[2025] QDC 105
General information, not legal advice.
District Court of Queensland
2025-08-19
Original judgment source is linked above.
LANDLORD AND TENANT - COVENANTS - AS TO BUILDING AND ALTERATIONS AND IMPROVEMENTS - the lease provided that the lessors would undertake "Landlord's Works" but was silent as to who would pay - the plaintiffs contend that the parties agreed to share the costs equally - the defendants contend that the plaintiffs were obliged to pay for the entirety - whether there was an agreement about the cost of the Landlord's Works - whether the parties agreed to share the costs equally
LANDLORD AND TENANT - COVENANTS - AS TO BUILDING AND ALTERATIONS AND IMPROVEMENTS - WHERE LESSOR'S CONSENT REQUIRED - the plaintiffs contend that the defendants breached the lease by carrying out unauthorised works - whether the defendants sought the landlord's consent - whether the defendants are in breach of the lease -
whether the defendants are liable to the plaintiffs for the cost of the rectification works
LANDLORD AND TENANT - COVENANTS - GENERALLY - the plaintiffs allege the defendants failed to maintain the premises in good repair and condition and clean and tidy - whether an alleged breach occurred - whether the plaintiffs have suffered any loss - whether the plaintiffs are entitled to recover monies from the defendants
LANDLORD AND TENANT - COVENANTS - ACTION FOR BREACH OF COVENANT - DAMAGES FOR BREACH - the plaintiffs contend damages should be calculated at the date of the respective breaches - the defendants contend that many of the breaches have been rectified by the new tenant and the plaintiffs have suffered no loss - whether the new tenant is obliged to remedy the unauthorised works and to make good the premises at the end of the lease - whether the plaintiffs suffered any loss - whether the proper measure of damages is the loss sustained by the failure of the defendants to perform their obligations
LANDLORD AND TENANT - ASSIGNMENT, SEVERANCE AND SUBLEASE - EFFECT OF ASSIGNMENT - the defendant tenant sold its business and assigned the lease to a new tenant - the new tenant accepted the obligations under the lease to keep the premises in repair and to make good any damage to the premises at the end of the lease - whether the adoption of those obligations by the new tenant reduce the plaintiff's loss or the defendants' liabilities
LANDLORD AND TENANT - COVENANTS - ACTIONS FOR BREACH OF COVENANT - DAMAGES FOR BREACH - the defendants contend any liability they have to pay for damages to the plaintiffs cannot exceed the value of the reversion in the premises pursuant to s 112 of the Property Law Act 1974 - the plaintiffs contend that s 112 only applies to those parts of their claim that comprise damages for breach of the obligation to keep or put the premises in repair during the lease - whether any damages payable to the plaintiffs are limited by s 112 of the Property Law Act 1974 - how any diminution in the value of the reversion should be measured
Property Law Act 1974 (Qld), s 112
Haines v Bendall [1991] HCA 15; (1991) 172 CLR 60, applied
IVI Pty Ltd v Baycrown Pty Ltd [2005] QCA 205, applied
LCA Marrickville Pty Ltd v Swiss Re International SE [2022] FCAFC 17; (2022) 290 FCR 435, cited
Swiss Re International SE v LCA Marrickville Pty Ltd [2021] FCA 1206; (2021) 394 ALR 461, considered
Tabcorp Holdings Ltd v Bowen Investments Pty Ltd (2009) 236 CLR 272, considered
Wenham v Ella [1972] HCA 43; (1972) 127 CLR 454, applied
(a) $79,362.00 as a debt due for the defendants' contribution to the cost of Landlord's Works;
(b) $44,504.20 for damages for unauthorised alterations to the premises;
(c) $139,290.90 for damages for breach of a covenant to keep the premises clean and in good repair; and
(d) $13,200.00 for legal costs of the preparation of notices to remedy breaches of covenant.
(a) EPM (by Mr Chadwick) and Mr Schlecht did agree that they would share the cost of the Landlord's Works equally and EPM is liable for half that cost, in the amount of $68,647.76;
(b) EPM and Mr Chadwick are liable for certain breaches of EPM's covenants not to damage or alter the premises, in the total sum of $15,348.16;
(c) EPM and Mr Chadwick are also liable for certain breaches of EPM's covenants to keep the premises clean and in good repair; although the total damages to rectify those breaches would amount to $23,476.29, their liability for those breaches is limited under s 112 to $20,000 because the diminution in the value of the reversion as a result of those breaches is $20,000;
(d) Mrs Chadwick is not liable to Mr and Mrs Schlecht for any amount;
(e) therefore, Mr and Mrs Schlecht are entitled to judgment against EPM for $103,995.92 and against Mr Chadwick for $35,348.16, together with interest.
