body corporate as a result of and incidental to the request for approval, the carrying out of the works and installation; and > > e) A report prepared by an acoustic engineer which confirms that appropriate sound-proofing measures have been taken and the product is fit for purpose and meets the required level of floor impact isolation of LnTw 60 or less.
[7] The CMS includes the scheme's by-laws
[8] Sections 276)(1)(a) and (b) of the Act
[10] See Brighton on Broadwater Breezes [2018] QBCCMCmr 243 at [8]
[13] For general principles see for e.g., Australian Broadcasting Corporation v O'Neill [2006] HCA 46 and SDW2 Pty Ltd v JLF Corporation Pty Ltd & Ors [2017] QSC 1
[14] Cohen v Peko-Wallsend Ltd [1986] HCA 70 at [6]
[15] Meagher, Gummow and Lehane's Equity: Doctrines & Remedies (J.D. Heydon, M.J. Leeming, P.G. Turner) (Fourth Edition) (Sydney: LexisNexis Butterworths, 2002) at [21-395]; Bingham & Anor v 7-Eleven Stores P/L [2003] QCA 402 at [106]-[108]