Medium Neutral Citation: SafeWork NSW v Boral Cement Limited (No. 2) [2026] NSWDC 88
Hearing dates: 27 – 31 October, 3 – 7, 10 – 14, 20 – 21 November 2025
Date of orders: 8 April 2026
Decision date: 08 April 2026
Criminal
Before: Russell SC DCJ
Decision: (1) The elements set out in the Amended Summons dated 28 October 2025 have been proved beyond reasonable doubt.
(2) I find the defendant Boral Cement Limited guilty.
(3) The matter will be listed for mention on 13 April 2026 at 9-30 am to set a date for a sentence hearing and any costs issues.
Catchwords: CRIMINAL LAW – prosecution – work health and safety – duty of persons undertaking business – risk of death or serious injury – where there are concurrent duty holders – whether contractors were agents of the defendant under s 244 of WHS Act
OTHER – bucket elevator conveyor maintenance – conveyor went into an uncontrolled free run – fluid coupling failed – explosion of metal debris struck worker on head – failure to stop work and conduct an updated risk assessment when a change in work process was identified
Legislation Cited: Criminal Procedure Act 1986 (NSW), s 133
Evidence Act 1995 (NSW), s 165
Mines Safety and Inspection Act 1994 (WA), s 9
Public Health Act 1902 (NSW), s 79
Work Health and Safety Act 2011 (NSW), ss 3, 7, 12A, 16, 17, 18, 19, 32, 46, 47, 48, 244, 274, 275
Work Health and Safety Regulation 2017 (NSW), cll 32, 33, 34, 35, 36, 37, 38
Cases Cited: Baiada Poultry Pty Limited v The Queen [2012] HCA 13; (2012) 246 CLR 92
Bulga Underground Operations v Nash [2016] NSWCCA 37
Constantanidis v R [2022] NSWCA 4
Dunlop Rubber Australia Ltd v Buckley [1952] HCA 72; (1952) 87 CLR 313
Genner Constructions Pty Ltd v WorkCover Authority of New South Wales [2001] NSWIRComm 267; (2001) 110 IR 57
Grasso Consulting Engineers Pty Ltd v SafeWork NSW [2021] NSWCA 288
Hamersley Iron Pty Ltd v Robertson (Unreported, Supreme Court of Western Australia, Steytler J, 2 October 1998)
Holmes v R E Spence & Co Pty Ltd (1992) 5 VIR 119
Kench v Adams (1906) 23 WN (NSW) 48
Kirwin v The Pilbara Infrastructure Pty Ltd [2012] WASC 99
Laing O’Rourke (BMC) Pty Ltd v Kirwin [2011] WASCA 117 at [33].
Landmark Roofing Pty Ltd v SafeWork NSW [2021] NSWCCA 95
Orr v Hunter Quarries Pty Ltd [2022] NSWCCA 39
Poletti Corporation Pty Limited v SafeWork NSW [2020] NSWCCA 243
R v Associated Octel Ltd [1994] 4 All ER 1051
Royall v The Queen [1991] HCA 27; (1991) 172 CLR 378.
SafeWork NSW v Poletti Corporation Pty Ltd [2019] NSWDC 491
SafeWork NSW v Poletti Corporation Pty Ltd [2019] NSWDC 491
Simpson Design and Associates Pty Ltd v Industrial Court of New South Wales [2011] NSWCA 316
Slivak v Lurgi (Australia) Pty Ltd [2001] HCA 6; (2001) 205 CLR 304
Smith v Broken Hill Pty Ltd [1957] HCA 34; (1957) 97 CLR 337
Tangerine Confectionery Ltd and Veolia ES (UK) Ltd v R [2011] EWCA Crim 2015
WorkCover Authority of New South Wales v Kellogg (Aust) Pty Ltd [1999] NSWIRComm 453
Texts Cited: Bowstead & Reynolds on Agency, (Sweet & Maxwell Ltd, 23rd Edition)
Dal Pont, Law of Agency, (Lexis Nexis, 4th Edition)
SafeWork NSW, Code of Practice: How to manage work health and safety risks, August 2019
SafeWork NSW, Code of Practice: Managing the risks of plant in the workplace, August 2019
SafeWork NSW, Code of Practice: Work Health and Safety Consultation, Cooperation and Coordination, August 2019
Category: Principal judgment
Parties: SafeWork NSW (Prosecutor)
Boral Cement Limited (Defendant)
Representation: Counsel:
J Stratton SC / B Docking / M Watts (Prosecutor)
A Moses SC / C Magee (Defendant)
Solicitors:
Department of Customer Service (Prosecutor)
Ashurst Australia (Defendant)
File Number(s): 2024/00054403
On 13 February 2022 Mr Douglas Bennett was working at the Boral Cement Facility located at Taylor Avenue in New Berrima. Work was being done on the conveyor belt of a bucket elevator, known as EL13. The conveyor belt went into free run, over sped and a fluid coupling exploded. Mr Bennett suffered severe injuries when he was struck by metal from the exploding coupling.
On 9 February 2024 SafeWork NSW (SafeWork) filed a summons charging Boral Cement Limited (Boral) with a Category 2 offence pursuant to s 32 of the Work Health and Safety Act 2011 (NSW) (the WHS Act).
Boral pleaded not guilty.
Early in the running of the trial an Amended Summons was filed by leave, which deleted some of the particulars of the alleged failure to comply with the s 19(1) duty.
As the judge of the facts in a trial by judge alone, as well as the judge of the law, I must find the facts and draw inferences from them as well as apply the law to the facts that I find. I must bring an open and unbiased mind to the evidence and view it clinically and dispassionately and not let emotion enter into the decision-making process. Both the prosecution and the defendant are entitled to my verdict free of partiality, prejudice, favour or ill-will. I must then deliver my verdict according to the evidence.
The prosecution bears the onus of proving the guilt of the defendant at all times. The defendant does not have to prove that it did not commit the offence charged. If the defendant does adduce any evidence which is consistent with its innocence, it does not have to prove it; it is for the prosecution to disprove it or show that it is irrelevant, otherwise the prosecution will not have proved its case. The standard of proof of the prosecution case is proof beyond reasonable doubt and the defendant cannot be found guilty of the offence unless the evidence which I accept satisfies me beyond reasonable doubt of its guilt.
The defendant is presumed by law to be innocent of the offence unless and until the evidence I accept satisfies me that each and every element of the relevant charge has been proved beyond reasonable doubt. The defendant then loses the presumption of innocence and I must find it guilty. If, however, the evidence which I accept fails to satisfy me beyond reasonable doubt of any or all of the elements of the offence charged then it remains presumed innocent and I must find a verdict of not guilty. If I am satisfied that there may be an explanation consistent with the innocence of the defendant of the charge, or I am unsure of where the truth lies, then I must find the charge has not been proved to the standard of proof required by law and I must find the defendant not guilty.
I must determine whether each of the witnesses is a reliable witness; that is, whether I can rely on the evidence that the witness gives and so find the facts about which the witness has given evidence. I can accept part of the evidence of a witness and reject part of that evidence or accept or reject it all. I must determine the facts in accordance with the evidence, considered logically and rationally, without acting capriciously or irrationally, but I may use my common sense, experience and wisdom in assessing the evidence.
My judgment must include the principles of law applied and the findings of fact relied upon: s 133(2) Criminal Procedure Act 1986 (NSW).
I must consider whether the evidence of any witness is unreliable and warn myself accordingly: s 165 Evidence Act 1995 (NSW); Constantanidis v R [2022] NSWCA 4.
“12. The risk was the risk to workers, in particular Messrs Bennett, Burgess, Ragg, Felix, Astil, Cox and Bevan, suffering serious injury or death as a result of being struck, hit, burnt or otherwise coming into contact with:
(a) failed, cracked or exploding components of the hydraulic coupling;
(b) failed, cracked or exploding components of the cover or guard for the hydraulic coupling; and/or
(c) hot hydraulic oil/fluid
whilst working in the vicinity of the conveyor belt of EL13 during the work.”
“13. The defendant failed to ensure, so far as is reasonably practicable, the health and safety of workers, and in particular Messrs Bennett, Burgess, Ragg, Felix, Astil, Cox and Bevan, in that it failed to take one or more of the following measures, each of which is alleged to have been reasonably practicable, to eliminate, or alternatively minimise if it was not reasonably practicable to eliminate the risk:
a. Installing, or taking steps to confirm Nepean installed, the new belt of EL13 without any buckets mounted to it and then subsequently mounting the buckets after the belt was joined;
b. In the alternative to (a) above, utilizing an appropriately weight rated and sized crane to lift the new belt with all buckets attached to it (other than where the belt needed to be joined and hot cast), into place for installation and joining;
c. In the alternative to both (a) and (b) above, where some buckets are mounted to the conveyor belt of EL13 prior to it being joined, providing, maintaining and implementing, or taking steps to confirm that Nepean was providing, maintaining and implementing, a safe system of work for the work, which involved
i. confirming the buckets are mounted and distributed evenly on the belt so that the belt is in balance;
ii. until the belt is in balance, not directing or permitting the bump starting or inching or barring of the belt; and/or
iii. identifying that the guard for the fluid coupling was not designed nor suitably constructed to contain parts of the coupling in the event of a catastrophic failure;
d. In the event paragraph 13(c) above is followed, preparing and enforcing a safe work method statement (SWMS), or taking steps to confirm that Nepean has prepared and enforced a SWMS, for the work on EL13 which included the steps identified at 13(c) above;
e. Following the instructions, or making enquiries to confirm Nepean and/or Fenner was following the instructions, for installation in the Beumer Group Bucket elevator Installation Instructions sections 5.3.8 and 5.3.9 of document BA-619080046-en dated 2019-08-05, namely, how to mount the buckets to ensure the belt in balance;
f. Confirming that the conveyor belt was in balance before removing, or permitting the removal of, the isolation locks for EL13;
g. Using, or taking steps to confirm Nepean were using, chain blocks to control the conveyor belt of EL13 as it was rotated to prevent free running;
h. Confirming that the coupling and main drive motor have been uncoupled from the conveyor’s gearbox prior to inching and barring of the belt;
i. Implementing and enforcing a requirement that where a change in work process is identified which may lead to new potential hazards or risks during the work, that work is stopped and an updated risk assessment is conducted to identify the appropriate controls/measures to address potential hazards or risks and implementing the most effective risk control measures to address those hazards or risks;
j. Consulting, enquiring or otherwise confirming with a mechanical engineer from Beumer Group and/or mechanical engineer Jagdeep Singh Gill Gurcharan Singh aka Mr Jack Gill, specific information, instruction and/or guidance, or confirming that Nepean had done so, regarding the following prior to lifting the new belt into position:
i. the number of buckets, if any, that should or could be mounted on the belt prior to lifting and where they should or could be placed on the belt;
ii. the number of buckets, that had in fact been mounted on the belt prior to lifting and where they had been mounted;
iii. the appropriateness of the method of inching or barring of the belt occurring in the preparation of wire splicing and white metal casting having regard to (i) and (ii) above*;* and/or
iv. the potential hazard of the belt being unbalanced, free running or over speeding given the number and configuration of buckets mounted on the belt; and/or
k. Adequately taking heed of, listening to and/or addressing concerns raised by workers regarding the installation of the new belt of EL13 with some buckets mounted, and what would occur when EL13 was turned on.”
“A person commits a Category 2 offence if—
(a) the person has a health and safety duty, and
(b) the person fails to comply with that duty, and
(c) the failure exposes an individual to a risk of death or serious injury or illness.”
“(1) A person conducting a business or undertaking must ensure, so far as is reasonably practicable, the health and safety of—
(a) workers engaged, or caused to be engaged by the person, and
(b) workers whose activities in carrying out work are influenced or directed by the person,
while the workers are at work in the business or undertaking.”
Element 1 The defendant was a person conducting a business or undertaking (PCBU). This element was admitted by Boral.
Element 2 The defendant owed the workers a duty under s 19(1) of the Act. This element was admitted by Boral.
Element 3 The defendant failed to comply with that duty.
Element 4 The failure exposed the workers to a risk of death or serious injury.
“(1) The main object of this Act is to provide for a balanced and nationally consistent framework to secure the health and safety of workers and work places by —
(a) protecting workers and other persons against harm to their health, safety and welfare through the elimination or minimisation of risks arising from work or from specified types of substances or plant, and
…
(h) maintaining and strengthening the national harmonisation of laws relating to work health and safety and to facilitate a consistent national approach to work health and safety in this jurisdiction.
