$224 Open Space Links and Cycleway ( 6901)
$42 Childrens Facilities (6902)
$3920 Libraries (6903)
$4060 Sport Field Establishment (69040
$4732 Administration and Studies (6922)
$4326 Community Facilities (6906)
$83048 Local Open Space (6912)
$3024 Roads and Traffic (6915)
$370 Office (6924)
$103,660 Total
Calculated using 14 units; 144 Sq M Office
These amounts have been calculated using the Warringah Section 94 Contribution Plan 2001 adopted 22/5/2001 effective 1st June 2001 . They are current at the time of issue of this Consent. They are current at the time of issue of this Consent. They will be adjusted at the time of payment according to the quarterly CPI (Sydney-All Groups Index). An updated schedule of Council's contribution rates is issued each quarter and is available at Council's offices. Please ensure that you provide details of this Consent when paying contributions so that they can be easily recalculated.
34. Hoardings and child proof fencing to residential properties shall be installed to prior to construction/demolition commencing, and shall remain in place for the duration of the work. No construction access is permitted other than at the approved vehicle crossing/s into Pittwater Road. All loading, unloading and storage of materials for works within the site shall take place within the hoarding enclosure. (C87)
35. The on-site stormwater detention facility to control the rate of stormwater runoff from the site to be in accordance with Warringah Council's publication "On-Site Stormwater Detention - Technical Specification, March 1998". (C68)
36. All works on the site shall be undertaken to prevent erosion and transport of soil and sediment off the site and onto adjoining properties. Measures shall be taken in accordance with the requirements of Warringah Council's Specification for Erosion and Sediment Control and shall be submitted to the council or certifier prior to issue of the Construction Certificate. (C41)
37. Provision shall be made throughout the period of construction to prevent transmission of soil to the public road and drainage system by vehicles leaving the site. (C44)
38. Construction of footpath paving consisting of pavers in accordance with Council's standard specifications for engineering works. (C84)
39. Hoardings shall be installed to prior to construction/demolition commencing, and shall remain in place for the duration of the work. No construction access is permitted other than at the approved vehicle crossing/s . All loading, unloading and storage of materials for works within the site shall take place within the hoarding enclosure. or alternatively in a dedicated construction zone approved by Council in St Davids Avenue for the purpose of loading and unloading materials. (C87)
40. Payment to Warringah Council of a $10,000 bond as security against damage to Council's roads caused by the transport and disposal of materials and equipment to and from the site to Account No.009 TF037. This amount to be paid prior to the issue of the Construction Certificate and to be verified by the accredited certifier. (C108)
41. All construction and restoration work on Council's road and footpath area are to be carried out strictly in accordance with the approved drawings and Council's Standard Specifications. (C110)
42. The developer/applicant is to obtain a Road Opening Permit and pay all appropriate charges prior to commencement of any work on Council property.
The developer/applicant shall be responsible for all public utilities and services in the area of his work, and as such shall notify all relevant Authorities, and bear all costs associated with any repairs and/or adjustments as those Authorities may deem necessary. (C113)
43. Lighting, fencing, traffic control and advanced warning signs shall be provided for the protection of the works and for the safety and convenience of the public and others, to the satisfaction of the Principal Certifying Authority, and in accordance with Council's Standard specifications for engineering works. Traffic movement in both directions on public roads, and vehicular access to private properties is to be maintained at all times during the currency of the works. (C117)
44. Other than with respect to the dedicated Construction Zone referred to in Condition 39 above, footpaths and roadways are to be kept free of obstruction by building materials and plant and concrete trucks, pumps and/or agitators are to be kept within the building site. No concrete or slurry being discharged onto Council's street surfaces. (C321)
45. Provision of a hoarding to the frontage of the property. A separate application to be made to Council for this purpose. This hoarding is to be erected before any work is commenced on site. (C341)
46. The payment of $5,000 to account Reg 009 - *TF 036 prior to issue of a construction certificate as security to ensure that:
a) all silt and sediment control measures are installed and maintained;
b) there is no transmission of material, soil etc off the site and onto the public road and/or drainage systems; and
c) maintenance of all facilities in accordance with Council's Specification for Erosion Control and Sediment Control. (C42)
47. Creation of a Positive Covenant on the title of the land requiring the proprietor of the land to maintain any water quality control and/or stormwater detention structures required by this Consent, in accordance with the standard requirements of Council. The Positive Covenant is to be prepared by the applicant using terms acceptable to, and which are available from Warringah Council. (C51)
48. Where any conditions of this Consent require dedication, consolidation, easement or covenant, the number allocated by the Land Titles Office to the documents and/or plans referred to shall be advised in writing to Warringah Council, together with a letter of intent to proceed with the Positive Covenant prior to occupation. A certified copy of the documents shall be provided to Warringah Council after final approval and registration has been effected by the Land Titles Office. (C57)
49. An application is to be made to Sydney Water in accordance with the provisions of Division 9, Section 73 of the Water Board Corporation Act 1994 and notice of requirements obtained prior to the issue of a Construction Certificate. (C58)
50. Provision of 1 vehicle crossing, 6.0 metres wide in accordance with Warringah Council Drawing No.A4-3330 to approved levels and specifications. An application for street levels is to be made prior to issue of the Construction Certificate. (C89)
51. Construction of approved kerb laybacks in accordance with the details shown on Warringah Council Plan A4-2276. (C90)
52. Prior to finalising detailed designs of the proposed development, the applicant should check all existing public service utilities adjacent to the site and ensure that where necessary appropriate arrangements are made for the relocation and/or adjustment of any services at the applicant's expense. (C96)
53. The requirements of condition ending in code C68 shall be designed and supervised during the works by an Engineer with qualifications and expertise recognised by the Institute of Engineers Australia as being adequate for the purpose. The Engineer shall certify prior to occupation or release of Linen Plan of Subdivision that the works have been completed strictly in accordance with the approved design and to appropriate standards of workmanship. (C98)
54. With respect to condition ending in code C68, design details, computations and/or support documentation shall be submitted with the Construction Certificate and to satisfy the above conditions prior to the issue of the Construction Certificate. (C99)
55. Council's Development Engineer is to be given 24 hours notice when the works reach the following stages
a) Subgrade level/basecourse level/footpath paving
NOTE: Any inspections carried out by Council do not imply Council approval or acceptance of the work, and do not relieve the developer/applicant from the requirement to provide an engineer's certification as conditioned above. Council approval or acceptance of any stage of the work must be obtained in writing, and will only be issued after completion of the work to the satisfaction of Council and receipt of the required certification. (C127)