Building and Property List; major domestic building contract for erection of house on highly reactive clay site; whether proper workmanship used in construction; extensive distress to structure caused by edge heave; whether appropriate to award damages representing the cost of demolition and reconstruction; whether damages should include any 'betterment' element representing the cost of upgrading the footing slab; damages awarded for the cost of demolition and reconstruction excluding cost of upgrading slab.
Softley v Metricon Homes Pty Ltd (Building and Property)
Scrape approx 200mm on RL 100.0 and spread fill over remaining building area to level.
At this time ... I noticed the first of many areas where the ceiling had separated from the cornice.
... our home went from just having internal issues that were visible to having external damage in the form of the whole back left-hand side having severe cracking and splitting through the bricks and mortar from the top corner right through to the bottom corner of that side of the building, which is the real wall of the rumpus room.
Found the internal wall corresponding with the back wall [viz. of the rumpus room] had cracked and what appeared to be squashed from one end to the other [sic]. The cornice had completely split in half and there were specks of plaster all over the carpet in that room that had fallen from the ceiling ...
to hold doing any landscaping until [Metricon] tested the plumbing to make sure there were no leaks underground. [Metricon] tested the plumbing and no leaks were found.
... generally in good condition. However, the following main areas of distress were noted:-
Spot levels were taken across the floor of the dwelling, which indicate that the slab has undergone edge heave around the structure, most pronounced at the north west corner - 44mm, and least pronounced at the opposite corner (garage corner) - approx 16mm.
Pebbles can admit moisture and prevent free evaporation. Moreover, the shallow troughs, which have been dug out to hold them, have the potential to hold water against the footings, leading to additional expansion of the clays beneath.
The cause of the heave, according to Structural Works, was 'the ingress of water to the footing system causing the underlying clays to swell'. They said the possible sources of the moisture ingress were:
of which there have been several since commencement of construction, it is probable that water has overflowed at the shoes and entered the stormwater trench. If the grade of the trench is inadequate, some of the water will have lain in the trench over time and seeped into the clay beneath the slab. What we have seen of the CCTV record of the stormwater inspection, in conjunction with the written report by Austest, renders this probable and if proved has a long term adverse effect on the footing performance.
The fact that the areas showing heave correspond precisely with the cut zone is suggestive. It is probable that during construction, and subsequently, water has flowed down the slope and been contained in the cut zone of the building platform, ponding against the slab. We also consider it possible that this may continue to occur.
freed from the trusses and 'dropped-back' to rest on cornices where separation has occurred. Ceiling sheets should not be glued to truss bottom chords near internal walls.
comparison between the two spot level surveys indicate [s] that the majority of the slab has remained within a recorded 4mm of its previous figure.
They said that the west side of the rear had moved the greatest amount toward original levels, viz. subsided. They said the rumpus room wall had subsided approximately 8mm but the heave to the north elevation had increased. The report said:
To explain this effect we point to the fact the direction of the recent heavy rainfall events coming from the north-west, have been concentrated on the elevation containing the pebbled garden beds previously mentioned.
They said that paving had been added to the dwelling and was 'very well shaped to drainage points and is a good width'.
The Points of Claim also alleged a breach by Metricon of the terms of the Structural Guarantee.
Damages were claimed, representing the cost of rebuilding of $259,729 inclusive of GST, alternatively, the cost of rectification work of $122,427 inclusive of GST. Further, damages for alternative accommodation for a period of 12 months during reconstruction of $335 per week, calculated at $17,420 with removal expenses of $10,020 were also sought.
would have established normal moisture conditions at the front of the house which would likely have
(a) limited further increases in the slab movement in that area; and
(b) ensured ongoing cracking [was] within levels anticipated by AS2870.
To enable the achievement of nationally consistent, minimum necessary standards of relevant health, safety (including structural safety and safety from fire), amenity and sustainability objectives efficiently.
The Regulation generates benefits to society greater than the costs (that is, net benefits); and ... the competitive effects of the Regulation had been considered and the Regulation is no more restrictive than necessary in the public interest.
As a result, according to Mr Fox, if his committee were to stipulate a more expensive and conservative mode of construction for slab footings, the Codes Board would require it to identify some offsetting saving in the process of construction so as to avoid an increase in the net cost of building. Standards Australia published a supplement to AS 2870 - 1996 which stated at C1.3 under the heading Performance of Footing Systems:
The current costs of failure [viz. of slab footings] are modest compared with the costs of conservative design. Moreover, if the designs in the Standard are followed, failures should be very rare. Expectations of performance of footing systems on reactive sites depend upon the adopted standard of post-construction maintenance. If the homeowner's maintenance role is to be diminished, or higher expectations of performance are demanded, then the footing system should be designed according to engineering principles ...
Performance is based largely on the size and frequency of cracking in walls and concrete floors. All building materials move eg. bricks expand, timber and plasterboard shrink. Consequently some cracking in houses is inevitable and is independent of foundation movement. On reactive and soft or non-uniform soils, foundation movement adds to this tendency to crack. A large number of houses in Australia are constructed on clays that move with changes of soil moisture conditions arising from the imposition of the house on the ground. Generally the movements will be moderate and the prescribed designs in the Standard will cope with the movement. If extreme moisture conditions occur, which may have been avoided had a reasonable level of site maintenance been achieved, then significant damage will be more likely and probably more severe. To attempt to design for such conditions on every clay site would add significantly to the cost of housing throughout Australia.