(2) In furthering subsection (1)(a), regard must be had to the principle that workers and other persons should be given the highest level of protection against harm to their health, safety and welfare from hazards and risks arising from work or from specified types of substances or plant as is reasonably practicable.”
The offence is one of strict liability: s 12A of the WHS Act.
The content of the “primary duty of care” is set out in s 19 of the WHS Act which provides:
“(1) A person conducting a business or undertaking must ensure, so far as is reasonably practicable, the health and safety of—
(a) workers engaged, or caused to be engaged by the person, and
(b) workers whose activities in carrying out work are influenced or directed by the person,
while the workers are at work in the business or undertaking.
(2) A person conducting a business or undertaking must ensure, so far as is reasonably practicable, that the health and safety of other persons is not put at risk from work carried out as part of the conduct of the business or undertaking.
(3) Without limiting subsections (1) and (2), a person conducting a business or undertaking must ensure, so far as is reasonably practicable—
(a) the provision and maintenance of a work environment without risks to health and safety, and
(b) the provision and maintenance of safe plant and structures, and
(c) the provision and maintenance of safe systems of work, and
(d) the safe use, handling, and storage of plant, structures and substances, and
…
(f) the provision of any information, training, instruction or supervision that is necessary to protect all persons from risks to their health and safety arising from work carried out as part of the conduct of the business or undertaking, and
(g) that the health of workers and the conditions at the workplace are monitored for the purpose of preventing illness or injury of workers arising from the conduct of the business or undertaking.”
“(1) A person is a worker if the person carries out work in any capacity for a person conducting a business or undertaking, including work as—
(a) an employee, or
(b) a contractor or subcontractor, or
(c) an employee of a contractor or subcontractor, or
(d) …”
“(1) More than one person can concurrently have the same duty.
(2) Each duty holder must comply with that duty to the standard required by this Act even if another duty holder has the same duty.
(3) If more than one person has a duty for the same matter, each person—
(a) retains responsibility for the person’s duty in relation to the matter, and
(b) must discharge the person’s duty to the extent to which the person has the capacity to influence and control the matter or would have had that capacity but for an agreement or arrangement purporting to limit or remove that capacity.”
“A duty imposed on a person to ensure health and safety requires the person—
(a) to eliminate risks to health and safety, so far as is reasonably practicable, and
(b) if it is not reasonably practicable to eliminate risks to health and safety, to minimise those risks so far as is reasonably practicable.”
The word “risk” is not defined in the WHS Act. Risk should not be interpreted in a complicated fashion. Safety cannot be ensured if a risk is present. The presence of a risk to the health or safety of a worker constitutes a breach of s 19 of the WHS Act. It is not necessary that there be a particular accident, or that a person is actually injured. What is required is the creation of the risk. The relevant risk for the commission of the s 32 offence is a risk of death or serious injury: s 32(c) of the WHS Act.
An incident causing injury may be evidence of the presence of a risk and may be relevant in due course to sentencing as a measure of the severity of the harm suffered as a result of the risk. But a distinction must be drawn between the specific risk that manifested in the incident and the general class of risk that the analysis must focus on. Paying too close attention to the specific risk resulting in an incident can lead to error: Tangerine Confectionery Ltd and Veolia ES (UK) Ltd v R [2011] EWCA Crim 2015.
The prosecution bears the onus of proving as an element of the offence that at the time of the offence it was reasonably practicable to ensure the health and safety of the persons alleged to be at risk. The risk should be identified with sufficient precision to determine if it was reasonably practicable to eliminate the risk, or if not, it was reasonably practicable to minimise it. In this way the application of reasonable practicability may arise more than once.
“Reasonably practicable” is defined in s 18 of the WHS Act which provides:
“In this Act, reasonably practicable, in relation to a duty to ensure health and safety, means that which is, or was at a particular time, reasonably able to be done in relation to ensuring health and safety, taking into account and weighing up all the relevant matters including—
(a) the likelihood of the risk concerned occurring, and
(b) the degree of harm that might result from the risk, and
(c) what the defendant knows, or ought reasonably to know, about;
(i) the hazard or the risk, and
(ii) ways of eliminating or minimising the risk, and
(d) the availability and suitability of ways to eliminate or minimise the risk, and
(e) after assessing the extent of the risk and the available ways of eliminating or minimising the risk, the cost associated with available ways of eliminating or minimising the risk, including whether the cost is grossly disproportionate to the risk.”
The state of knowledge applied to the definition of reasonably practicable is objective. It is that possessed by persons generally who are engaged in the relevant field of activity and not the actual knowledge of a specific defendant in particular circumstances: Laing O’Rourke (BMC) Pty Ltd v Kirwin [2011] WASCA 117 at [33].
The reasonably practicable requirement applies to matters which are within the power of the defendant to control, supervise and manage: Slivak v Lurgi (Australia) Pty Ltd [2001] HCA 6; (2001) 205 CLR 304 at [37] per Gleeson CJ, Gummow and Hayne JJ.
The s 19 duty requires knowledge of the risk emanating from the activities of the defendant: Slivak. Foreseeability of the risk to persons from the activity is an element of this question of knowledge. It would not generally be practicable to take measures to guard against a risk to safety that was not reasonably foreseeable: Genner Constructions Pty Ltd v WorkCover Authority of New South Wales [2001] NSWIRComm 267; (2001) 110 IR 57 at [68].
The reasonable foreseeability of an incident is relevant to whether the pleaded measures were reasonably practicable, but is not necessarily determinative: Orr v Hunter Quarries Pty Ltd [2022] NSWCCA 39.
The statutory duty is not limited to simply preventing foreseeable risks of injury. The duty is to protect against all risks if that is reasonably practicable. Reasonably practicable means something narrower than physically possible or feasible: Slivak at [53] per Gaudron J.
The words “reasonably practicable” indicate that the duty does not require a defendant to take every possible step that could be taken. The steps to be taken in the performance of the duty are those that are reasonably practicable for the employer to achieve the provision of and maintenance of a safe working environment. Bare demonstration that a step might have had some effect on the safety of a working environment does not, without more, demonstrate a breach of the duty: Baiada Poultry Pty Limited v The Queen [2012] HCA 13; (2012) 246 CLR 92 at [15] and [38] per French CJ, Gummow, Hayne and Crennan JJ.
Breach of the duty under s 19 must be assessed prospectively and not through “the prism of hindsight”.
Evidence of actions taken by a defendant after the incident is admissible on the question of whether the steps particularised in the Summons were reasonably practicable: Poletti Corporation Pty Limited v SafeWork NSW [2020] NSWCCA 243 at [9] and [35].
An employer must have a proactive approach to safety issues. The question is not did the employer envisage a particular danger, but rather should it have: WorkCover Authority of New South Wales v Kellogg (Aust) Pty Ltd [1999] NSWIRComm 453.
A defendant must have regard not only for the ideal worker but also for one who is careless, inattentive or inadvertent: Dunlop Rubber Australia Ltd v Buckley [1952] HCA 72; (1952) 87 CLR 313 at 320 per Dixon CJ. If there is a foreseeable risk of injury arising from the employee’s negligence in carrying out his or her duties then this is a factor which the employer must take into account: Smith v Broken Hill Pty Ltd [1957] HCA 34; (1957) 97 CLR 337 at 343. It may not always be possible to foresee various acts of inadvertence by workers but defendants must conduct operations on the basis that such acts will occur and they must be guarded against to the fullest extent practicable.
The prosecution must prove that the act or omission of the defendant was a significant or substantial cause of the worker being exposed to the risk of injury: Bulga Underground Operations v Nash [2016] NSWCCA 37 at [127].
The question is to be determined by the application of common sense to the facts, bearing in mind that the purpose of the inquiry is to attribute legal responsibility in a criminal matter: Royall v The Queen [1991] HCA 27; (1991) 172 CLR 378.
Regard must be had to the scope and objects of the Act: Simpson Design and Associates Pty Ltd v Industrial Court of New South Wales [2011] NSWCA 316 at [79]-[102]. The relevant question is not whether the particularised failures of the defendant were the cause of the death or injury, but rather whether there was a causal relationship between the act or omission and the risk to which a worker was exposed: Bulga at [130].
Causation must be assessed having regard to what actually occurred: Grasso Consulting Engineers Pty Ltd v SafeWork NSW [2021] NSWCA 288 at [99].
Part 3.1 Managing risks to health and safety
32 Application of Part 3.1
This Part applies to a person conducting a business or undertaking who has a duty under this Regulation to manage risks to health and safety.
33 Specific requirements must be complied with
Any specific requirements under this Regulation for the management of risk must be complied with when implementing the requirements of this Part.
Examples.
1 A requirement not to exceed an exposure standard.
2 A duty to implement a specific control measure.
3 A duty to assess risk.
34 Duty to identify hazards
A duty holder, in managing risks to health and safety, must identify reasonably foreseeable hazards that could give rise to risks to health and safety.
35 Managing risks to health and safety
A duty holder, in managing risks to health and safety, must—
(a) eliminate risks to health and safety so far as is reasonably practicable, and
(b) if it is not reasonably practicable to eliminate risks to health and safety—minimise those risks so far as is reasonably practicable.
36 Hierarchy of control measures
(1) This clause applies if it is not reasonably practicable for a duty holder to eliminate risks to health and safety.
(2) A duty holder, in minimising risks to health and safety, must implement risk control measures in accordance with this clause.
(3) The duty holder must minimise risks, so far as is reasonably practicable, by doing 1 or more of the following—
(a) substituting (wholly or partly) the hazard giving rise to the risk with something that gives rise to a lesser risk,
(b) isolating the hazard from any person exposed to it,
(c) implementing engineering controls.
(4) If a risk then remains, the duty holder must minimise the remaining risk, so far as is reasonably practicable, by implementing administrative controls.
(5) If a risk then remains, the duty holder must minimise the remaining risk, so far as is reasonably practicable, by ensuring the provision and use of suitable personal protective equipment.
Note.
A combination of the controls set out in this clause may be used to minimise risks, so far as is reasonably practicable, if a single control is not sufficient for the purpose.
37 Maintenance of control measures
A duty holder who implements a control measure to eliminate or minimise risks to health and safety must ensure that the control measure is, and is maintained so that it remains, effective, including by ensuring that the control measure is and remains—
(a) fit for purpose, and
(b) suitable for the nature and duration of the work, and
(c) installed, set up and used correctly.
38 Review of control measures
(1) A duty holder must review and as necessary revise control measures implemented under this Regulation so as to maintain, so far as is reasonably practicable, a work environment that is without risks to health or safety.
(2) Without limiting subclause (1), the duty holder must review and as necessary revise a control measure in the following circumstances—
(a) the control measure does not control the risk it was implemented to control so far as is reasonably practicable,
Examples.
1 The results of monitoring show that the control measure does not control the risk.
2 A notifiable incident occurs because of the risk.
(b) before a change at the workplace that is likely to give rise to a new or different risk to health or safety that the measure may not effectively control,
(c) a new relevant hazard or risk is identified,
(d) the results of consultation by the duty holder under the Act or this Regulation indicate that a review is necessary,
(e) a health and safety representative requests a review under subclause (4).
(3) Without limiting subclause (2)(b), a change at the workplace includes—
(a) a change to the workplace itself or any aspect of the work environment, or
(b) a change to a system of work, a process or a procedure.
(4) A health and safety representative for workers at a workplace may request a review of a control measure if the representative reasonably believes that—
(a) a circumstance referred to in subclause (2)(a), (b), (c) or (d) affects or may affect the health and safety of a member of the work group represented by the health and safety representative, and
(b) the duty holder has not adequately reviewed the control measure in response to the circumstance.
“Imputing Conduct to Bodies Corporate
(1) For the purposes of this Act, any conduct engaged in on behalf of a body corporate by an employee, agent or officer of the body corporate acting within the actual or apparent scope of his or her employment, or within his or her actual or apparent authority, is conduct also engaged in by the body corporate.”
“81 As set out in s 244(1), conduct of an employee acting within the actual or apparent scope of his employment is conduct also engaged in by the body corporate, being the appellant. It is not necessary to consider whether he was acting within his actual or apparent authority because Mr Dart was an employee of the appellant, rather than an independent contractor or agent.