SCHEDULE
Item 6 Permitted Use
Printing
1.2 Definitions
(14) "Landlords Works" means the building works to be completed by the Landlord for use by the Tenant during the Term and any Further Term of this Lease particularised in Special Condition 21 of this Lease.
(22) "Tenant's Property" means all fixtures, fittings, equipment, stock and other articles in the Premises owned by the Tenant.
2.1 Payments
The Tenant must pay the Landlord: ...
(e) all reasonable costs and expenses incurred by the Landlord in relation to any notice given to the Tenant in accordance with this Lease, lawful determination or attempted determination of this Lease, the surrender of this Lease, the granting of any consents, proceedings lawfully brought by the Landlord to enforces the Tenant's performance and obligations under this Lease
(f) any reasonable additional or unusual charges and expenses incurred by the Landlord at the request of the Tenant
(g) any other payments arising from the Tenant's use of the Premises.
(e) damage the Landlord's property
(f) alter the Premises, install any partitions or equipment or do any building work
(h) display, paint or erect any signs, save standard business signage
(m) make holes, deface or damage floors, walls or ceilings or other parts of the Premises
(o) use or install any product or property in the Premises likely to cause damage
4.3 Consent
The Tenant must seek the Landlord's written consent to any of the matters in Clause 4.2 which may be granted at the Landlord's discretion which the Landlord must not unreasonably withhold.
5 MAINTENANCE AND REPAIR
5.1 Repair
The Tenant must:
(a) keep the Premises, including all signage, in good repair and condition, except for fair wear and tear, and structural defects and, or alternatively, repairs
(b) fix any damage caused by the Tenant or its employees use
(c) repair, maintain or replace ... the doors locks ... in the Premises
(d) during the last year of the Term, and more often if reasonably required by the Landlord having regard to the condition of the Premises, paint the walls, ceilings and other painted surfaces of the interior of the Premises with two (2) coats of first quality paint in a proper and workmanlike manner, in the original colours or in such other colours approved by the Landlord.
(a) keep the Premises clean and tidy, consistent with the nature of the business conducted on the Premises
(b) keep the Tenant's Property clean and tidy including the maintenance of lawns, gardens, garden beds, driveways, walkways
6 ASSIGNMENT AND SUBLETTING
6.1 The Tenant may only assign or sublet the Lease or the Premises with the Landlord's consent which must not be unreasonably withheld.
6.2 The Landlord must give its consent if:
(b) the Tenant and the new tenant sign any agreement and gives any security which the Landlord reasonably requires.
(d) The Tenant is not in breach of the Lease.
(e) The Tenant releases the Landlord from all claims the Tenant has or may have in respect of this Lease.
6.3 If the Tenant is a corporation, any change in the principal shareholding or composition of the board of directors altering the effective control or control of one half or greater of the shares or the board is an assignment of this Lease and must be dealt with in accordance with this Lease.
14.5 Entire Agreement
This Lease:
(a) save for the agreement entered into between the parties as regards completion of and payment for the Landlord's Works, contains the entire agreement and understanding between the parties on everything connected with the subject matter of this Lease,
(b) to the extent that this Lease and the agreement entered into between the parties as regards Landlord's Works are inconsistent, the agreement as regards the completion of and payment for the Landlord's Works shall prevail, and
(c) supersedes any prior agreement or understanding relating to any matter dealt with by the provisions of this Lease.
20 LANDLORDS WORKS
20.1 The Landlord shall complete the following building alteration and additions to the Premises:
(1) Construct a lightweight wall on top of existing 200 series block balustrade mezzanine level. Wall to extend to the underside of roof without ceiling. Wall to have three (3) openings of 2.4m x 2.2m as a loading dock, 0.9m x 2.1m as a standard door opening to top of stair access and a 2.1m x 0.9m opening as a viewing window to the warehouse floor.
(2) Construct further room in south-west corner mezzanine level room at item (1) dimensions 5 m x 3 m with ceiling at 2.4 mts and one (1) door access and viewing window noted above.
(3) Rooms (1) and (2) to be air-conditioned.
(4) The available mains power to Premises to be upgraded to a minimum of 300 AMPS.
(5) The northern access door situated in the wall between the office and the warehouse is to be altered to include a small viewing window.