The footing systems complying with this Standard are intended to achieve acceptable probabilities of serviceability and safety of the building during its design life. Buildings supported by footing systems designed and constructed in accordance with this Standard on a normal site (see Clause 1.3.2) which is -
are expected to experience usually no damage, a low incidence of damage Category 1 and an occasional incidence of damage Category 2.
The owner is responsible for the maintenance of the building and the site and should be familiar with the performance and maintenance requirements set out in the CSIRO pamphlet, 10-91, 'Guides to Homeowners on Foundation Maintenance and Footing Performance'.
Extensive repair work involving breaking-out and replacing sections of walls, especially over doors and windows. Window and door frames distort. Walls lean or bulge noticeably, some loss of bearing in beams. Service pipes disrupted.
Cracks can be repaired and possibly a small amount of wall will need to be replaced. Doors and windows stick. Service pipes can fracture. Weather tightness often impaired.
Local deviation of slope, from the horizontal or vertical, of more than 1/100 will normally be clearly visible. Overall deviations in excess of 1/150 are undesirable.
We were informed in final submission by Mr Margetts and Mr Scheid that there were problematic slopes in the house. Given that these were not the subject of evidence or observation at the view, we put them to one side and focus only upon the issue of differential movement.
The following warranties about the work to be carried out under a domestic building contract are part of every domestic building contract -
(a) the builder warrants that the work will be carried out in a proper and workmanlike manner and in accordance with the plans and specifications set out in the contract;
(b) the builder warrants that all materials to be supplied by the builder for use in the work will be good and suitable for the purpose for which they are used and that, unless otherwise stated in the contract, those materials will be new;
(c) the builder warrants that the work will be carried out in accordance with, and will comply with, all laws and legal requirements including, without limiting the generality of this warranty, the Building Act 1993 and the regulations made under that Act;
(d) the builder warrants that the work will be carried out with reasonable care and skill and will be completed by the date (or within the period) specified by the contract;
(e) the builder warrants that if the work consists of the erection or construction of a home, or is work intended to renovate, alter, extend, improve or repair a home to a stage suitable for occupation, the home will be suitable for occupation at the time the work is completed;
(f) if the contract states the particular purpose for which the work is required, or the result which the building owner wishes the work to achieve, so as to show that the building owner relies on the builder's skill and judgement, the builder warrants that the work and any material used in carrying out the work will be reasonably fit for that purpose or will be of such a nature and quality that they might reasonably be expected to achieve that result.
(a) missing double studs under girder truss locations;
care shall be taken with surface drainage of the allotment from the start of construction. The drainage system shall be completed by the finish of construction of the house. (Paragraph 5.5.3a)
This requirement attaches to sites classified under the Standard as 'H' or 'E'. In addition, paragraph 6.6(c) provides:
Water run-off should be collected and channelled away from the house during construction.
Clause 5.2.1 states a fundamental requirement as to drainage as follows:
Drainage shall be designed and constructed to avoid water ponding against or near the footing. The ground in the immediate vicinity of the perimeter footing, including the ground uphill from the slab on cut-and-fill sites, shall be graded to fall 50mm minimum away from the footing over a distance of 1m.
The requirement, therefore, is that the area surrounding the footing slab is to be graded away from the slab so as to take water away from it and avoid ponding next to it. Mr McFarlane, an engineer expert in geo-technical and structural issues with a special interest in residential slab and footing systems on reactive clay, said:
It was clear to me that there were some drainage issues early on otherwise we would not have had that heave. (T 945 lines 15-17)
Mr McFarlane gave evidence on behalf of Metricon, and it appeared that he had given evidence for Metricon in a number of other proceedings and written a large number of reports for Metricon. The answer just given was admittedly given in response to being pressed by the presiding Tribunal member in circumstances where Mr McFarlane noted that he had not carried out an investigation of the construction phase for this or had the opportunity to have a consultation with some appropriate supervisor. Mr Gobbo and Mr Carr submitted in those circumstances we should not attach much weight to the answer which he gave. Even allowing for the matters urged by Mr Gobbo and Mr Carr, however, we regard Mr McFarlane's evidence and opinion on this point as significant.
Provide adequate surface and sub-service drainage prior to commencement of construction and connect to legal point of discharge. The drainage should be at least 1000 mm away from the footing and extend at least 100mm into the natural clay. [emphasis added]
Discharge from the downpipes must be directed away from the building during construction to ensure water does not discharge or pond adjacent to the footings.
(d) Excavations near the edge of the footing system shall be backfilled in such a way as to prevent access of water to the foundation. For example, excavation should be backfilled above or adjacent to the footing with moist clay compacted by hand rodding or - tamping. Porous material such as sand, gravel or building rubble should not be used.