…
84 Section 244 is clear in its terms. Any conduct engaged in by an employee acting within the actual or apparent scope of his or her employment is conduct also engaged in by the body corporate for the purposes of the WHS Act. There is no limitation in s 244 on the type of employee or the level of authority that the employee might have.
85 The only limitation expressed in s 244 is that it must be conduct engaged in on behalf of a body corporate by an employee acting within the actual or apparent scope of his or her employment.
…
88 There is no qualification to s 244(1) to the effect that if the conduct of the employee, in this case, Mr Dart, was not foreseeable (as the appellant asserts), s 244 would not apply. Section 244 has the effect of attributing the conduct of one person to another, having regard to their relationship, not having regard to employer’s state of knowledge of the possibility of the conduct occurring.”
**“**Par 13(f) Confirming that the conveyor belt was in balance before removing, or permitting the removal of, the isolation locks for EL13
• The omission of both NEI or FD or both to confirm that the conveyor belt was in balance before removing, or permitting the removal of, the isolation locks for EL13
• Identified at [10]-[15] and [23]-[25] and [107](m) of the Prosecutor’s Opening in Summary Proceedings (General)
• As contained in Tab 56 - WhatsApp conversation relating to undertaking the task
Par 13(h) Confirming that the coupling and main drive motor have been uncoupled from the conveyor’s gearbox prior to inching and barring of the belt
• The omission of both NEI or FD or both to confirm that the coupling and main drive motor have been uncoupled from the conveyor’s gear box prior to inching and barring of the belt
Par 13(i**) Implementing and enforcing a requirement that where a change** in work process is identified which may lead to new potential hazards or risks during the work, that work is stopped and an updated risk assessment is conducted to identify the appropriate controls/measures to address potential hazards or risks and implementing the most effective risk control measures to address those hazards or risks
• NEI, or FD, or both, failing to implement or enforce a requirement that where a change in work process is identified which may lead to new potential hazards or risks during the work, the work is stopped and an updated risk assessment was conducted to identify the appropriate controls/measures to address potential hazards or risks and implementing the most effective risk control measures to address those hazards
• Identified at [114] of Tab 5 of MFI 1
Par 13(k) Adequately taking heed of, listening to and/or addressing concerns raised by workers regarding the installation of the new belt of EL13 with some buckets mounted, and what would occur when EL13 was turned on
• NEI or FD or both failing to take head of, listening to, and/ or addressing concerns raised by workers regarding the installation of the new belt of EL13 with some buckets mounted, and what would occur when EL13 was turned on
• Those concerns are identified in Tab 5 of MFI 1, POS2 at [154]-[161]
• The concerns raised and identified by Mr Bennett in the statement produced under subpoena.”
Those particulars merely list certain acts or omissions of Nepean or Fenner. They provide no guidance as to how it can be said that the relationship of principal and agent arose, or how acts done by Nepean or Fenner were done as agents for Boral.
The entirety of the final written submission by SafeWork upon this topic was one sentence, as follows (MFI 40, page 39):
“Not only does s 244 attribute acts of its own employee workers to Boral Cement, each of Nepean and FD was an agent of Boral Cement for the purposes of s 244.”
There was not one word in the submissions to support that proposition. The issue of agency was keenly in contest, and such contest was known to SafeWork well before the trial commenced. In those circumstances it is difficult to accept that SafeWork was serious in pursuing an argument that Nepean and Fenner were agents of Boral. Nevertheless, the court must deal with that one sentence submission.
Bowstead & Reynolds on Agency 23rd Edition says in par 1-001:
“Agency is the fiduciary relationship which exists between two persons, one of whom expressly or impliedly manifests assent that the other should act on his behalf so as to affect his legal relations with third parties, and the other of whom similarly manifests assent so to act or so acts pursuant to the manifestation. The one on whose behalf the act or acts are to be done is called the principal. The one who is to act is called the agent.”
Dal Pont, Law of Agency, 4th Edition, says in par 1.4 that a crucial element in determining that there is an agency relationship is to identify consent or assent to the creation of the relationship. Agency relationships necessarily involve an agent acting in a representative capacity for the principal, whether for the purpose of creating contractual relations for the principal or to represent the principal in a more restricted ambit. Dal Pont also says (par 1.6) that an express stipulation by the parties that their arrangement is not to be construed as an agency is not necessarily determinative, although it is a weighty consideration in the absence of evidence that the label is a sham.
Dal Pont also says (par 1.7) that any definition of the term agent in legislation operates in place of its legal definition. If that term is not statutorily defined, its meaning “is determined by the purpose of the Act and the context in which reference to the term is made.”
As an example, Dal Pont refers to Kench v Adams (1906) 23 WN (NSW) 48. The defendant Adams was charged with the criminal offence of selling adulterated milk. Adams was a dairyman. Adams employed an agent named Spindler to deliver milk for him on commission. In turn Spindler employed a boy named Leslie to assist him in delivering milk. A sample of the milk in question was sold by Leslie to a sanitary inspector, who laid a criminal charge against Adams. Adams had nothing to do with Leslie who was engaged and paid by Spindler.
Justice Pring held that having regard to the object of the Public Health Act 1902 (NSW), the word “agent” must have a liberal construction placed upon it. His Honour held that “agent” includes any person who sells goods of the defendant when the money, the product of the sale, goes into the defendant’s pocket. The money the result of the sale went into Adams’ pocket. His Honour held that “the boys may be said to be the defendant’s agent, because otherwise it would be very easy to evade the Act”. Section 79(3) of the Public Health Act 1902 said that any sample of food obtained by an inspector “shall be deemed to have been sold to such officer by the person dealing in it or having it for sale or his agent or servant”. Thus there was a factual question to be determined, which was answered by looking to the common law notion of an agent as a person acting in a representative capacity for a principal, in this case by selling the defendant’s milk.
Section 3(1)(a) of the WHS Act provides that one of the objects of the legislation is “protecting workers and other persons against harm to their health, safety and welfare through the elimination or minimisation of risks arising from work or from specified types of substances or plant”. Section 16 of the WHS Act provides that more than one person can concurrently have the same duty, and that each duty holder must comply with that duty to the standard required by the legislation, even if another duty holder has the same duty. If more than one person has a duty for the same matter, then each person retains responsibility for the person’s duty in relation to the matter.
The danger which was perceived in Kench v Adams was that unless a defendant was responsible for the acts of his agents, it would be very easy to evade the Act. Having regard to s 16 of the WHS Act, that is not a concern in relation to the WHS Act.
There is a simple factual question to be determined. It is whether, as a matter of fact, Nepean and Fenner were agents of Boral in carrying out the work on EL13, and thus under s 244 of the WHS Act Boral is liable for the failures of Nepean and Fenner. That question is dealt with below.
Boral was the owner and operator of the Boral Cement Facility at New Berrima. As part of its planned maintenance a shutdown was conducted in early 2022. To carry out the shutdown Boral engaged a large number of specialist contractors. The particular job which is the subject of these proceedings was the replacement of the conveyor belt on the bucket elevator EL13 (sometimes called EL013). The conveyor belt was to be replaced and some of the buckets were to be replaced. Two contractors were engaged to carry out the work. Nepean was engaged to perform both tasks. Fenner was engaged to join (splice) the two ends of the new conveyor belt together, so that it could run as a continuous loop. Beumer Group Australia Pty Ltd (Beumer) was the original equipment manufacturer (OEM) of EL13. Beumer was engaged to provide advice and support during the replacement of the belt and the buckets.
Reference was made to several decided cases which have considered the duty imposed upon a principal contractor, when there is a specialist sub-contractor on site carrying out specialised work.
Boral submitted (MFI 44, pars 12.2-12.4) that:
Boral did not have the relevant engineering expertise in the EL13 belt replacement.
Boral engaged Beumer to advise and supervise Nepean and Fenner on the EL13 work.
Nepean and Fenner were both specialist contractors.
The incident occurred because Nepean did not follow Beumer’s advice.
The prosecution has not proved that the pleaded measures should have been adopted by Boral.
Underlying that formulation was the proposition advanced many times during the evidence of the key Boral witness (Mr Mick Davis) that Nepean was the specialist contractor performing and supervising the EL13 work, and that Nepean (but not Boral) had the obligation to take appropriate steps to ensure safety. Examples are set out below in the summary of the evidence given by Mr Davis.
I turn to consider the relevant cases upon the subject of the work health and safety duties of a principal, where it engages a specialist contractor.
In Hamersley Iron Pty Ltd v Robertson (Unreported, Supreme Court of Western Australia, Steytler J, 2 October 1998), the facts were that a worker was killed when a reclaimer, which is a specialised piece of mining equipment, collapsed.
A magistrate had convicted the appellant of a breach of s 9(1)(a) of the Mines Safety and Inspection Act 1994 (WA). That section provided as follows:
“An employer must, so far as is practicable, provide and maintain at a mine a working environment in which that employer’s employees are not exposed to hazards and, in particular, but without limiting the generality of that general obligation, an employer must –
(a) provide and maintain workplaces, plant, and systems of work of a kind that, so far as is practicable, the employer’s employees are not exposed to hazards …”
“It seems to me that s 9, in requiring an employer, so far as is practicable, to provide a safe working environment, imposes a duty, personal to the employer, not only to do what is reasonably practicable for the purposes of obtaining that objective in the course of its own activities but to ensure, where that is reasonably practicable, that reasonable care is taken by subcontractors whose assistance is necessary in circumstances in which their failure to take such care might expose employees of the employer to hazards.
However that cannot mean that an employer can never rely upon what is done by a suitably qualified expert engaged by it.”
“Here, the personal duty imposed upon the employer is, as I have said, that of providing a safe workplace, so far as is practicable. If that, in turn, requires the employer to call upon expertise which it does not itself have then there is no reason why it should not do so and, indeed, every reason why it should. Moreover, in considering whether it did what it could, so far as was practicable, to ensure that those upon whom it relied in turn exercised reasonable care, its own lack of expertise (if any) and the expertise of the independent contractor must be taken into account. If the task undertaken by the independent contractor is one which demonstrably falls within its area of expertise and outside that of the employer and if the task reasonably appears to the employer, who has such knowledge of the matters specified in s 9(1)(b) of the Act as might be expected to be had by employers of its kind, to have been carefully and safely performed by the independent contractor then it would ordinarily be difficult to conclude that the employer had breached the duty put upon it by the Act. It would not, in circumstances of that kind, ordinarily have been practicable for it to have done more.”
Laing O*’*Rourke (BMC) Pty Ltd v Kirwin [2011] WASCA 117 was a case involving risk which arose when damage was done to residential units, known as “dongas”, caused when Cyclone George passed across the Pilbara coast in Western Australia in March 2007. The appellant (Laing O’Rourke) had engaged Pilbara Infrastructure Pty Ltd to construct a railway line associated with an iron ore mine and a port. The dongas were located in a camp (known as RV1) for the workers engaged on the building of the railway line. Laing O’Rourke had not constructed the facilities at the camp. That had been done by a building company in accordance with plans and specifications approved by the local authority. Those plans and specifications contained a significant error. The buildings were not strong enough to withstand the wind load of a cyclone, such as could be expected in that area. The dongas were not designed or built to withstand winds of the force required by the Australian Standard for the relevant location. The foundations of the dongas were structurally deficient.
The court noted that s 19(1) of the Western Australian legislation required an employer, so far as is practicable, to provide and maintain a working environment in which the employees of the employer are not exposed to hazards. The word “practicable” was defined in the legislation to mean reasonably practicable having regard to certain prescribed matters.
The Court of Appeal said at [31] that the words “reasonably practicable” are ordinary words, bearing their ordinary meaning which simply called for the making of a value judgment in the light of all the facts: Slivak at 322 per Gaudron J.
The Court of Appeal approved the decision of Justice Harper in Holmes v R E Spence & Co Pty Ltd (1992) 5 VIR 119 at 123-124 where his Honour said of an equivalent Victorian provision:
“The Act does not require employers to ensure that accidents never happen. It requires them to take such steps as are practicable to provide and maintain a safe working environment. The courts will best assist the attainment of this end by looking at the facts of each case as practical people would look at them: not with the benefit of hindsight, nor with the wisdom of Solomon, but nevertheless remembering that one of the chief responsibilities of all employers is the safety of those who work for them.”
The Court of Appeal noted at [35] that the duty, so far as is practicable, to maintain a safe workplace may involve a consideration of matters which are beyond the employer’s own area of expertise. The employer’s lack of direct control over such matters may affect its knowledge and, in consequence, the question of what was reasonably practicable in the circumstances.