20.2 The Tenant shall give the Landlord, its contractors, servants and agents exclusive possession of that part of the Premises in which the Landlord's Works are being carried out provided always that the Landlord shall use its best endeavours to avoid unnecessary disruption to the Tenant's use and occupation of the Premises.
20.3 The Landlord shall complete Landlord's Works within a reasonable time of the commencement of the Term.
(a) as to the alleged unauthorised alterations and failures to maintain the premises - Mr David Galbraith (called by the plaintiffs) and Mr Andrew Montgomery Hribar (called by the defendants), each of whom is a builder or building consultant;
(b) as to the cost of repairing each of the alleged unauthorised alterations and failures to maintain the premises - Mr Moises Lopez, a quantity surveyor instructed by all parties and called by the plaintiffs; and
(c) as to any reduction in the value of the reversion - Mr Mathew Duncan (called by the plaintiffs) and Mr Daniel Lewis (called by the defendants), each of whom is a property valuer.
Landlord to[12]
Aircon room lightweight ceiling
Self shutting door? 2.4 x 2.4/ Construct door on the nth face off set to right.
...
Definitely lift/ tenant pays
[On the right is a drawing of two offices: one 10½m long (width not stated) and one 4m x 4m with a viewing glass apparently over the factory floor]
(9m x 10.4 air con/no ceiling
( tenant pays
( split system
Tenants pay for as we agreed landlord pays for room at initial meeting
(Tenant was[13] split system aircon
(to use in mezzanine rooms
Please see the amendments below following our discussions.
I'm happy for this to be progressed to the stage of drawing up the lease whilst we finalise the pricing of the two items below.
Lessors works
1/ Construction of a 11mts by 8mts room located in the south western corner of the warehouse, fully enclosed and air-conditioned with 1 only 2.4mt by 2.4mt double door. This structures to encompass the existing amenities. The ceiling height is to be determined by the lessor and the existing wash tub is to remain in place.
2/ Construction of a 4mts by 4mts office located on the mezzanine level south western corner, including air-conditioning and an observation window to view the warehouse floor, to suit the production manager.
3/ Construction of a 2nd room 9mts by 10.4mts located on the mezzanine level south eastern side encompassing the hot water system and terminating aprox. 10.4mts along the eastern wall. This structure has only 1 door opening of 2.4mts by 2.1mts. The ceiling height in this area is to be determined by the lessor as well. Cost of this structure to be shared 50/50. All construction dimensions have been discussed and agreed upon by both the lessor and lessee - agreed subject to final quote.
4/ Research, acquire and installation of a materials hoist suitable for the lessee's requirements at the lessee's cost - to be discussed further subject to final quote.[17]
5/ Organise to have the available power upgraded to 300 amps minimum. Installation cost by the lessee - changed to installation cost by lessor.
Additional items ...
3/ Signage and installation of, is to be at the lessees cost and approved by lessor - agreed.
He explained that, because we previously had been looking at quite a large structure on the factory floor that would require engineering, additional steel, etcetera, etcetera, un, that this - this was quite simple in comparison, and he - he had no - no qualms with - with paying for the works in their entirety.
I am instructed that the parties have entered into an agreement to lease on the following terms and conditions incorporating the attached interim Agreement to Lease as varied by by oral agreement as follows:- ...
13. Landlord's Works - I am instructed that the parties are presently negotiating plans and specifications and agreement for completion of towards obtaining particulars of the Landlord's Works and a plan. I am instructed that the works are payable in part by the Tenant and in part by the Landlord. I am instructed to revert to you with a copy of that exchange of emails as soon as practicable.
14. Costs of Landlord's Works - I am instructed that it may not be possible to obtain detailed costings for all works prior to execution of the Lease. Please obtain your client's instructions to proceed on the basis that the cost of Landlord's Works (to be completed by John Schlecht of our client, a registered builder) will be 'a reasonable sum'. I am further instructed that the Landlord proposes to commence completion of the Landlord's Works upon execution of the lease.
15. Make good obligations - in addition to usual commercial provisions, the tenant to remove the Landlord's Works on the tenant vacating the premises save where the landlord directs otherwise, or the parties agree otherwise.
I confirm that the lease cannot be signed until the Landlords Works have been agreed. As discussed, I have prepared the lease on the basis that the agreement respect of Landlords Works would be an exchange of emails between you and Matthew Chadwick. We can't proceed where something is 'to be agreed' as that is an agreement to agree and is too uncertain. I confirm that your current estimate is that the tenant specifications for the Landlords Works will involve expenditure in the order of $80,000.00.
