[2025] VCAT 825
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-09-19
Original judgment source is linked above.
Council failure to determine application, Council now supports proposal subject to conditions, upper level setback from street frontage
Schwartz Family Co Pty Ltd v Melbourne CC [2025] VCAT 825
To construct a building or construct or carry out works
Construct a building or construct or carry out works
To vary, reduce or waive any requirement of Clause 52.34-5 and Clause 52.34-6
Partial demolition of existing rooftop features and construction of a single level addition comprising seven additional hotel suites (as part of an existing Hotel), a pedestrian bridge and rooftop terrace, and the waiver of two bicycle parking spaces.
Application under section 79 of the Planning and Environment Act 1987 (Vic) - to review the failure to grant a permit within the prescribed time.[2]
Capital City Zone - Schedule 1 - Outside the Retail Core ('CCZ1')
Design and Development overlay - Schedule 1 - Urban Design in Central Melbourne ('DDO1')
Design and Development Overlay - Schedule 2 Area 9 - Special Character Areas - Built Form (Hoddle Grid) ('DDO2')
Parking Overlay - Schedule 1 - Capital City Zone - Outside the Retail Core ('PO1')
Clause 37.04-4 - To demolish or remove a building or works and to construct a building or construct or carry out works
Clause 43.02-2 - Construct a building or construct or carry out works
Clause 52.34 - To vary, reduce or waive any requirement of Clause 52.34-5 and Clause 52.34-6
The site currently comprises a number of titles and is currently developed with the Victoria Hotel, being located on the south side of Little Collins Street between Russell and Swanston Streets, Melbourne.
To the north, over Little Collins Street, is Council House 1 (eight-storeys) and Council House 2 (ten-storeys).
To the east, is the Georges Building comprising retail and office uses (five-storeys).
To the south of the east wing of the hotel complex, is the Collins Street Baptist Church and a rear office building (ten-storeys).
To the south of the central block of the hotel complex is Clyde House Serviced Apartments (eight to nine-storeys) and the Melbourne Athenaeum Theatre and Library (three to four-storeys).
To the west is the Melbourne Town Hall and Administrative Building.
Figure 1: Location Plan Source: Council delegate report
Figure 2: Aerial image Source: Council delegate report
larger buildings do not visually dominate the street or public space;
the dominant street wall scale is maintained; and
sun penetration and mitigation of wind impacts at street level (sic).
201-207, 209-231 Little Collins Street and part of the airspace above Baptist Place, MELBOURNE VIC 3000
To construct a building or construct or carry out works
Construct a building or construct or carry out works
To vary, reduce or waive any requirement of Clause 52.34-5 and Clause 52.34-6
(a) Confirmation that the pedestrian bridge aligns with or has a greater setback than the existing pedestrian bridge over Baptist Place.
(b) Confirmation that the horizontal grade change for the new pedestrian bridge level is accommodated internally within the structure.
(c) The glass balustrades be reduced in height to the minimum extent necessary to meet building regulations.
(d) Deletion of the window on the east boundary.
The amended plans must be to the satisfaction of the Responsible Authority and when approved shall be the endorsed plans of this permit.
Demolition and Construction Management Plan (to the satisfaction of Site Services)
(a) Public safety, amenity and site security.
(b) Operating hours, noise and vibration controls.
(c) Air and dust management.
(d) Stormwater and sediment control.
(e) Waste and materials reuse.
(f) Traffic management.
Landscape plan including on-building planting
(a) A planting schedule of proposed vegetation details such as:
- Genus, species, common names, cultivar names
- Quantities of all plants
- Pot size at time of planting
- Mature height and width of all plants
- Diversity of plant species and forms
(b) Green roof/ green wall details such as:
- Annotated construction details including sectional diagrams
- Support structures
- Materials
- Growing media, volume, depths and specifications
- Waterproofing
- Drainage
- Irrigation systems demonstrating use of non-potable water sources (rainwater, stormwater and recycled water)
(a) A statement to describe how the canopy, vegetation and urban ecology planning provisions that are required by the development will be successfully maintained in the future.
(b) Maintenance tasks for establishment period.
(c) Ongoing maintenance schedule for after the initial 52-week period detailing weed and pest management, succession planting, re-mulching, plant nutrition.
(d) Re-planting timeframes for poor-performance vegetation that interfaces with the public realm.
(e) Access requirements/agreements.
(f) Maintenance schedule for green infrastructure structures.
Projections over Council roads (Baptist Place)
(a) Liability and maintenance of those parts of the development projecting into airspace or sub-soil of land under the care and management of Council ('Projections').
(b) Payment of a lump sum license premium (payable at the outset rather than an annual fee) in respect to the Projections.
(c) A disclaimer of any right or intention to make or cause to be made at any time any claim or application relating to adverse possession of the land occupied by the Projections.
The owner of the land must pay all of the Melbourne City Council's reasonable legal costs and expenses of this agreement, including preparation, execution and registration on title.
(a) The development is not started within three (3) years of the date of this permit.
(b) The development is not completed within five (5) years of the date of this permit.
The Responsible Authority may extend the permit if a request is made in writing before the permit expires, or within six (6) months afterwards. The Responsible Authority may extend the time for completion of the development if a request is made in writing within 12 months after the permit expires and the development started lawfully before the permit expired.
[2] Section 4(2)(d) of the Victorian Civil and Administrative Tribunal Act 1998 (Vic) states a failure
to make a decision is deemed to be a decision to refuse to make the decision.
[3] The submissions of the parties, any supporting exhibits provided to the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
Schwartz Family Co Pty Ltd
Melbourne CC [2025] VCAT 825