The applicant shall comply with the Traffic Management Report prepared by Shane Foley dated 28 September 2001.
All earthworks associated with the development shall be stabilized in accordance with standard engineering design and practices against erosion and failure. No earthworks must encroach across neighbouring property boundaries.
Before any drainage construction is undertaken on site, approval is required by Council for the following items:
(a) Plans showing the proposed arrangement of the detention systems.
(b) Where the surface storage areas (for example on paving) are relied on for reduction of flows to meet the above requirements, detail of the location of the areas, their grading and the pipe systems serving the areas shall be provided such that the flow reductions are appropriate and achievable to the reasonable satisfaction of the Council.
The stormwater discharge to the Hampton Street system shall not be increased above current levels for all events greater than a 5 year ARI up to and including a 100 ARI event.
On-site detention measures for the whole site to control stormwater runoff shall be installed, designed and certified by a Chartered Professional Engineer to control peak flows from 1 in 10 ARI to 1 in 100 ARI events.
The stormwater shall be disposed of in such a manner that it does not flow or discharge onto land of privately owned adjacent land or lie against any building or create insanitary conditions.
Gross Pollutant Traps shall be installed for each separate drain line.
The Gross Pollutant Traps shall be installed, designed and certified by a Chartered Professional Engineer prior to any further development occurring on the site.
29. Debris and sediment control measures shall be installed prior to construction commencing and maintained afterwards to ensure debris, soil, soil sediments and litter is maintained within the construction site. Such pollution prevention measures, shall generally be in accordance with those Environment Protection Authority's Stormwater Pollution Prevention Codes of Practice appropriate to the proposed development. Prior to construction commencing a copy of the above plan shall be lodged with Council for approval.
30. The wall on the northern side of the proposed carpark to the Audi workshop shall not be breached nor pedestrian or vehicular access taken from the carpark to the said Audi workshop without Development Approval.