According to Mr Yttrup, this meant that in the present case it was incumbent upon Metricon to 'backfill' the area surrounding the slab with compacted moist clay. It was common ground that no such process was undertaken.
Plumbing trenches should be sloped away from the house and should be backfilled with clay in the top 300mm within 1.5m of the house. The clay used for backfilling shall be compacted.
On this basis, provision is made elsewhere for the treatment of plumbing trenches and Clause 6.6(d) would not be necessary to require the backfilling of plumbing excavations adjacent to slabs with moist clay. Nevertheless, excavations may be carried out adjacent to a slab for reasons other than plumbing trenches and Clause 6.6(d) has work to do in these circumstances if it has the meaning advocated by Metricon.
A blinding layer of sand is not required but where used shall comply with Clause 6.4.2 if deeper than 100mm.
That is, the Standard specifically contemplates the use of porous material. Mr Price observed that scoria, because of its larger grains, is more porous than sand; the premise that some non-porous material was called for under the slab was simply not borne out. We do not accept this criticism of the workmanship.
(a) Identification of the soil profile and either -
(i) established data on the performance of houses on the soil profile;
(ii) interpretation of the current performance of existing buildings on the soil profile.
(b) Estimation of the characteristic surface movement (Ys).
Identification of the soil profile and a classification from established data on the performance of houses on the soil profile are as follows:
(a) The typical soil profile data given in Appendix D shall be used. Where no data are provided in Appendix D, local knowledge where applicable shall be applied.
NOTE: The soil type and soil conditions should be inspected at footing excavation stage by the classifier to confirm the soil profile.
(b) Identification of the soil profile and interpretation of the current performance of existing buildings.
Identification of the soil profile and interpretation of the performance of existing residential footing systems within the region which are not less than 10 years old and are founded on a similar soil profile shall be assessed in accordance with Table 2.2.
NOTE: The soil type and site condition should be inspected at footing excavation stage by the classifier to confirm the soil profile.
The general principles of calculating Ys are given in AS2870 Supp 1 (Commentary, C2.2.3).
This part of the supplement or commentary includes the statement:
Having determined the surface characteristic movement, the reported value of the site classification should be to the nearest 5mm.
These words mean, not that there should be a rounding up, but rather that there should be a rounding to the nearest 5mm which include the possibility of rounding down. Therefore, as Mr Fox correctly observed, a Ys of 72 is apt to lead to a soil classification of H rather than E (T 686 lines 7-10). The highest recording Ys value made by Dr Haberfield, whether subject to legitimate criticism as the respondent would have it or not, does not call for a classification of the soil as 'E'.
Subject to a qualification to which we shall refer presently the rule is, we think, correctly stated in Hudson on Building Contracts, 7th ed. (1946), p. 343. "The measure of the damages recoverable by the building owner for the breach of a building contract is, it is submitted, the difference between the contract price of the work or building contracted for and the cost of making the work or building conform to the contract, with the addition, in most cases, of the amount of profits or earnings lost by the breach".
[1954] HCA 36; (1954) 90 CLR 613, 617-8
As to what remedial work is both "necessary" and "reasonable" in any particular case is a question of fact. But the question whether demolition and re-erection is a reasonable method of remedying defects does not arise when defective foundations seriously threaten the stability of a house and when the threat can be removed only by such a course.
And the Landlord also correctly submitted that the requirement of reasonableness did not mean that any excess over the amount recoverable on a diminution and value was unreasonable. The Tenant's submissions rested on a loose principle of "reasonableness" which would radically undercut the bargain which the innocent party had contracted for and make it very difficult to determine in any particular case on what basis damages would be assessed. That principle should not be accepted.
[53] It should be noted here that the researches of counsel for both sides have been unable to identify any case in which it has been held to be unreasonable for a plaintiff to recover the costs of demolition and reconstruction where the defendant's defective work has affected the stability of a house structure. This suggests that the courts will be slow to characterise as unreasonable the position of a plaintiff who is unwilling to "live with" the risk of the serious consequences which may result from substandard work which affects the stability of a structure. There is no support in principle or authority for the proposition that a court will determine a level of risk of instability which it is "reasonable" for a plaintiff to be required to endure when the plaintiff has bargained for a level of stability which is, for all practical purposes, risk free.
[59] As the High Court emphasised in the passage from Bellgrove v Eldridge cited above, because the respondents' damages are assessed "once and for all", the law must be astute to ensure that the measure of damages accurately reflects the restoration of the respondents to the position they would have been in had the appellants not failed in their duty. The respondents should recover the amount of damages necessary to enable them to own a house free of risk so far as its stability was concerned. As McLure JA, with whom Steytler P and Wheeler JA agreed, said in J-Corp Pty Ltd v Gilmour: "Reasonableness does not require the respondent to carry those risks."
To give to the respondent the cost of a doubtful remedy would be no means adequately compensate her, for the employment of such a remedy could not in any sense be regarded as ensuring to her the equivalent of a substantial performance by the appellant of his contractual obligations.
These principles apply equally here as between the Softleys and Metricon.
Softley
Metricon Homes Pty Ltd
(2009) 236 CLR 272
(1959) 101 CLR 298
(1954) 90 CLR 613