...
When you believe you have a final agreement on Landlords Works, reply to Matthew having the last word with an email along the following lines:
'I confirm that this exchange of emails is the agreement which I am instructing my solicitor to refer to in the Lease to be signed by the landlord and tenant. ... Further, because of the significant change in specifications for the Landlords Works required by you and normal industry delays, I cannot provide you with an accurate costing for the Landlords Works which are presently being worked up by me. Any amounts that I have discussed are estimates only and are subject to detailed costings from other trades and, in any case the cost of all Landlords Works are to be in a reasonable sum.
Matthew, I ask that any variations to the Landlord's Works be agreed in writing by a further exchange of emails between us.'
All further works excluding the above, required by the tenant for new fit out, are to be payable by the tenant and approved by the landlord.
20.3 The Landlord shall bear the cost of completion of the Landlord's Works.
I am instructed that might client, Mr John Schlecht, licensed builder is presently working with Matthew Chadwick of your client to determine the scope of work and responsibility for payment of the Landlords Works. ... I am instructed that neither the cost of completion nor the time of completion of the Landlord's Works are known to the parties because of the scope of work has not yet been agreed ...
I am further instructed that the Landlord's Works will be payable by the Tenant or the Landlord or shared in an agreed proportion by the parties.
I am instructed that a detailed scope of the Landlord's Works and the division of the costs of the completion of that work between the parties will be particularised in an exchange of emails which I understand will be obtained either today or tomorrow as between John Schlecht of my client and Matthew Chadwick of your client. That exchange of emails is the agreement referred to in the definition of Landlords Words in clause 1.1(14) and Special Condition Clause 20.
I note also that the whole of the costs of the Landlords Works are to be paid by my client and that Mr John Schlecht of my client has attended on Mr Matthew Chadwick and otherwise attending to working up specifications and costs of landlord works for approximately 5 days.
My point regarding the landlord works is that the specification agreed between the parties was changed several times and, the impost of costs, where not paid by your client will no doubt be borne by my client.
Post-lease discussions about costs of Landlord's Works
Reno monies owing by EPM
John and Louella told EPM that "we are still working on renovation figures as some building issues are still to be finished off and we have to price the lift. We are still waiting on invoices to come in but will let you know when it is all finalized." Both Matt and Wendy asked how much it would be.
John told them it is a little hard to give you an accurate figure yet, but it would definitely be more than $80,000 ($80,000-$100,000) and reminded both that Matt had agreed to pay 50% of all renovation costs.
Matt nodded in affirmation and Wendy jumped in and said that "we are struggling with the expenses of our move and Corona and we would have to go on a payment plan."
If you agree, I ask for the cost of the project to be paid for up front, as still owing also is your cost of entry alterations as you asked for time to pay because of your upfront costs to move and Coronavirus. Or, alternatively, you organize and pay for it, and I will simply supervise.
Reno Monies Owing
Landlord said he had a figure for EPM's 50% cost of reno of $85,000. Matt announced very quickly, raising his voice and saying "I'm not going to pay all of that". Wendy grabbed his arm to calm him down and said to Landlord, "can you give me a full breakdown of the figures, and I will look at them". ...
Lift
Matt asked what was happening with the lift and that he still wanted it installed. John told Matt if he wanted the lift installed then he would want Matt to pay for it now. There was no reply from Matt.
we asked Michael, could we - are we within our right to add builder's margin? Because we were being nice and not charging it. And Michael said, "Of course you are." So the amended figures that were given to her at the next meeting was a twenty - $25,000 builder's margin to pay for John's time and work.
Discussion took place regarding the fifty percent (50%) owing by EPM of $120,000 renovation. Completed by Landlord per email documentation between Landlords, EPM and solicitors.
Wendy advised EPM will look at costing information given but said there was only ever a verbal discussion re costings.
(a) a notice sent on 4 July 2022 (TB286), asserting that the change of director and shareholder from Mr Chadwick to Mrs Chadwick in 2020 was a deemed assignment of the lease to which the landlord had not consented, in breach of clause 6.1, and seeking legal costs of $2,000;[57]
(b) a notice dated 6 July 2022 (TB289), asserting a breach of clauses 4.2(e) and 5.1(b)[58] in respect of alleged damage to a roller door, and seeking legal costs of $1,200;
(c) a notice dated 27 July 2022 (TB303) claiming the tenant's share of the cost of the Landlord's Works (no claim for legal costs was made in the notice); and
(d) a notice dated 28 July 2022 (TB305), claiming compensation for nine of the alleged breaches of the lease that were subsequently claimed in this proceeding (no claim for legal costs was made in the notice).
