"The parties agree that the respondent has accepted liability for the applicant's claims dated 25 June 2010 and delivered to the respondent on 28 June 2010 and the matter is to proceed as an assessment of the quantum of the applicant's claims only".
Did the policy apply to the work that was done?
"Contract" means the domestic building contract entered into between the Builder and the Owner for the carrying out of the Works, and is referred to in them Schedule herein".
"The Insurer may, on the giving of 30 days notice in writing cancel the cover provided under this policy to the building Owner if the building Owner:
(a) makes a false, fraudulent or misleading claim under this policy;
(b) breaches its duty of utmost good faith to the Insurer;
(c) agrees to the cancellation following termination of the contract that required the issue of this policy."
The cancellation shall take effect thirty [30] days after the Insurer gives written notice".
I accept Mr Atchison's evidence as to the defect. I think a greater scope of works is required than that costed by Mr Campbell but I also accept Mr Campbell's evidence that the whole area does not need to be re-rendered. Mr Buchanan's figure needs to be reduced, according to his evidence, by $4,400 to take account that the whole area does not need to be re-rendered. That leaves a rectification figure of $10,175.59 which will be allowed.
The deck is defective and needs to be rebuilt. I accept Mr Campbell's evidence that the plans do not specifically require this to be constructed of concrete and so I will allow his figure of $1,677.06.
The frame has been installed out of level and needs to be re-installed. Mr Atchison said that the head heights of the doors do not match the windows by 10-15mm but I accept Mr Campbell's evidence that it is appropriate for the Builder to use standard doors and that this is a consequence of putting two different types of joinery on the same elevation. I will allow Mr Campbell's figure of $629.97.
Both the floor and the lintel need to be raised. The difference between the experts in amount here seems to relate to different methods of calculation. I think one expert is as likely to be as right as the other so I will average these two figures at $8,220.20.
There is a substantial difference in the figures here and a greater allowance for excavation on the part of Mr Buchanan. I think I should allow more towards his figure than Mr Campbell's. I will assess this item at $20,000.
This is another example of different figures arising from different methods of assessment. I think I should average the two figures at $16,494.33
The roof has also been constructed defectively with a guttering set back from the wall line. Liability was disputed. On this matter, although I accept that this method of construction might be acceptable on a title boundary, I prefer the evidence of Mr Atchison that it is not in accordance with the drawings and is not acceptable in this instance. I will therefore allow Mr Buchanan's figure of $4,447.74.
I prefer the evidence of Mr Atchison and Mr Buchanan in regard to this item over that of Mr Campbell because their assessment and figure are more in line with what the contract documents required. I will allow their figure of $3,440.80.
Mr Campbell's figure does not include rendering which he has included elsewhere. There is nonetheless a considerable difference between the figures. I think again I will take a middle course of $2,187.18.
Both experts agreed that the heights should be uniform. I prefer Mr Campbell's methodology of dealing with the single door rather than the sliding door. On this basis Mr Buchanan's figure was revised down to $1,158.59 and since the difference between that and Mr Campbell's figure using the same methodology was less than $1,000 and one is as likely to be right as the other I will average the two figures to $900.60.
There was a difference here between the experts in regard to the area involved and not a great deal of difference in the calculations. I will adopt a midpoint of $8,661.45.
The doorway's dimension is not dimensioned on the plan and a door of that width, although narrow, is not in breach of the Code. Mr Atchison said that such a narrow door is normally only used on a toilet or a cupboard but here it is used on a bedroom. Mr Campbell said that it was a design problem. I am not persuaded that this is a defect.
The dealings between the Owner and the Builder have clearly not been well documented. It is difficult to believe that the Owner was not aware of what has been done and accepted it. I am not persuaded that this is a defect.
Mr Buchanan's calculation shows a greater amounts of materials. No renderer is allowed for in Mr Campbell's figure. I will allow Mr Buchanan's figure of $12,586.00.
There is a difference in cost of garage doors here. I will average the two figures at $6,560.37.
In regard to this I preferred Mr Campbell's figure of $850.08.
The stairs that have been installed are medium density fibreboard ("MDF") whereas the contract calls for Tasmanian oak. Mr Atchison and Mr Buchanan have allowed to replace the MDF stairs with hardwood stairs at a cost of $11,701.25. Mr Campbell has allowed for the completion of the staircase as is at $3,353.96. I do not believe that MDF stairs would have been installed as a temporary measure as was suggested. Indeed, in one of the units the Owner has tiled around them. I do not believe that these would have been installed without the Owner's agreement so I will allow Mr Campbell's figure of $3,353.96.
The difference here seems to be one of calculation. I will average the two figures at $5,354.44.
No installation was allowed for in Mr Campbell's figure. I will allow Mr Buchanan's figure of $8,386.95.
I will average the figures between the experts on this item at $10,476.16 since, as with so many of these items, one expert is as likely to be correct as the other.
The stormwater system involved a complex retention system involving a number of pits connected with 600mm diameter pipes. Mr Campbell's figure did not allow for an extra pipe or the stormwater system as designed. I will allow Mr Buchanan's figure of $18,671.40.
Mr Campbell's figure did not allow for the crossover. I will allow $10,000 for this item.
I accept Mr Campbell's evidence that this was not required by the contract documents.
Mr Buchanan's figure allowed for re-rendering in excess of the affected areas. In accordance with his evidence about this I will reduce his figure by $4,400 and allow $12,115.84.
For the same reason as for Unit 1, I will allow Mr Campbell's figure of $1,917.74.
I accept this is a defect. The garage doors installed were not those specified. Mr Campbell has allowed only to make the door operational. I will allow Mr Buchanan and Mr Atchison's figure of $4,566.65 to replace the door.
The fall in the shower cubicles is inadequate. There is also no spa installed. Mr Campbell allowed nothing on this item saying that the Code recognised that sometimes the required fall might not be achievable. I will allow Mr Buchanan's figure of $12,233.81 on this item.
Mr Atchison said that the membrane applied was far too thin and will need to be replaced. In the meantime, the walls have been largely tiled with very expensive tiles. I do not find that by proceeding with the tiling of the walls the Owner has accepted the membrane. He was entitled to assume that the Builder had installed it correctly. The rectification cost is assessed at $22,691.57. As against that Mr Campbell has made no allowance, saying that there is no evidence as to what the material is and no evidence that it is a defect. The photographs seem to support Mr Atchison's views so I will allow Mr Buchanan's figure of $22,691.57.
Mr Campbell's figure on this item was more than Mr Buchanan's. However one is as likely to be right as the other and consistently with the approach I have adopted I will average the two figures which gives a figure of $1,698.89.
The architrave height varies at the meals area door and the window junction. Mr Campbell finds that this is not a defect and Mr Atchison says that the architraves should match and I accept that evidence. However it appears that the cost can be reduced to $3,300 by replacing the single door and so I will allow that sum.
As with the other staircase, the stairs were required to be Tasmanian oak and were made of medium density fibreboard instead. For reasons already given I do not believe that this was not with the knowledge and consent of the Owner and so I accept Mr Campbell's completion figure of $1,237.30.
Unit 1 - Defects (inc. GST & preliminaries) - $ 87,750.86
Incomplete work (inc. GST & preliminaries) - $190,655.10
Unit 2 - Defects (inc. GST & preliminaries) - $ 85,631.12
Incomplete work (inc. GST & preliminaries) - $ 88,809.06
Skordakis