© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
[2009] VCAT 2763
Victorian Civil and Administrative Tribunal
2009-12-31
Original judgment source is linked above.
Casey Planning Scheme; Section 77 Planning and Environment Act 1987; Residential 1 Zone; Development Plan Overlay; 24 lot subdivision; Land fill, Concrete batching plant, Landscape and garden supplies; Land use conflict; Separation distances; Odour; Dust; Noise; Gas; Future road widening.
Seventh Day Adventist Church v Casey CC [2009] VCAT 2763
in accordance with the endorsed plans and subject to the permit conditions set out in the Appendix.
Mr Nick Tweedie, Barrister by direct brief. Expert written and oral evidence provided by:
Mr Jim Higgs, Traffic Engineer of TTM Consulting (Vic) Pty Ltd provided written comments and attended to answer questions about his comments on proposed permit conditions.
Mr Graeme Peake, Barrister instructed by Maddocks Lawyers. Expert written and oral evidence provided by:
No appearance but by letter responded to comments made by Mr Higgs.
Subdivision of the land into 24 lots and alteration/creation of access to a road in a Road Zone Category 1.
Section 77 Planning and Environment Act 1987.
Cl. 52.29 (Create or alter access to a road in a Road Zone Category 1).
Clauses 11, 12, 14, 15.04, 15.05, 18.10, 19.01, 21.03, 21.05, 21.09, 22.05, 22.13, 22.14. 22.15.22.17, 56 and 65.
We inspected the site and locality in September 2009 prior to the last day of hearing.
The site is located on the eastern side of Hallam Road and comprises two lots with a combined area of 2.99 hectares. It is remnant grazing land and contains 2 dwellings located close to the Hallam Road frontage. The review site and an adjoining parcel of land to the north are the only remaining areas of open 'farmland'. Over the past 20 or so years, Hampton Park has been the focus of considerable urban growth and is now almost fully developed with residential estates. Land on the west side of Hallam Road opposite the review site and to the north and north east of the adjoining farmland form part of these residential areas.
The review site and the land to the north are on the edge of a very large area of Special Use Zone 1 occupied primarily by an extensive SITA Landfill. The landfill is separated from the review site by a concrete batching plant located on land along the eastern boundary and a landscape and garden supplies business on land along the southern boundary.
Hallam Road outside the review site is a rural style road which has been widened in places with turning lanes and painted medians. The long term intention is for the road to be reconstructed as a six lane divided road.
The review site is in outer suburbia and in that context has reasonable access to shopping and other urban facilities with a larger shopping centre around 2 kilometres to the north along Hallam Road.
1992 is not a year on which I shall look back with undiluted pleasure. In the words of one of my more sympathetic correspondents, it has turned out to be an Annus Horribilis.
Will the site be adversely affected by the SITA landfill?
Will the site be adversely affected by the concrete batching plant?
The Concrete Batching Plant, if maintained and operated correctly, is unlikely to generate justifiable dust complaints beyond 100 m from the active parts of the plant.
Taken in isolation from other sources of dust and odours in the vicinity, I believe the 100m separation between the mini-mix plant and the proposed lots provides adequate buffer.
Will the site be adversely affected by the landscape and garden supplies centre?
Due to the limited scale of the operations at the Garden Centre and the improved setbacks shown on the Amended Application, potential noise emissions from this source are not seen as being significant. Should any noise source become apparent in the future, noise control by close-up screening or enclosure would be relatively easy.
Access to Hallam Road and the internal 'north-south' road
A service road should be provided for all abutting development except at locations where it is not physically achievable or desirable (e.g. in proximity to major intersections or railway lines). Where a service road is not provided, a 12 m tree reserve is required in its place. The location of tree reserves will be resolved upon determination of access point(s) to each subdivision.
On balance we support a residential subdivision of this land
all to the satisfaction of the Responsible Authority. The lots must be landscaped in accordance with the approved landscape plan.
in accordance with the approved construction plan/s and to the satisfaction of the Responsible Authority:
The owner must pay the Responsible Authority's costs of the preparation, negotiation, execution and registration of the Section 173 agreement required by this condition.
A buffer of at least 200 metres is created between any proposed sensitive use and the boundary of the WA170 area containing an existing extractive industry; OR
The proponent must demonstrate that the potential dust impacts upon the subject site that may be emitted from WA170 can meet current EPA recommended buffer distances for residual Air Emissions contained in the publication AQ2/86.
The Responsible Authority may extend the time if a request is made in writing before the permit expires or within three months afterwards.
[1] Environment Report Assessment of the Potential for Methane Gas Movement from Victorian Landfills, February 2009.
[2] Brookland Greens Estate - Investigation into methane gas leaks, October 2009
Seventh Day Adventist Church
Casey CC [2009] VCAT 2763