Cost of builders supervision in relation to design, consultation with tenants and various consultants, administration, and supervision of construction of renovation works carried out at the above property.
No, but that's what most builders do. ... Like, everyone charges a margin.
It's a known thing. Builder's charge margins or preliminaries.[63]
Was there an agreement about the cost of Landlord's Works?
What amount is payable for the cost of the Landlord's Works?
(a) the installation of signage on the southern wall (item 1);
(b) cutting a hole in an external wall for the installation of ventilation equipment for a printer (item 8);
(c) the removal of a sink from an internal wall of the factory floor and associated contamination of the floor, drains and sewer (item 9);
(d) the installation of CCTV cameras inside the premises (item 12);
(e) the installation of a chiller system outside the building and movement of staff outdoor seating for that purpose (item 14); and
(f) filling a recess in the slab floor with concrete (item 28).
Signage
Wendy and Matt asked if they could erect some signage - Landlord replied "that's fine, but I do not want any signage put on walls in case fixings that are used cause water penetration. The only place suitable on the building is maybe on the western wall, on the top awning."
The 175mm smoke exhaust PVC pipe through the south wall of the building does not need the installation of a fire collar.
When the pipe is removed, the opening can be sealed using a concrete mix of the same design used for the tilt-up concrete panels with a non-shrink additive.
He was not cross-examined about this item of the claim.
Agreed: At the end of the tenancy or when the system is removed, the penetration hole will require repair to make good.
Installation of chiller system and alteration to staff outdoor seating - item 14
Total potential losses for alterations to the premises
(a) item 1 - $5,408;
(b) item 8 - $1,456;
(c) item 9 - $480;
(d) item 12 - $832;
(e) item 28 - $160.
Schedule B - Claims for failure to maintain premises
Failure to clean the exterior of the building; failure to maintain vegetation causing damage to exterior walls; contaminating/staining wall with ink/chemicals and from awning flashing disrepair.
Item 3 - Failure to maintain vegetation, causing damage to east and west walls
there was an area in the north western corner where a lot of chemicals were being stored in large containers, 44-gallon containers or 180-litre drums. They were sitting on top of wooden pallets. The wooden pallets have nails in them that rust. The chemical in the drums - the drums get rusty and leak, and they - some of those drums sit there for months. There's also a multitude of bins in that area, and, uh, glue and chemical were placed in those bins. They're rotated - they're emptied, like, oh, maybe once a fortnight, I'm not sure, might be weekly, but they also leak. They have drain holes in those bins, those big wheelie bins. They're not just domestic wheelie bins, they're commercial bins that you can - you pick up with forklifts, they have wheels on them like this.
And what was the state of repair of the concrete area underneath those bins?‑‑‑Oh, there was rust stains, glue stains, um, chemical stain, uh, there was also two containers place in that area that had never been moved for - weren't moved for a couple of years, so there was debris, all kinds of debris trapped underneath those, and rust from the containers.
Item 19 - Damage to office walls, light switches
I'm aware that it's a warehouse and, you know, there's - it gets dirt in there, but at times, there seems to be no effort to clean it up. ...
Well, let's be a little more specific in terms of what you observed in August of 2022 concerning chemical damage or ink, glue, and dirt?‑‑‑Well, as far as the ink goes, like, when you look at the carpet in the office, there's probably maybe a hundred ink-stains on the carpet in the office. Well, out in the warehouse, there's probably a thousand.
When you say "ink-stains", you mean ink that has been spilled but not cleaned up?‑‑‑Yeah. Or on shoes. Yeah.
I see. Tread - spread by the tread of ‑ ‑ ‑?‑‑‑Well ‑ ‑ ‑
‑ ‑ ‑ shoes?‑‑‑ ‑ ‑ ‑ that's why it's - why it's on the carpet in the office.
Entry door to mezzanine - self closer not working - is damaged and has been removed and not put back on correctly. ... Closer mechanism is still malfunctioning and door has large exposed drill holes at top of door where closer has been shifted. Ink stains all over the door. Needs repaint and new closer installed.
Items 35 and 36 - Dirty and stained mezzanine floor
black marks on the floor from trolleys that have been used to transport heavy paper and things around on that floor. Dragging spillages. Scuff marks. All that kind of stuff. Um, ink on walls around the new printer that was put up there. The current tenants have since cleaned a lot of that stuff. The floor - part - probably 50 per cent of the floor still needs cleaning.