The Court of Appeal at [35] quoted with approval the following passage from R v Associated Octel Ltd [1994] 4 All ER 1051 at 1063:
“… the question of control may be very relevant to what is reasonably practicable. In most cases the employer/principal has no control over how a competent or expert contractor does the work. It is one of the reasons why he employs such a person - that he has the skill and expertise, including knowledge of appropriate safety precautions which he himself may not have. He may be entitled to rely on the contractor to see that the work is carried out safely, both so far as the contractor’s workmen are concerned and others, including his own employees or members of the public; and he cannot be expected to supervise them to see that they are applying the necessary safety precautions. It may not be reasonably practicable for him to do other than rely on the independent contractor.
But there are cases where it is reasonably practicable for the employer to give instructions how the work is to be done and what safety measures are to be taken …
The question of what is reasonably practicable is a matter of fact and degree in each case.”
The Court of Appeal acquitted Laing O’Rourke as there was nothing to indicate to it, prior to the accident, that the dongas were unsuitable for use as a safe refuge during a cyclone. There was nothing to suggest to a reasonable employer that it should have appreciated or foreseen that the accommodation was not properly designed and built to withstand the weather conditions of a cyclone. The dongas had been built for a reputable and competent organisation with good quality control and had met the requirements of the local authority, including in relation to building standards for cyclone-affected areas. Laing O’Rourke was a construction engineer but not a structural engineer. It did not have the expertise to assess the suitability of the dongas for cyclonic conditions. There was no evidence that even if they had enquired about the construction of the dongas, they would have been told anything other than that they had been constructed in accordance with plans and specifications approved by the Shire and applicable building standards. There was no evidence that Laing O’Rourke could have inspected the dongas before occupying the residential camp.
Another case involved the same cyclone and the same dongas. This was Kirwin v The Pilbara Infrastructure Pty Ltd [2012] WASC 99. Many of the authorities considered in Laing O*’*Rourke were again recited. The Pilbara Infrastructure Pty Ltd was in a different position to Laing O’Rourke, because it was a principal, and it had entered into a contract for the construction of the dongas.
In Pilbara Infrastructure Justice Hall said at [108]:
“It is useful to note in this context that the fact of making assumptions is not itself inappropriate; it is the circumstances in which any such assumptions are made that may be relevant in determining whether an employer or principal has done all that is reasonably practicable in the circumstances. It is unlikely to be enough for a person to merely assume that someone else will attend to safety requirements, but if such an assumption is based upon inquiries made, assurances given, a reasonable belief as to the skills of those responsible for construction and a reasonable belief that regulatory approval has been obtained for the buildings, it may be well-founded.”
(Emphasis added)
“The duties of the respondents in the present case cannot be equated with the appellant in Laing O’Rourke v Kirwin. As I have noted, the respondents contracted to have RV1 constructed. This meant that they had some level of control over what was built and who built it. Since RV1 was always intended to accommodate workers and to provide a safe refuge for them, there was a duty to ensure that, so far as was reasonably practicable, the camp was built in such a way as to guard against risks of harm. Whether that duty was breached depends upon an assessment of the circumstances pertaining to the respondents.”
(Emphasis added)
The following principles can be extracted from these cases:
The legislation imposes a duty on a PCBU not only to do what is reasonably practicable to ensure safety, but to take reasonable care that contractors whose assistance is necessary do not expose workers to hazards.
A PCBU can call upon expertise which it does not itself have, and its own lack of expertise (if any) and the expertise of the independent contractor must be taken into account.
If the task is one which demonstrably falls outside the expertise of the PCBU, and if it appears that the independent contractor has been carefully and safely performing its work, then it would ordinarily be difficult to conclude that the PCBU has breached the duties imposed upon it by the legislation; it would not, in circumstances of that kind, ordinarily have been practicable for the PCBU to have done more.
The court must look at the facts of each case, not with the benefit of hindsight, nor with the wisdom of Solomon, but remembering that one of the chief responsibilities of the PCBU is the safety of those who work for it.
The question of control over the contractor is relevant to the determination of what is reasonably practicable.
If a PCBU engages a person who has the skill and expertise, including knowledge of appropriate safety precautions which the PCBU itself may not have, the PCBU may be entitled to rely on the contractor to see that the work is carried out safely.
However, there are cases where it is reasonably practicable for the employer to give instructions how the work is to be done and what safety measures are to be taken.
It is unlikely to be enough for a person to merely assume that someone else will attend to safety requirements, but if such an assumption is based upon inquiries made, assurances given, and a reasonable belief as to the skills of the contractor, it may be well-founded.
The question of what is reasonably practicable is a matter of fact and degree in each case.
In considering the duty to be imposed upon a principal contractor, it is necessary to keep in mind s 16 of the WHS Act which provides that more than one person can have a duty and that each duty holder must comply with that duty to the standard required by the Act, even if another duty holder has the same duty. Section 16(3)(b) requires the court to consider “the extent to which the person has the capacity to influence and control the matter”.
Because the question of what is reasonably practicable in the context of a principal and a contractor with specialised skill is a matter of fact and degree, I will defer further consideration of the duties of Boral until after I have recorded my findings of fact later in this judgment.
It is noted at this stage that Boral did engage Beumer as a specialist contractor – it was the manufacturer of EL13 and Mr Gill from Beumer was the “subject matter expert”. However, Beumer was not engaged to perform the work on EL13. It was engaged to provide advice on how to safely do the work. That advice was available to Boral, Nepean and Fenner.
The legal issues to be determined are:
Did Boral fail to comply with its health and safety duty by failing to take the steps particularised in par 13 of the Amended Summons? For reasons set out below, my answer to this question is yes.
If so, was Boral’s breach of duty a significant or substantial cause of the workers being exposed to the pleaded risk? For reasons set out below, my answer to this question is yes.
Are the acts or omissions of Nepean or Fenner to be attributed to Boral for the purposes of s 244 of the WHS Act? For reasons set out below, my answer to this question is no.
The Boral Cement Facility was a large industrial site with many component buildings and machines. Part of the site was a large seven storey structure known as the preheater tower. Part of the preheater tower was bucket elevator EL13. The elevator was encased in a metal chute. It comprised a continuous conveyor belt which ran in a loop from a top pulley on Level 7 to a tail pulley at ground level (in the “boot” of the elevator) and back up again.
Attached to the conveyor belt were 244 buckets each of which weighed 29 kilograms. Raw material used in the production of cement and related products entered the chute at ground level. As the belt rotated, the ascending side of the belt moved from the tail pulley and took the material in the buckets up to the top level. At that point the material was discharged to be used in the manufacture of products. The belt then continued to move over the head pulley and the descending side of the belt carried the empty buckets down to the boot to be filled up once again and taken up to Level 7.
The drive mechanism for EL13 was situated on Level 7. An electric motor provided rotational power to turn the head pulley and thus move the belt with the buckets attached. This electric motor was connected to a Voith Fluid Coupling. The rotational power which passed through the fluid coupling then went to a gearbox. From the gearbox the rotational power was transmitted to a fixed coupling attached to the head pulley. By this arrangement, the considerable rotational energy generated by the electric motor was smoothly transmitted through the fluid coupling into the gearbox and through the gear mechanism, the head pulley was rotated at an appropriate speed to move the belt with the buckets attached.
In addition there was also, attached to the gearbox, an auxiliary motor (also described in the evidence as a pony motor, an inching motor or a barring motor). This could be used to turn the head pulley at one-tenth the speed of its normal number of rotations, for the purpose of carrying out maintenance. The intended purpose of the auxiliary motor was to turn the head pulley at a very slow speed, so that the belt could be rotated for short distances for maintenance purposes.
From this description of EL13, it can be understood that in normal operation the ascending side of the belt was much heavier than the descending side of the belt, because on the ascending side of the belt the buckets were full of product, and on the descending side of the belt the buckets were empty. To guard against the risk of the belt running backwards because of this imbalance in mass (for example, if it lost power), EL13 was fitted with an anti-rollback device, also known as a “sprag clutch holdback” mechanism. This device, which was part of the gearbox, prevented the belt from rotating backwards. The sprag clutch did not prevent the belt running forwards, i.e. in its normal direction of rotation.
There was no evidence that there was a brake of any sort on the auxiliary motor, although there was reference in the evidence to conversations alleged to have occurred concerning an “inch brake”. It was an agreed matter that there was no evidence of EL13 having an inch brake, which would hold the belt, or stop it rotating in its forward direction while the auxiliary motor was turning the belt.
In summary, when a new belt was installed on EL13 on 13 February 2022, the belt was lifted into the chute with some, but not all, buckets attached to it. All of the buckets which were attached were clustered around the head pulley, equally spaced on both sides of it. There was no dispute on the evidence that these buckets should have been spaced evenly around the new belt, so that the masses on both sides of the belt were equal. When the auxiliary motor was turned on, the buckets in the ascending side of the belt started to move over the head pulley and down the descending side of the belt. The mass on the descending side thus exceeded the mass on the ascending side and through gravity the belt started free running out of control. The descending side of the belt rapidly moved over the head pulley and plunged to the bottom of EL13.
Instead of the auxiliary motor driving the belt at a slow speed over the pulley, the kinetic energy in the fast rotating pulley fed back into the gear box, turning it at a rapid speed. In turn this spun the fluid coupling at a speed many times more than its designated safe operating limit. The fluid coupling exploded, sending shrapnel and hot oil in the direction of the workers on Level 7. Mr Bennett was struck by the exploding metal and suffered his injuries.
The sequence of events which led to the incident is considered in more detail below.
In February 2021 Mr Marty Patterson from Nepean met with Mr Mick Davis from Boral to discuss whether Boral could engage Nepean to provide “site services”. In an email dated 25 February 2021 (DX 1) from Mr Patterson to Mr Davis, Mr Patterson referred to the meeting and asked whether it would be possible to get some Nepean workers inducted to Boral sites “so we could be ready to go”.
That email attached some documents concerning the capabilities of Nepean and the rates which it charged. In the colour brochure attached by Mr Patterson, Nepean described itself as “the most trusted partner in high value, innovative and sustainable engineering solutions”. The brochure offered services including engineering design and project management; design and manufacture of special purpose machinery; heavy to light complex fabrication; precision machining, manufacturing of moulds and press tools. The brochure referred to Nepean being in business for over 45 years and having over 50,000 square metres of high-tech manufacturing space suited to delivering complex projects. Areas in which Nepean claimed expertise included precision manufacturing, mining and earth moving, infrastructure and civil works, pharmaceutical, scientific, aerospace and defence. A map of the world showed Nepean having business locations on every continent, including at four locations in Australia.
The schedule of rates which was an attachment to the email referred to the engineering services which Nepean provided, which included “OEM Equipment overhauls”.
The third attachment to the email sets out pictures of Nepean equipment and a description of that equipment. The slideshow also includes photographs of past projects, being large jobs done in heavy industry.
That material alone is sufficient for me to reject one of the submissions made by SafeWork, which was that Nepean was engaged as a “labour-hire” company. The submission was not developed to any great extent, but it is plain from the services offered by Nepean and accepted by Boral that it was much, much more than a provider of workers. Further, Mr Patterson, the senior Nepean man on the job, agreed in cross-examination (discussed below) that Nepean was engaged not as a labour-hire company, but because of its engineering and industrial expertise.
Contact continued between Mr Patterson and Mr Davis with a view to Nepean obtaining work from Boral. In a chain of emails concluding on 11 November 2021, there was discussion between Mr Davis and Mr Patterson about arranging Boral site inductions for Nepean employees (DX 2).
By an email dated 12 November 2021 (DX 3) Mr Davis indicated to Mr Patterson that he would “get the ball rolling in regards to a contract with Boral”. On 25 November 2021 a contract was executed. This is dealt with below.
On 7 February 2022 (DX 4) Mr Patterson provided to Mr Davis the names, phone numbers and email addresses of himself and eight other Nepean employees. Most of the people nominated in that email ended up working on the EL13 job.
On 25 November 2021 Boral Construction Materials Limited entered into a procurement agreement with Nepean for “the provision of engineering and fabrication services” (PX 2, tab 19). The agreement was to commence on 1 December 2021 for a term of two years.
