The applicant contends that as the Maynes have an interest in the outcome of this proceeding, which obviously they do, they ought be joined as a party[6].
The applicant contends that Eco Housing Building Systems ("Eco Housing") is also a relevant party as the supplier of the kit home, which he constructed. The direction to rectify, it is contended, calls into question the structural integrity of the building by virtue of design, plans and specifications of the kit home supplied by Eco Housing. Essentially what the applicant is saying is that if the building work is defective it is the fault of Eco Housing and not him.
However, even if this is right, the applicant in this proceeding can claim no relief against Eco Housing, nor can the Tribunal order that Eco Housing rectify or that the Authority issue a direction to rectify to it.
This application is to consider, by way of a fresh hearing, whether the direction to rectify should be set aside or upheld or some other order made as between the applicant and the Authority[7]. To include Eco Housing in this proceeding would force it into litigation for which it would receive no benefit. In this respect I agree with the submissions of the Authority[8].
When regard is had to the criteria for joinder that is set out in section 42 of the QCAT Act, it is difficult to see how Eco Housing could benefit from any order made by the Tribunal, nor would any of its interests be affected by the proceeding. Even if it was accepted by the Tribunal that there were design faults attributed to the Eco Housing design, no order adverse to the interests of Eco Housing could be made in this proceeding.
In Comfortable Homes Pty Ltd v QBSA[9] the applicant sought to join the engineers who prepared a foundation design report for a residential dwelling. In the review application by the builder, it sought to join the engineers alleging design faults. The Tribunal, in dismissing the application, expressed similar considerations to those above about the utility of any order that might concern the engineers. After consideration of the power to join the Tribunal Member said:
"It follows that, given the limited orders which the Tribunal may make in the review proceedings, it is difficult to conceive of any such order, which might be made in the present case, which might benefit WBA or by which WBA could be bound. Suppose, for example, that the Tribunal should confirm the Authority's decision. How, it may be asked rhetorically, might that, of itself, be of benefit to WBA? And how, even if the reasoning process leading to the decision involved an analysis of the design and a conclusion that it was defective and a cause of the damage to the house, could the order bind WBA, if it were a party to the proceeding? Such examples might be multiplied to reflect the various permutations and combinations of outcome of the principal application, and the factual analyses and reasoning processes which might lead to them"[10].
[8] Authority's written submissions para 17 ff.
[11] Also a consideration in Comfortable Homes Pty Ltd v QBSA