I don't know why - I - I don't know about that. ... The whole mezzanine area is air-conditioned. ...
Now, before I leave schedule B, I'll just revisit 36(d) for a moment concerning ventilation. Are you able to say why would anyone be concerned about ventilation of that building?‑‑‑I - I can't get my head around that one. I don't.
All right. Well, what would cause the requirement for ventilation in the mezzanine floor of a printing press?‑‑‑Yeah. There's fumes in there, right. That's about the only thing. So the air-conditioning - the air-conditioning should be taken care of that.
Right?‑‑‑I don't know if - if you open a - if you have natural ventilation ‑ ‑ ‑
Yes?‑‑‑ ‑ ‑ ‑ that will just totally interfere with air conditioning
No. This is additional suction ventilation?‑‑‑I don't - well, the air-conditioning system recycles the air.
Thank you.
And what was in the mezzanine level?‑‑‑When Chadwick's moved in? Nothing.
Yes. And after they'd moved in?‑‑‑They stored paper. They had, uh, print machines. The whole place was air conditioned by them.
And do those windows - if they're open, would they provide any ventilation into that room?‑‑‑Those - that - so this photo would've been taken whilst we're still working on ‑ ‑ ‑
No. That wasn't my question?‑‑‑Oh, okay.
These windows, if they're open, would they provide any ventilation to the room?‑‑‑They - of course.
Yeah, look, I - I don't know anything about this. ... I - I can't make a comment. ... I didn't develop this.
Item 40 - Water leaks from flashing on west and east walls
I was concerned about the fixings that would be used and, uh, whether the fixings on the bottom of the sign would penetrate a flashing that sits above the top awning. These are façade awnings on the - that are on both ends - both western and eastern end of the building, and, uh, they are structural steel framing which is just attached externally to the outside wall, and then they're cladded with nine mil cement sheets, and there's metal flashings that seal those sheets against the external wall. ...
Well, if those flashings are penetrated then water can penetrate inside the awnings, and the awning - the framing of the awning can then rust. And also, the, um, the flashing is leaking, the penetration, if it's long enough, will puncture the calcium barrier and the concrete wall and allow moisture to penetrate into the wall. Uh, water has penetrated into the awnings, yes. Because the awnings are rusted and I have seen it. And some of the compressed cement sheet has dropped to the western emergency exit path, and if that had - were to hit someone, it would severely damage them or possibly kill them.
Now, I need to just backtrack in your evidence a little bit as to what you observed concerning the awning/flashings?‑‑‑Uh, the awning/flashing, like with the - that was one of the last things I observed, but it - it - the - the flashing that concerns me is on the top awning, which is on the top of the top awning. And the western - the side that was erected on the western wall is placed over the top of that flashing.
What did you observe?‑‑‑That they've mounted the sign over the top of the flashings.
And what was the state of repair when you inspected it? Was there any damage done?‑‑‑There was damage to the flashing, yeah.
Can you describe that?‑‑‑Uh, movement joints, I think, stuff like that, so cracks in the sealant, the paint.
The water leaks are as asserted from "failed awning flashings to west and east walls" this in my opinion is a defect resulting form [sic] poor construction practices and is an issue for the owner to rectify not EPM.
Item 43 - Contaminated hardstand, bio system and ground
(a) item 4 - $1,040;
(b) item 5 - $10,752;
(c) item 6 - $4,992;
(d) item 7 - $832;
(e) item 10 - $624;
(f) item 11 - $1,456;
(g) item 17 - $1,792;
(h) item 19 - $416;
(i) item 23 - $1,664;
(j) item 25 - $896;
(k) item 32 - $2,048;
(l) item 34 - $1,241.
Items 44 and 45 - Preliminaries and staging costs
Items 44 & 45 in the Amended Claim 26/4/24 Land Titles Act 1994 Schedule entitles the tenant to fix any damaged caused to the property. The Preliminaries, site supervision etc. Do not apply.
From this, further reductions should be made if the court accepts the submissions of the defendants that they are not liable to the plaintiffs. Adjustments will then need to be made to the preliminaries depending on what items are allowed and then a profit margin applied to that figure.
The lessee being EPM would subcontract the work which would not incur any overhead costs.
so the way that I calculate it is I take the total cost, and I deduct the preliminaries, and then I calculate what the subtotal is, and then, um, 30 per cent on that.