Clause 2.1 in Part B of the agreement dealt with a scope of services to be provided. Boral could request Nepean to perform engineering and fabrication services including but not limited to: planned and breakdown repair and maintenance services; improvement and modification services; shutdown services; machining services; layout and design services; and project management services.
By cl 2.4 of Part B Nepean was to supply all specialised equipment. By cl 2.5 Nepean was to supply all consumables and personal protective equipment (PPE).
By cl 2.6(c) of Part B Nepean had to ensure that its personnel informed Boral of any safety or operational issues at the earliest instance.
Clause 2.7 of Part B required Nepean and its personnel to inspect for hazards and recognize potential unsafe situations, and to perform work safely.
Clause 2.8 of Part B provided that Nepean had to comply with all relevant Boral policies and procedures, and that any high risk activities had to be conducted “in accordance with the relevant Boral procedure” (emphasis added). The list of high risk activities and the relevant Boral procedures included “Authority to Work Operation-GRP-HSEQ-6-01”.
Clause 3 of Part B dealt with pricing. It set out the hourly rates for various Nepean employees, including engineers, supervisors, leading hands and trades.
Part C set out the general terms and conditions. This included the following:
“4. Compliance including OHS requirements.
4.1 The Supplier must, and must ensure, that its Personnel:
(a) comply with all Applicable Law;
…
(c) comply with all applicable Boral Group policies and procedures (including those relating to the environment, health and safety and drug and alcohol testing) and all other reasonable directions given by Boral Personnel in relation to the performance of their Supplier’s obligations pursuant to this agreement;
…” (Emphasis added)
By cl 4.2 of Part C Nepean agreed to undertake and document an assessment of the risks associated with the provision of the services and the way in which those risks would be mitigated before commencement of the provision of services. Nepean was obliged to take all steps necessary to address any issues identified in such assessment “including those reasonably requested by Boral”. (Emphasis added)
Clause 16 of Part C was headed ‘Independent Contractor and Payment of Entitlements’. Clause 16.1 provided:
“Both parties acknowledge that the Supplier is Boral’s independent contractor and not Boral’s employee or agent.” (Emphasis added)
“The Supplier has no authority to bind Boral to any contract or to hold itself out in any way to bind Boral, beyond any written authority levels granted to the Supplier by Boral.” (Emphasis added)
“Replace belt on EL13-KS22
Workorder: 604565
Requested by: Michael Davis”
Mr Chris Jansen was a project manager and mechanical engineer employed by Nepean at the time of the incident. In his CV (PX2, Tab 29) Mr Jansen described Nepean as “[p]roviding full engineering service to the mining, manufacturing, infrastructure, scientific, defence, aerospace, and pharmaceutical sectors.” He listed a number of key projects on which he had been engaged while working with Nepean. All were major industrial projects.
Mr Patterson provided a short CV describing himself as a “Senior Site Supervisor” (PX2, Tab 29B). That document described Mr Patterson as an experienced site supervisor with extensive experience in management of onsite projects, including project management, site crew supervision and commissioning of small to large projects. He was a qualified boiler maker and welder by trade and had been a site supervisor and manager in heavy construction for 32 years.
Mr Bryan Felix was a boilermaker and sheet metal worker who finished his apprenticeship in about 2012. He had worked on a wide variety of projects including pipe work, welding and fabricating. Mr Felix was the leading hand at the EL13 job, working under the supervision of Mr Patterson. He said that as the leading hand he was a senior tradesman, who would give directions to other workers if needed. A lot of his previous work had been for BlueScope doing upgrades and repairs on structures. He had worked on conveyors and flooring which needed replacing.
Mr Daniel Bevan worked for Nepean as a boilermaker, performing welding, metal fabrication and site work. He had a list of tickets including rigging, dogging, crane and elevated work platforms. He had a Certificate in Metal Engineering.
Mr Brendan Slater was employed by Nepean as a boilermaker, performing industrial maintenance, welding, fabrication and rigging.
These were the five Nepean witnesses who gave evidence. All were appropriately qualified and had significant experience in industrial engineering. That short overview of the Nepean workers on EL13 is a clear demonstration that this is not a labour hire case.
Mr Bennett was the Fenner employee who worked on EL13. He was a specialist conveyor belt technician. Mr Bennett was engaged to perform the splicing of the two ends of the new conveyor belt. This involved making a temporary join when the two ends were at the bottom of EL13, at the tail pulley. The intention was that the belt would then be rotated so that the temporary join was moved up to the head pulley, where, on the day after the incident, it was intended that Mr Bennett would perform a hot join of the two ends, which would be a permanent join.
Fenner entered into a procurement agreement with Boral Shared Business Services Pty Ltd, which was in precisely the same terms as the agreement with Nepean (PX 9, Tab 85). The term of that agreement was extended (PX 9, Tab 86), and extended again to 1 May 2022 (PX 9, Tab 87).
Boral Shared Business Services Pty Ltd issued a Purchase Order to Fenner dated 28 January 2022 relating to belt maintenance (PX9, Tab 97).
Fenner was a company which claimed expertise in “engineered conveyor solutions”. It had an extensive documentary safety system (PX 9, Tabs 99A, 99B, 99C, 104, 105). Neither Boral nor Nepean had the necessary expertise in joining the two ends of the conveyor belt.
This material is a further demonstration, should it be required, that this is not a labour hire case.
Beumer was engaged by Boral to provide online support and advice to the crew doing the EL13 belt replacement, through its engineer Mr Jack Gill. Mr Gill had decades of experience working with conveyors and elevators, and had held many positions with Beumer both in Australia and overseas. As previously recited, Beumer was the OEM of EL13. Mr Gill was unable to leave Victoria because of COVID restrictions, and thus his support was provided online, mainly by means of a WhatsApp group chat. Mr Gill provided technical documents and drawings, and a manual, to assist the Nepean crew in replacing the belt and the buckets on EL13.
Beumer invoiced Boral on 1 March 2022 (PX 2, Tab 22) for the hours spent by Mr Gill on the task of “Belt Installation – Remote Support”. Beumer billed Boral for four hours on 10 February 2022 and four hours on 13 February 2022. Beumer also billed for another 18 hours of Mr Gill’s time, which related to the recovery operation on EL13 conducted on 26, 27 and 28 February 2022.
Boral Group Model Protocol document GRP-HSCQ-MP-1-03 (PX 8, Tab 65) deals with “Risk Management”. The purpose of the document is to “provide a framework methodology to systematically identify, assess and control HSEQ risks”.
Paragraph 3.1 of the document says that the risk management framework requires Boral to:
Identify hazards
Assess risks if necessary
Control risks
Review control measures
Paragraphs 3.1.1 of the document says that Boral must ensure that all reasonably foreseeable hazards will be identified. That must be achieved through specific, deliberate actions at various levels of the company. Hazards are to be identified by:
Hazard reports
Take FIVE
Safe Work Method Statements (SWMS)
Specific high risk OHS hazards (including working at height)
In relation to SWMS, par 3.1.1.3 says:
“A SWMS is required for any designated high risk activity, and is to be completed on HSCQ02-08-FO10F02 Safe Work Method Statements (SWMS) as required. A SWMS may also be developed for other activities and this will be determined through the Risk Profile.
Note: refer to the GRP-HSCQ-2-08 Safe Systems of Work (SSW) Standard for additional information on the requirement for use of Take Five and SWMS for assessing risk.”
“When a specific risk assessment is undertaken a minimum of two people must carry out an assessment on a task, equipment, process, plant, design or hazardous substance – one person must be a competent person (refer to GRP-HSEQ-2-03 Training, Competency and Awareness Standard) and the other person must be an HSE Representative or employee and/or other worker who is involved in the task. The Risk Assessment Team may also include other employees, workers and/or subject matter experts.”
Paragraph 3.1.2 of the document deals with “Assessing Risk”. It says “[a]fter a hazard has been identified, it is to be assessed for the level for risk using the Company Risk Matrix”.
Paragraph 3.1.2.1 of the document says that information to support a risk assessment should be used, including:
Current assessments from manufacturers or suppliers for plant, equipment or hazardous chemicals;
Previous incident or hazard reports relevant to the hazard for assessment.
Paragraph 3.1.3 deals with “Risk Controls”, and refers to the hierarchy of controls, a phrase which comes from cl 36 of the Regulation, set out above.
Paragraph 3.1.4 of the document deals with “Review of control measures” and requires the Operations/Site Manager or Supervisor to monitor and evaluate risk controls. This includes reviewing risk assessments when new hazards are identified or significant changes to plant, processes or people occur.
On p 8 of the document is a list of “Roles and Responsibilities”. The responsibility of “site management” is to “develop operation or site risk profile plans and programs”. The responsibility of employees and other workers is to “report hazards (and stop work where appropriate)” and “participate in risk assessments where required”.
Boral Group Model Protocol GRP-HSCQ-MP-2-02 deals with “communication and consultation” (PX 8, tab 66).
Paragraph 2.1 of the document says that consultation is to be used when there are changes which may affect the health or safety of employees, contractors, other workers or visitors, or have an impact on the environment. That consultation is to be facilitated by a discussion group, referred to as a “work group”. Paragraph 2.1.2 says that consultation is to be carried out between the relevant company stakeholders (such as management) and employees, contractors, other workers and their representatives.
Paragraph 2.3.6 of the document deals with “Toolbox Talks”. These are meetings to be held in addition to team meetings. Toolbox Talks should be held at the start of a shift or when change has occurred in the working environment. Attendance records must be kept for all Toolbox Talks.
As previously recited, the Boral Risk Management document (PX8, Tab 65) referred in turn to a document setting out requirements for a SWMS. This is the Boral Safe Systems of Work document BA-HSCQ-PRO-2-08 (PX 8, Tab 67). The document refers to controls for permit work, routine work and non-routine work.
Under the heading “General” par 2.08.10 provides as follows:
“Whilst an individual or a work crew is performing work and:
- the work conditions change, or
- additional hazard are identified, or
- it is a new work day/shift
Then the work must stop and an On the Job Assessment & Discussion is to be completed with all relevant workers, supervisors, and/or managers and any work document amended to reflect the change.” (Emphasis added)
“Safe Work Method Statements (SWMS) are a formal method of task-based risk assessments. As a minimum the SWMS must:
- Identify the work that is high risk;
- Specify hazards associated with the work and assess the risk, before and after controls have been identified;
- Describe the control methods to be implemented to eliminate or control the risks to as low as reasonably practicable (ALARP) and describe how those controls are to be implemented, monitored and reviewed;
- Be prepared by a team of at least two people, with one being trained in how to construct a SWMS, and the other that has an understanding and/or has the qualification to conduct the task at hand;
- Comply with legislation where applicable; and
- Be understandable to those who use it.”
Section 274 of the WHS Act provides that the Minister may approve a code of practice for the purposes of the WHS Act.
Section 275 of the WHS Act deals with the use of codes of practice in proceedings. Section 275 says:
275 Use of codes of practice in proceedings
(1) This section applies in a proceeding for an offence against this Act.
(2) An approved code of practice is admissible in the proceeding as evidence of whether or not a duty or obligation under this Act has been complied with.
(3) The court may—
(a) have regard to the code as evidence of what is known about a hazard or risk, risk assessment or risk control to which the code relates, and
(b) rely on the code in determining what is reasonably practicable in the circumstances to which the code relates.
Note.
See section 18 for the meaning of reasonably practicable.
(4) Nothing in this section prevents a person from introducing evidence of compliance with this Act in a manner that is different from the code but provides a standard of work health and safety that is equivalent to or higher than the standard required in the code.
“A safe and healthy workplace does not happen by chance or guesswork. You have to think about what could go wrong at your workplace and what the consequences could be. Then you must do whatever you can (in other words, whatever is ‘reasonably practicable’) to minimise health and safety risks arising from your business or undertaking.”
Section 1.2 of the Code says that this process is known as risk management and involves four steps:
Identify hazards
Assess risks, if necessary
Control risks
Review hazards and control measures to ensure they are working as planned.
Under the heading “Consulting Workers” the Code refers to s 47 and 48 of the WHS Act. It says that the duty to consult is based on the recognition that worker input and participation improves decision making about health and safety matters and assists in reducing work related injuries and disease.
The Code deals with “consulting, cooperating and coordinating activities for the duty holder” and refers to s 46 of the WHS Act. It says:
“Never assume that someone else is taking care of a health and safety matter. Find out who is doing what and work together with other duty holders in a cooperative and coordinated way so risks are eliminated or minimised as far as reasonably practicable.” (Emphasis added)
Section 2 of the Code deals with the identification of hazards. It provides examples of common hazards, including “gravity” arising from falling objects.