(a) for the 4 July notice, $2,000;
(b) for the 6 July notice, $1,200;
(c) for the 27 July notice, $3,000;
(d) for the 28 July notice, $3,000; and
(e) for the deed of consent to assignment, $4,000.
Compensation is the cardinal concept. It is the "one principle that is absolutely firm, and which must control all else" ... Cognate with this concept is the rule, described ... as universal, that a plaintiff cannot recover more than he or she has lost.
treating rules which constitute useful guidance in the ascertainment of damages as rigid rules of universal application, instead of treating them as prima facie rules which may be displaced or modified whenever it is necessary to do so in order to achieve a result which provides reasonable compensation for a breach of contract without imposing a liability upon the other party exceeding that which he could fairly be regarded as having contemplated and been willing to accept.
what [the deed] relevantly means is this: anything that the defendants have done in respect of the property, whether by acts of commission or omission, remains their liability. Anything which is done by the new tenant remains their continuing liability, subject, however, to being - to a sort of priority arrangement that the first cab off the rank will be the new tenant and its guarantors, and it's only in the event of default by them that the defendant's liability will arise. None of that, in my submission, affects the issues in this case, because the issues in this case are not about any breach of the provisions of the lease by the assignee.
(k) in the event of a further lease of the premises being granted by the Landlord to the Tenant (including to any successors of the Tenant or to its permitted assigns) consequent upon the exercise of any option to renew contained in this Lease or in the event of the Landlord granting to the Tenant any extension of the term of this Lease, then this guarantee and indemnity will be deemed to extend to the further lease or the extension of the term, as the case may be and will be read and construed as if the further lease were this Lease and the Tenant holding under it were the Tenant referred to in this Lease.
"Existing Guarantor" means any person or entity which has previously guaranteed the performance of the Lessee's obligations under the Lease and Wendy Jane Chadwick.
"Guarantors" means the persons or entities required by Clause 15 of this Agreement to guarantee the obligations of the Assignees in the Lease.
"Obligation" means any legal, equitable, contractual, statutory or other obligation, agreement, covenant, commitment, duty, undertaking or liability.
- ASSIGNOR BOUND BY LEASE
3.1 Effect of this Agreement. Except as expressly provided in this Agreement nothing in this Agreement:
(a) releases the Assignor from the Assignor's Obligations under the Lease or the Claims; nor
(b) affects the Lessor's Rights against the Assignor under the Lease, for acts, omissions, or negligence occurring before, on or after the Assignment Date, even if the act, omission or negligence is by the Assignee.
3.1 No release. The Assignor under this Agreement is not released by:
(a) the termination of this Agreement or the Lease; ...
3.4 The continuing obligations of the Assignor are limited whereby:
(a) the continuing obligations shall end upon the expiry of the current Term of the Lease, and
(b) in the event of a breach of the provisions of the Lease by the Assignee, the Lessors will seek redress or recompense for any loss suffered by reason of that breach from the Assignor [sic], the New Guarantors and the security bond provided by the Assignee pursuant to the terms of the Lease before making demand for recovery of any loss from Assignor or the Existing Guarantors.
- EXISTING GUARANTORS BOUND BY LEASE
4.1 Effect of this Agreement. Except as expressly provided in this Agreement nothing in this Agreement:
(a) releases the Existing Guarantors from the Existing Guarantors Obligations under the Lease nor Claims; nor
(b) affects the Lessor's Rights against the Existing Guarantors under the Lease, for acts, omissions, or negligence occurring before, on or after the Assignment Date, even if the act, omission or negligence is by the Assignee.
4.2 No release. The Existing Guarantors under this Agreement are not released by:
(a) the termination of this Agreement or the Lease; ...
4.3 The continuing obligations of the Existing Guarantors are limited whereby:
(a) they shall end upon the expiry of the current Term of the Lease, and
(b) in the event of a breach of the provisions of the Lease by the Assignee, the Lessors will seek redress or recompense for any loss suffered by reason of that breach from the Assignor [sic], the New Guarantors and the security bond provided by the Assignee pursuant to the terms of the Lease before making demand for recovery of any loss from Assignor or the Existing Guarantors.
- PRIOR CLAIMS
The parties confirm all of the Assignor's Obligations under the Lease and other terms and conditions of the Lease and acknowledge that nothing in this Agreement will extinguish, postpone, lessen or otherwise prejudicially affect a Claim a party may have against another party under the Lease.
- Guarantee
15.1 In consideration of this Agreement, the Guarantors hereby covenant and agrees, contemporaneously with the execution of this Agreement, to sign, seal and deliver to the Lessor the Guarantee in the form in the Schedule to this Agreement.
15.2 Subject to clauses 3.4 and 4.3 of this Agreement, in consideration of this Agreement, Wendy Jane Chadwick hereby covenants and agrees, contemporaneously with the execution of this Agreement, to sign, seal and deliver to the Lessor the Guarantee in the form in the Schedule to this Agreement.
Does Mr Chadwick's guarantee extend to liability for the Landlord's Works?
The value of the reversion - Property Law Act, s 112
assessing the value of the property assuming the works are complete, less a below the line adjustment is the appropriate way to assess the diminution in value to the reversion. In this instance the valuers have adopted cost estimates from the material provided.
I have considered the costs and have concluded that a total of $110,748 of the items costed before preliminaries would be considered by the market to have a material impact on value to be considered as an expense likely to be incurred and requiring adjustment for.
The preliminaries allowance representing 63% of the total cost appears to be in my opinion high.
It is my opinion the allowances for a builder's profit margin of 30%, out of hours and staging cost premiums of 20% and 30% appear higher than normal and when considered in context of diminution in value, would likely not be accepted by the market in the first instance as a reasonable or acceptable estimate without further detail and formal quotes.
In the scenario of a 'willing buyer and willing seller', it would be likely that a prospective purchaser would assume the higher cost to manage risk and maximise the outcome in their favour. Conversely if a reduction in purchase price was sought ... the allowance, might not be accepted by the vendor, or they would to provide their own cost estimate or complete the works to minimise the reduction in price.
... it would generally be accepted that if repairs are not major structural defects, flood or contamination damage, a negotiated commercial outcome would occur, not necessarily at the highest cost ...
The costs that I consider having impact on value ... total $110,000 excluding GST. I make further allowance for additional costs of $20,000 excluding GST and a reduced preliminaries, margin and risk allowance estimate of $70,000 excluding GST ...
Applying this results in a cost allowance of $200,000 excluding GST or $220,000 including GST which I consider to be an appropriate adjustment.
Under the assumption the 'make good' works and repair works associated with the alleged breaches have not been completed, the value assessed requires adjustment, as would be expected from the market.
It is my opinion that the cost of works would be considered by a purchaser as costs they would be likely to incur in returning the property to an appropriate condition to achieve a market rent, or to put the property in a condition suitable for owner occupation.
... I believe the Market would look to seek further clarification on the precise costs, seek multiple formal quotes and then make a below the line adjustment as applied to the capitalised (value assuming the works were complete), with an appropriate allowance for preliminaries, builders margin and contingency in line with the market.
I have adopted a sum of $200,000 in this instance exclusive of GST. I qualify that this allowance is subject to confirmation of actual costs in the form of a building contract or a formal quote.
Taking into account the building's current age and condition, the valuer has adopted an adjustment of $50,000 to reflect the impact on reversion.
considers this to have a material impact on the value of the value of [sic] the reversionary interest on the basis that a prudent purchaser is the willing buyer despite the broader market potentially giving less consideration to this item.
(a) against EPM only, $103,995.92; and.
(b) against Mr Chadwick, $35,348.16.
[1] A copy is in the trial bundle (exhibit 1), commencing at page 3. I shall make further references to documents in the trial bundle as, for example, TB3 (meaning page 3). All quotes in these reasons from any document will include any spelling or other errors contained in the original.
[2] The actual works agreed are pleaded in the statement of claim at [8(a)] and in schedule A. Paragraph 8(a) (incorporating schedule A) is admitted in the defence at [3(a)].
[8] Mr Schlecht and others sometimes referred to him as Mr Rowlings, but I shall refer to him as Mr Rawlings, which I believe to be the correct name.
[10] TB33-37. A copy with amendments to the proposed terms made and signed by the plaintiffs on 20 March 2020 is at TB47-51.
[11] Mr Schlecht remembered himself, Mr Chadwick, Mr Rawlings and possibly Mrs Schlecht: T1-37. Mrs Schlecht remembered herself, Mr Schlecht, Mr Chadwick and Mr Rawlings being there and thought that possibly one other person - perhaps Mr Smith - was also there: T3-60. She also identified notes that she said she made during the meeting: exhibit 6. Mr Chadwick remembered himself, Mr Rawlings and Mr Schlecht: T6-70. Mrs Chadwick gave no evidence about the meeting, nor did Mr Smith.
[12] I infer that she meant to write "Landlord to pay".
Schlecht
EPM Operations Pty Ltd [2025] QDC 105