Section 2.1 of the Code deals with “How to find hazards”. This involves inspecting the workplace, consulting workers and reviewing available information, including information from a “technical specialist”. It notes that manufacturers and suppliers can also provide information about hazards and safety precautions, including instruction manuals.
Section 3 of the Code deals with “How to assess risks”. Section 3.1 says that a risk assessment should be done when there is uncertainty about how a hazard may result in injury; the work activity involves a number of different hazards and there is a lack of understanding about how the hazards may interact to produce new or greater risks; or changes in the workplace occur which may impact upon the effectiveness of control measures. It is emphasized that changes at the workplace should result in a new risk assessment being performed.
Section 3.2 of the Code deals with how to do a risk assessment. Section 4 of the Code deals with how to control risks. It sets out the well-known “hierarchy of control measures”. The Code points out that the WHS Regulation “makes it mandatory for duty holders to work through this hierarchy when managing certain risks.” The aim must be always to eliminate the risk. If this is not reasonably practicable, a PCBU must minimise the risk by working through other alternatives in the hierarchy.
Section 5 of the Code deals with how to review controls. It says:
“The control measures you, as a person conducting a business or undertaking (PCBU), put in place should be reviewed regularly to make sure they work as planned. Don’t wait until something goes wrong.” (Emphasis added)
Section 5 says that a review is required, inter alia, before a change at the workplace that is likely to give rise to a new or different health and safety risk that the control measure may not effectively control.
Section 6 of the Code requires the keeping of records of the risk management process to demonstrate that there has been compliance with the WHS Act and the WHS Regulation.
This Code (PX10, Tab 110) is also an approved Code of Practice under s 274 of the WHS Act. It provides practical guidance on how to achieve the standards of work health and safety required under the WHS Act and the WHS Regulation and effective ways to identify and manage risks.
Section 1.1 of the Code defines “plant” to include machinery and equipment, and specifically mentions conveyors. That section says that plant “is a major cause of work-related death and injury in Australian workplaces”.
Section 1.2 of the Code deals with “Who has health and safety duties for plant in the workplace”. This section says that there are a number of duty holders who have a role in managing the risks of plant in the workplace, including PCBUs and installers. A person can have more than one duty and more than one person can have the same duty at the same time. Early consultation and identification of risks can allow for more options to eliminate or minimise risks and reduce the associated costs.
Section 1.3 of the Code deals with “What is involved in managing risks associated with plant?”. Section 1.3 refers to the “systematic process” requiring:
Identification of hazards
Assessment of risks
Elimination of risks so far as is reasonably practicable
Controlling risks if it is not reasonably practicable to eliminate the risk
Reviewing control measures to ensure they are working as planned.
The section refers to s 46 of the WHS Act, dealing with the duty to consult with other duty holders. Examples given include where:
The PCBU engages workers to carry out work
The PCBU directs or influences workers in carrying out work
Other persons may be put at risk from work carried out in their business or undertaking
The PCBU manages or controls a workplace or the fixtures, fittings or plant at a workplace
The PCBU’s business or undertaking involves installing, constructing or commissioning plant or structures in a workplace.
Section 2 of the Code deals with the risk management process. Section 2.1 deals with “Identifying the hazards” and says that information about hazards, risks and control measures relating to plant at the workplace can be obtained, inter alia, from manufacturers or suppliers of the plant; or specialists, for example engineers.
Sections 2.2 and 2.3 of the Code deal with assessing the risks and controlling the risks, and refer to the well-known hierarchy of control measures.
This is also an approved Code under s 274 of the WHS Act (PX 10, Tab 111). It provides practical guidance on how to effectively consult with workers who carry out work for the business or undertaking and who are directly affected by health and safety matters. It provides guidance to PCBUs who share responsibility for the same work and health and safety matter on how to consult, cooperate and coordinate activities with each other.
Section 1 of the Code refers to s 47 of the WHS Act dealing with a duty to consult workers and s 46 of the WHS Act dealing with a duty to consult with other duty holders.
Section 1.2 of the Code deals with “Why is consultation important?”. It points out that gaps in managing health and safety risks occur when **“**duty holders assume someone else is taking care of the health and safety matter”. (Emphasis added)
Section 5 of the Code refers to s 16 of the WHS Act, which provides that more than one person can have a duty, and s 46 of the WHS Act, which says that there is a duty to consult with other duty holders. The Code says:
“People often assume someone else is going to take action for health and safety, perhaps because the other person is more directly involved in the activity. This may be more likely where there are numerous people involved in the work. This can mean nobody takes the necessary action.”
This section also says that a PCBU “may ensure the outcomes by not necessarily taking the required action yourself, but by making sure another person is doing so.”
Section 6 of the Code says that effective consultation with other duty holders requires identification of hazards, assessment of risks, controlling of risks and review of control measures.
Other safety publications and literature that were available to Boral before the incident were tendered (PX 11, Tabs 112 – 123).
Behind Tab 112 is a WorkCover NSW document titled “*!*Hazpak Making Your Workplace Safer: A Practical Guide to Basic Risk Management” dated 1996. This has been superseded by the SafeWork Code of Practice: How to manage work health and safety risks, August 2019 (PX 11, Tab 109).
Behind Tab 113 is an article from Creamer Media’s Mining Weekly titled “Reverse running on inclined conveyors prevented” dated 29 May 2015. The article says that sprag clutch holdbacks can instantaneously prevent any runback of a conveyor. It outlines the risks associated with a conveyor reverse running, which include the exploding of a fluid coupling and the overloading of drivetrain components.
Behind Tab 114 is a United States Department of Labor Mine Safety and Health Administration Metal and Nonmetal Mine Safety and Health Report of Investigation for “Surface Nonmetal Mine (Cement) Fatal Machinery Incident” dated 3 June 2002. The report considers an incident where a catastrophic failure of a component caused a bucket conveyor to overspeed in the reverse direction and send metal fragments flying towards a worker who was fatally injured.
Behind Tab 115 is an extract from the Renold website titled “SH Series Sprag Clutch Holdbacks”. The extract sets out features and applications of a sprag clutch holdback including the prevention of any runback of a conveyor.
Behind Tab 116 is a Safequarry Incident Report titled “Sudden Fluid Coupling Failure” dated 3 September 2012. It refers to an incident where an automatic shaft brake failed to hold the weight of an unbalanced load on a cement mill causing the mill to turn in the reverse direction. The fluid coupling went into overspeed and subsequently failed resulting in fragments being ejected into the surrounding area at speed.
Behind Tab 117 is an extract from MRO Canada’s Maintenance Voice titled “Understanding Coupling Failures” dated 1 December 2008. It covers reasons why fluid couplings fail, which includes by running at excessive speeds.
Behind Tab 118 is the Voith “Installation and Operating Manual” version 11 dated 10 July 2017 and other Voith documents. The manual deals with the risk of explosion if the coupling runs at a speed exceeding the rated speed. It provides that “it is mandatory to observe the maximum permissible speed!” (p 3317). The manual says a device that prevents overspeed (eg brake or backstop) should be provided on machines on which overspeed is possible (p 3335) and that the entire system should be checked to see if it is equipped with such a device (p 3281). It also states that overspeed can cause damage to the coupling (p 3281), that high temperature of the coupling is an explosion hazard (p 3286) and that operating fluid that sprays off the coupling can cause serious injury (pp 3282, 3323).
Behind Tab 119 is a document from the International Materials Handling Conference – Beltcon 8, Johannesburg, 1995 titled “Incline Conveyors: The Importance of T2 Take-Up Tension to Stop Runback”. The document was referenced in a bulk-online forum titled “Reasons For Fluid Coupling Damage*?*” which is also behind Tab 119. The document deals with four case studies of incidents of conveyor runback. It observes that conveyor runback can cause the fluid coupling to accelerate in reverse to excessive speeds, which can result in damage to the fluid coupling and the expulsion of debris and fluid. It says that conveyor runback can cause immense damage and fatalities.
Behind Tab 120 are forum posts between September 2011 and December 2012 from an online forum titled “Fluid Couplings Blasted”. The forum posts discuss an incident where a conveyor went into runback and the fluid coupling exploded. Members of the forum discuss potential issues including the possibility of a severe overspeed event. Members also discuss their own experiences with similar incidents.
Behind Tab 121 is an article published in the Engineering and Mining Journal titled “Stored Energy in Conveyor Belts – Managing the Risk” by Larry Goldbeck dated December 2006. The article deals with managing stored energy in conveyor belts. It points out that “[t]he weight of the belt alone can make the belt travel forward or backwards”. Brakes and backstops can prevent runback situations but should not be relied upon to prevent the belt from moving on its own. To prevent a belt from moving under its own power it should be physically restrained or blocked. It states that “the belt may move in either direction based on the conditions present” and these conditions can change as work progresses.
Behind Tab 122 is a Safety Alert from Resources Safety and Health Queensland titled “Unplanned movement of conveyor belt” dated 20 December 2021. The alert summarises an incident where a conveyor belt slipped through a belt clamp and travelled approximately 300 metres during belt retraction works. It sets out the causes of the incident, key issues and recommendations to prevent a reoccurrence of the incident.
Behind Tab 123 is a Safety Alert from the U.S. Department of Labour Mine Safety & Health Administration titled “Working in Proximity to Belt Conveyors”. The alert deals with best practices during belt conveyor maintenance. Stored gravitational energy must be isolated and controlled. This includes blocking the conveyor to prevent movement in either direction.
Mr Ragg has been employed by Boral Cement for 32 years and was a plant attendant at the time of the incident. His supervisor was Mr Paul Smith. Mr Ragg was aware that work was being done on EL13 but he was not involved in planning that work. He was not involved in any risk assessments or toolbox meetings about the work being done on EL13.
On 13 February 2022 Mr Ragg was with another Boral employee Mr Daniel Burgess. He received a radio call from Mr Smith. Mr Smith asked them to come to the Authority To Work (ATW) room. Mr Ragg and Mr Burgess went to the ATW room, where Mr Smith told them that EL13 had to be barred into position so that it could be set up for work to be done on the next day. The job of “barring into position” means slowly inching the conveyor belt by means of an auxiliary motor, which Mr Ragg also called a “pony motor”. He said that this smaller motor enables the conveyor belt to move slowly so that it can be positioned just where it is required for work to be done on it.
Mr Ragg said that the ATW room was a workroom where contractors and workers went to fill out their ATW forms, which they had to do before each job. Mr Smith told Mr Ragg and Mr Burgess to go to EL13 and see the crew working up there. That crew had to come to the ATW room and take their locks off, so that a lock board could be opened and a key could be obtained to de-isolate the barring drive. Mr Ragg asked Mr Smith what the job was on EL13, but he was told “you would have to talk to the work crew and find out off them what the job was”.
On the afternoon of 13 February 2022 Mr Ragg saw Mr Mick Davis come out of the ATW room after speaking with Mr Smith in relation to getting the EL13 job done. Mr Ragg understood that Mr Davis was the “maintenance manager”. Mr Davis said to Mr Ragg, “I’ve just let Paul know what the job is”. This occurred at about 4 o’clock in the afternoon.
Mr Ragg and Mr Burgess went to EL13, met the work crew and went back up to level 7 with them. Mr Ragg was told that a join had to be made in the elevator belt and that the belt had to be moved so that it could be set up for this join to be done the next morning (Monday 14 February). Mr Ragg had previously done barring on EL13. He understood that the crew were to do a “hot join” on the top of the belt, so they had to position the join dead centre at the top.
Mr Ragg unlocked the motor, meaning he de-isolated it. Mr Ragg did not know whether there was any sort of brake on the conveyor belt on EL13. He pushed the start button for the auxiliary motor. He said: “The pony motor started up, the belt started moving, and then within seconds it just went, it started screaming.” (Tcpt 18/25)
Mr Ragg said that people were running everywhere.
Mr Ragg was shown an Authority to Work Permit (PX 8, Tab 72). He said that the ATW permit gave the service provider and the work controller permission to give the crew the go ahead to work on a piece of equipment. He said that when a contractor entered the site, the first thing they had to do was to see a supervisor to fill out an ATW form. The ATW form at PX8, Tab 72 was the document he saw on the day of the incident.
Mr Ragg said that the work controller was in a management or supervisory role, looking after a particular job. The authorised plant controller was a shift supervisor who was running the ATW room at the time. He would authorise any plant to be isolated or de-isolated. Mr Ragg said that the authorised plant controller at the time was Mick Davis. He also said that the authorised plant controller was Paul Smith. (Tcpt 28/14-19)
Mr Ragg said that he did not have any knowledge prior to the incident of what would happen if the conveyor belt was unbalanced.
There was no cross-examination of Mr Ragg.
I formed the view that Mr Ragg was an accurate witness, except for his nomination of Mr Davis as the authorised plant controller. On the evidence, Mr Davis was the authorised work controller.
The ATW permit shown to Mr Ragg is in evidence at PX 8, Tab 72. It is a one-page document. A two-page version of the permit was also tendered in evidence at PX 8, Tab 73.
The first page of the document is headed “Authority to Work Permit HSEQ-06-01-F03”. The work is replacement of the belt on EL13 and the work group is Nepean Engineering/WGC Cranes. There are spaces for three persons to sign. The ATW permit is to be used to “when work needs centralised co-ordination because it is being done under a high risk permit”.
Under the heading “Authorised Work Controller”, Mr Davis has signed on 9 February 2022. Above his signature the recorded documentation is:
SWMS or Statement of Particulars (with risk assessment attached) provided – mandatory, and
Working at Heights Permit.
Mr Davis has signed underneath the following:
“Declaration;
1. The hazards associated with the planned work have been identified to me and appropriate control measures have been defined.
2. The work will be adequately supervised.
3. All the required permits and safety documentation have been prepared, approved and issued to the Service Provider.
4. The Service Provider has the required competency for the work.
5. The hazards and control measures have been communicated to the Service Provider.
6. The Authorised Plant Controller and Service Provider will be notified if any changes occur.”
“4. I have viewed the safety documentation associated with this permit and I am of the opinion that it is appropriate to allow work to commence.
…
6. The Authorised Work Controller shall be notified of any plant or process changes that may occur during the work.”
“1. I have read and understood the safety requirements listed within this authorisation and associated documents and will abide by them.
2. I shall ensure the authorisation and any accompanying information is handed over to each new shift.
3. I shall ensure, before work commences, that all relevant safety requirements of this permit have been communicated, understood and signed off during pre-start toolbox meetings (or similar) by the work crew – including but not limited to, safety risks and the control measures, for addressing those safety risks.
4. I shall notify the Authorised Work Controller of any changes which occurred during the work and will ensure that work stops if there is a material change to the scope of works, method of works, operational condition of plant, other external interfaces, the validity period of any permit expires or any other previously unidentified risk to safety is discovered.”
“A NEW ATW PERMIT MUST BE ISSUED IF THERE ARE ANY CHANGES TO THE FOLLOWING: 1. Scope of Works 2. Method of Works 3. Operational Condition of Plant 4. Other external interfaces 5. Any previously unidentified risk to safety is discovered 6. Validity period expires.”
The longer version (two pages) of the ATW Permit (PX 8, Tab 73), contains a second page. It was explained in evidence that if work is not completed within one day or one shift, then the next shift has to sign the second page which is headed “Authority to Work Permit Handover Sheet 014-F01.1”.
Under the heading “Authorised Work Controller” Mr Davis has signed on each subsequent day. He has thus signed on 9 February, 10 February, 11 February, 12 February and 13 February 2022.
One of the things Mr Davis signed to certify was:
“I am satisfied that there have been no changes in the hazards associated with the scope of work, since the work commenced.” (Emphasis added)
Under the heading “Authorised Plant Controller”, Mr Smith has signed on 9 February, 10 February, 12 February and 13 February 2022. Mr Crawford has signed on 11 February 2022.
Under the heading “Service Provider”, Mr Jansen has signed on 9 February 2022; Mr Felix has signed on 10 February, 11 February and 13 February 2022 and Mr Daniel Bevan has signed on 12 February 2022.
At this stage it is noted that while the method proposed for replacement of the belt on EL13 changed significantly, no new or additional ATW permit was ever sought or issued. In particular:
Mr Davis as the Authorised Work Controller, did not notify the Authorised Plant Controller and the Service Provider of any changes.
Mr Smith as the Authorised Plant Controller did not notify Mr Davis (Authorised Work Controller) of any plant or process changes that occurred during the work.
Nepean did not notify the Authorised Work Controller (Mr Davis) of any changes which occurred during the work and any change in the method of works.
Mr Burgess started working for Boral in July 2003. In February 2022 he was a plant attendant. Mr Burgess was instructed what to do during the course of his employment by the supervisor who ran the ATW room. As at 13 February 2022 this was Mr Smith. Mr Burgess was not involved in any planning of the work on EL13. He had never done a belt replacement, but he had previously helped “bump the elevator” so that buckets could be tightened up.
Mr Burgess was not aware of the procedure to be used to change the belt on EL13, he was not involved in the creation of any risk assessment and he was never given any documents concerning the job by Nepean or by Boral. It was Mr Ragg who was asked to run the bucket elevator that day, and Mr Burgess was there to assist him. Mr Burgess never saw a SWMS for the job and never took part in any toolbox talk for the work.
On the day of the incident it was Mr Ragg who de-isolated the auxiliary motor and started up the auxiliary drive. He said, “It ran and then picked up speed”. The Boral workers hit the stop button but it did not stop the belt. Everyone ran down the stairs.
Mr Burgess did not know one way or the other whether there was a brake attached to the conveyor belt.
There was no cross-examination of Mr Burgess.
I regard Mr Burgess as an accurate truthful witness.
On the day of the incident Mr Smith was employed by Boral as a shift superintendent. He ran the ATW office. The isolations for the plant at the site were kept in the ATW office. His role was as plant controller in the ATW office to indicate on the ATW permit that the work was isolated and safe to work on. That is a different position from being a work controller. Mr Smith said that a work controller works with the service provider “to go through the SWMS”. The work controller also goes through the risk assessments. If the work controller is satisfied with those documents they sign on. This was clearly Mr Davis.
Anyone working on the job who is from outside Boral is required to obtain an ATW permit. This has to be signed by the work controller and the plant controller. The keys to the padlocks to isolate and de-isolate the equipment are locked into a lock box in the ATW room. Locks are on the machinery to stop it being operated.
Mr Smith said that if the scope of work changed, everyone is supposed to fill in another ATW permit. If the way that the work is to be executed is changed, that has to be indicated on the ATW permit (Tcpt 72/43-50).
Mr Smith was asked whether, if there was a change to the planned work, what should happen in relation to documentation. He said:
“Well, the service provider and the work controller should do another risk assessment if they’re changing the scope of work or whatever and have a – a stop meeting and discuss it with all their workers.” (Tcpt 73/10-14) (Emphasis added)
Mr Smith said that if there was a change to the planned work, then “[y]ou might have to change the safe work method statement” (Tcpt 73/18).
Mr Smith was taken to the ATW Permit for the EL13 work (PX 8, Tab 72).
Mr Smith was asked whether he was notified of any change to the work. He said that he was told that they wanted to bar the elevator on the afternoon of 13 February 2022, but this was the only change notified to him. Mick Davis told him about this change (Tcpt 75/18).
Mr Smith was also taken to the two page version of the ATW Permit (PX 8, Tab 73, discussed above). He said that the two pages were part of the same document.
Mr Smith said that he saw the conveyor belt with buckets attached being lifted into the conveyor chute on 13 February 2022. He said, “It looked like it was going to be saddled over the top”. He said that it looked like there were an equal number of buckets on both sides. He did not remember seeing any buckets at the ends of the belt.
Mr Smith was asked if he knew whether or not there was a brake on EL13. He said that he didn’t think there was one.
There was no cross-examination of Mr Smith.
I regard Mr Smith as an accurate truthful witness.
Mr Latham worked for Boral for three and a half years until June 2022. Initially he was employed as the Work Health and Safety Manager for the cement business of Boral. He has a degree in chemical engineering. Prior to working for Boral, he had worked for BlueScope Steel, eventually being promoted to being the Global OHS governance manager.
In February 2022 the Boral plant was going through a shutdown so that maintenance could be performed. There were a large number of contractors on the site during the shutdown. There was industrial action going on with the regular workforce. The job on EL13 was put on the planning schedule one to two weeks before the commencement of the shutdown.
Mr Latham said that the shutdown manager was Mick Gauci, who was normally the maintenance manager for the plant. The shutdown coordinator was Mick Davis, who was Mick Gauci’s “righthand man”. Mr Latham described a belt and bucket change for a conveyor as “a moderately risky job”. He had seen bucket changes and conveyor belt changes at many sites. On previous occasions Mr Latham had seen the buckets being removed individually. The belt was then removed from the top using a crane and when it was repaired, all of the buckets would be individually put back on the belt through an access way.
Mr Latham said in his experience, if there was a change in the process of a job, the ATW controller should be contacted. He said that also alterations should be made to the SWMS if there was a change in the process of the job (Tcpt 110/29-35).
Mr Latham said that on his understanding there was a main motor to drive the belt and a smaller drive used for inching and barring. He said that the inching and barring process is the safest way to introduce some energy to allow some movement to complete a job. On the bucket elevator there was a “brake” to stop the belt running in reverse.
Mr Latham was shown an “HSEQ Alert” dated 13 February 2022 (the day of the incident). He said that this was a Health Safety Environment Quality Alert, issued as a result of the serious incident “to communicate to everyone that something serious has occurred, and ideally you have with it some learnings to promote people to have a look at their site ‘could this happen here’, and try to prevent such an incident from happening somewhere else” (Tcpt 112/9-17).
On the first page of the document, the person to contact for more information was Dean Beltrame, the Site Manager. Mr Latham said that Mr Beltrame was “the most senior manager on site”. Normally Mr Latham would have been involved in putting this document together, but for personal reasons he was away at the time.
Mr Latham was asked to read the document and he confirmed that he did not disagree with anything in it (Tcpt 113/30).
Mr Latham said that during the shutdown period, there were engineers who worked for Boral, who were available on mobile phones – Mr Charlesworth, Mr Beltrame and Mr Gauci. Even on a weekend, if those engineers were not rostered on site, they could be contacted by Boral.
There was no cross-examination of Mr Latham.
I regard Mr Latham as an accurate truthful witness.
At this point it is noted that Mr Latham, being a Boral engineer, was not asked by the prosecutor whether Mr Davis had ever approached him at the time of the incident to ask how an overspeed of the conveyor belt could be prevented.
“A bucket elevator belt in the pre-heater tower was being replaced by contractors during planned maintenance works. The process of removing and refitting the belt was changed during the course of the task, due to apparent limitations on the crane.
During the process of refitting the new belt, the belt began to move rapidly in an uncontrolled manner. The rapid movement of the belt appears to be related to an uneven distribution of bucket weight on the replaced belt. A failure of the fluid coupling occurred during the uncontrolled movement. Metal fragments were ejected from the fluid coupling, with some of those fragments contacting the back of the helmet on the head of a contract worker. The contract worker sustained a head injury and was transported to hospital.
The incident remains under review.”
Mr Charlesworth has been employed by Boral since July 2017 and worked at the New Berrima site. He is a mechanical and structural engineer. He had no involvement with or knowledge of the work to be undertaken in relation to EL13. He was not consulted about the work. After the incident he was involved in investigating the incident. He said that there was a technical failure of a coupling.
Mr Charlesworth was asked by Mr Beltrame to check through some calculations and assumptions that sought a root cause for the failure. He had past experience in the design of bucket elevators. Mr Charlesworth made some calculations in relation to the speed at which the fluid coupling must have been rotating at the time of the incident.
Mr Charlesworth initially estimated the speed at which the fluid coupling was rotating when it exploded was 15,000 rpm.
Mr Charlesworth consulted another engineer Mr Johnson, and rechecked his calculations. As a result of changing the figure for the height of the tower, he reduced his initial calculation of 15,000 rpm back to 13,000 rpm. This was eight times the normal design speed of 1,500 rpm.
There was no cross-examination of Mr Charlesworth.
I regard Mr Charlesworth as an accurate truthful witness.
At this point it is noted that Mr Charlesworth, being a Boral engineer, was not asked by the prosecutor whether Mr Davis had ever approached him at the time of the incident to ask how an overspeed of the conveyor belt could be prevented.
Mr Yadwad is now retired, but worked for Boral from 1992 onwards. At the time of the incident he was the National General Manager for the operations of Boral. Mr Beltrame was the operations manager for the New Berrima site. Mr Yadwad has a degree in engineering. He was in Sydney when the incident occurred and he visited the site the next day. He had no knowledge of any method used in the past to change the conveyor belt on an EL13.
In cross-examination Mr Yadwad said that Mr Davis, who was the shutdown coordinator, had oversight of the employees of Boral and their activities or relationship with contractors on the site. He said that where there are contractors on the site to do a specific task, they have their own employees on site supervising the work being undertaken by their specialist team (Tcpt 196/1-11).
I regard Mr Yadwad as an accurate truthful witness.
Mr Gauci is the holder of a mechanical engineering certificate. He commenced working for Boral at the Maldon Plant as a contract maintenance planner. He then worked at the Marulan Plant doing a similar job. He left and worked elsewhere, but then rejoined Boral as the national rail manager. He later became the maintenance manager at the New Berrima site. He took on this job in about 2019. Mr Gauci reported to Mr Beltrame who was the operations manager.
During the February 2022 shutdown at New Berrima, Mr Gauci was the shutdown manager, which involved managing and controlling the shutdown. Mr Davis held the position of project coordinator during the 2022 shutdown. This meant that Mr Davis was coordinating the various contractors to undertake works during the shutdown. He said that a shutdown is “a shutdown of a live piece of equipment to undertake maintenance activities and capital activities”.
Mr Gauci was not at the site at the time of the incident, having just driven off the site. He received a telephone call on the way home and he rang Mr Davis, who was also travelling away from the site. Mr Gauci said that during the shutdown if there was a query anyone could ask a Boral engineer a question by telephone.
Mr Gauci was asked whether, if a worker had a question about EL13 during the shutdown, they could contact an engineer. He said, “In that particular case it would have been the Beumer engineer”.
Mr Gauci was shown a “Position Profile” for the position of “Asset Planning Superintendent” (PX 8, Tab 82). He said that Mr Davis held that position. Mr Gauci said that during a shutdown it was part of the role of Mr Davis to manage contractors and to work towards improving contractor safety. He said that part of the role involved ensuring the provision of a safe working environment by ensuring adherence to the company’s occupational health, safety and environmental policies and procedures.
Mr Gauci was asked about CAD (Computer-Aided Design) drawings. He said that if CAD drawings were sent by a mobile phone, they could be shown on a large computer screen at the time of a shutdown, if necessary (Tcpt 615/10).
Mr Gauci said that Boral maintained both paper and electronic copies of maintenance and operation manuals. He recalled that EL13 had a Voith fluid coupling.
Mr Gauci was asked about Boral coordination meetings. He ran those meetings because he was the shutdown manager.
Mr Gauci recalled being told how the belt was going to be lifted back into the chute given that there was a problem with the crane, which could not lift the belt with all of the buckets high enough. He said that he was told that buckets would be put back on the belt, but the last section of the belt would be rolled up with no buckets on it, so that it could be lifted up high enough to be dropped into the chute. Mr Gauci knew that if you add an extension to a crane, that lowers the lift capacity of the crane. All of this was told to him by Mr Davis, who was the coordinator for the job (Tcpt 668/30-35).
Mr Gauci recalled that Mr Davis told him that they would have to roll the conveyor belt up, place the bucket elevator back in, then place the remainder of the buckets while the belt was in the housing of the conveyor (Tcpt 673/3-8).
In cross-examination Mr Gauci said that Mr Davis “was not a supervisor”. Mr Gauci said that between 300 and 450 contractors were on site during the shutdown in February 2022. The usual workforce at the New Berrima Plant was just under 100.
In cross-examination Mr Gauci agreed that it was Boral’s practice during the shutdown that the contractors had to complete a SWMS. He agreed that the SWMS that were completed by contractors had to be shown to the persons who were overseeing the Authority To Work permits. This was to ensure that the contractors had completed a SWMS (Tcpt 703/50-704/12).
I regard Mr Gauci as an accurate truthful witness.
At this point it is noted that Mr Gauci, being a Boral engineer, was not asked by the prosecutor whether Mr Davis had ever approached him at the time of the incident to ask how an overspeed of the conveyor belt could be prevented.
Mr Beltrame was employed by Boral and has a degree in mechanical engineering. At the time of the incident he was the operations manager for the New Berrima site. This was the most senior management role on site. He oversaw a workforce of about 100 full-time employees and from time to time, contractors. His role involved management of work health and safety issues at New Berrima.
The work controller for the work being done on EL13 in February 2022 was Mr Davis, who oversaw the coordination of the work on EL13. Mr Beltrame was not involved in scheduling the work on EL13, he was not involved in meetings relating to the job and he was not involved in checking any SWMS for the work on EL13.
Mr Beltrame did not become aware of any change in method in relation to putting the buckets back on EL13. He was aware that EL13 had an anti-runback mechanism, so that the belt could only move in a forward direction. There was a brake to prevent the belt running in a reverse direction.
There was no cross-examination of Mr Beltrame.
I regard Mr Beltrame as an accurate truthful witness.
At this point it is noted that Mr Beltrame, being a Boral engineer, was not asked by the prosecutor whether Mr Davis had ever approached him at the time of the incident to ask how an overspeed of the conveyor belt could be prevented.
Mr Davis commenced work with Boral in May 2008 and still works for Boral. During the February 2022 shutdown, he held the position of asset and planning superintendent. This involved the following:
Organising people for the shutdown
Engaging contractors to do specific jobs during the shutdown
Raising purchase orders on those contractors
Working as a planner to help plan some of those roles and jobs on the site for the shutdown
Normally contractors would be engaged for the January shutdown in June or July of the year before. Some of the lesser risk jobs would be finalised closer to the end of the year before the shutdown. Mr Davis was involved in organising equipment and spare parts. Mr Davis was not involved in week-to-week maintenance plans, but when there were major shutdowns, larger projects or more complex projects, he would be involved.
In relation to the work to be done in EL13 during the February 2022 shutdown, Mr Davis arranged for spare parts (being the belt, the fixing materials and the belt joining) to be available to contractors. He made sure that Boral had an expert who could be paired up with the contractors doing the work on EL13.
Mr Davis was taken to a “Position Profile” for the position of asset planning superintendent (PX 8, Tab 82). Inter alia, this said that one of the duties of the asset planning superintendent was to manage contractors and work towards improving contractor safety. Mr Davis said that working towards contractor safety was “absolutely” part of his duties (Tcpt 785/33).
The document also said that one of his duties was to ensure the provision of a safe working environment by ensuring adherence to the company’s occupational, health, safety and environmental policies and procedures. Mr Davis said that this was a requirement that everyone had to comply with.
Mr Davis was asked to explain what, in his experience in industry, should be done where there was a change during a work process. He said (Tcpt 790/1-8):
“A. If there was a change as you progressed through a planned job, the work parties were to stop and assess that change. They were to assess it for the risk that that change may have. So typically at the start of a job, a work crew would come together and develop a risk assessment on how that job’s to progress, and then if there’s a change in what they had planned, then they should stop and they should go back to that risk assessment and update it, so make amendments as required.”
“A. Yep. So quite often contractors will come to site, and in this case with Nepean, they had a pre-prepared risk assessment that was printed out, and it was all neat and tidy, and when they came to site, it was evident that, you know, it was pre-prepared. So a lot of the times we would then offer a blank one of ours to say we want to see handwritten notes. We want to see everyone’s input into this risk assessment. We don’t buy that it was done by a safety professional in the office before you got to site. We want youse to be doing it on the job every day, updating it. We want, you know, mud, dirt on it. We want to see that it’s an active tool.”
Mr Davis said that if a contractor used its own safety document, then this would be checked by Boral to see that it met the Boral standards. If it was not adequate, he would ask the contractor to do another one “similar to what we did with Nepean” (Tcpt 791/38).
Mr Davis said that in respect of the work on EL13, Jack Gill from Beumer was the “subject matter expert”. He said that he did not regard the Boral engineers as subject matter experts in relation to the work to be done on EL13. In any event, Mr Charlesworth had no input into any of the shutdown work at Berrima.
Mr Davis explained that each contractor was given a “job pack” which had documents such as a risk assessment, a SWMS and any other documentation needed by the contractor to use on the job. These were put in a plastic folder and kept by the contractor on the job site. He said (Tcpt 800/5-8):
“A. I had a responsibility to check that they’d performed a risk assessment prior to signing an ATW on for them. How they kept it, in the job pack or whatever form, was not a responsibility of Boral. It was their documentation to have on their job.”
Mr Davis said that he had been involved as a maintenance planner on several elevator replacements at the Maldon site (which was also a cement plant).
Mr Davis said that Nepean came on site on 9 February 2022 to start work on EL13. Mr Davis was the contact on site for Nepean. He caught up daily with Mr Patterson, who would call him if he needed anything. He said: “I try not to get too involved in their stuff and leave them to do their job”. He recalled dealing with Mr Jansen and Mr Felix from Nepean. Mr Davis introduced Mr Bennett from Fenner to Mr Patterson from Nepean. He said that Fenner was a company which manufactured conveyor belts and installed them on site. Part of the expertise of Fenner was in relation to joining the two ends of a conveyor belt together, which involved “belt clamping” or “belt splicing”. Mr Davis said that Nepean was going to do the belt clamping, but Nepean had access to Jack Gill who was a belt expert and access to Doug Bennett who had done several of these jobs in the past.
Mr Davis was asked about signing on to the ATW Permit on 9 February 2022 in relation to the EL13 work. He said (Tcpt 807/45-808/14):
“Q. Can you remember if you signed anything on 9 February 2022 about the EL13 work?
A. Yeah, yeah, I signed on the ATW to give them permission to start work, and I signed their SWMS to authorise that it was fit for use, which is a requirement to then go to the ATW step.
Q. Do you need the SWMS signed before you can go to ATW?
A. Not specifically, no, but you need a SWMS. You need to physically demonstrate that you’ve done a risk assessment before your work controller will be satisfied that he will allow you to start work.
Q. Is that a requirement each day from 9 through to 13 February 2022 if there was a change in the work process?
A. Not from my respect, no.
Q. Why not?
A. My role on the authority of the work is to make sure that they’ve got it at the start of the job, and then grant them permission to start work, and then any subsequent changes throughout that process is up to them as a work group to document and control themselves.”
In the same vein, Mr Davis said that it was not his role to inquire whether there was a new or updated risk assessment or SWMS, and that this was the responsibility of the crew doing the job.
Mr Davis was asked about the attempt to lift out the belt with all of the buckets attached, by crane, on 9 February 2022. He said that he witnessed it coming out. Mr Davis was aware that a second attempt was made after the belt was cut so that some of the belt and buckets remained inside the chute, and the portion of the belt and buckets which would clear the chute were lifted out. There was then a second lift to remove the remainder of the belt and buckets. Mr Davis said that he was aware of this change to the plan to lift out the belt and that he approved it (Tcpt 816/1-6). Mr Davis did not speak to any Boral engineer about this problem with the height of the crane. He did not tell Mr Gill that there had been a problem getting the EL13 belt and buckets out. He said, “It wasn’t sort of my role to tell Jack Gill that.”
At the suggestion of Mr Gill, Mr Davis set up a WhatsApp group so that Nepean, Fenner, Boral and Mr Gill could communicate about the job, given that Mr Gill was off site and restricted to Melbourne because of Covid protocols. Mr Davis, as part of this WhatsApp group, contributed comments and took photographs which he posted to WhatsApp. The contents of the WhatsApp group will be discussed more fully below.
Mr Davis said that in the days leading up to the start of the job there was a chat with Jack Gill (by Teams video) and Mr Gill had sent an email with some photographs of how the methodology had been used in the past on other sites, with a crane lifting the entire belt and buckets out of the chute and laying it on the ground so that the belt and some of the buckets could be replaced. This preliminary information from Mr Gill will be discussed more fully below. Besides the photographs, Mr Gill had also sent a conveyor manual and instructions in relation to the work.
Mr Davis was asked about a Nepean Job Safety Environment Analysis (JSEA) dated 9 February 2022 (PX 2, Tab 25). Mr Davis recalled reviewing this document and said to Nepean “That’s a great starting point, but I don’t like seeing generic things that are done in an office by someone. I want handwritten stuff on the job updated every day” (Tcpt 830/32). The JSEA was signed on p 10 by the Nepean work crew and by Mr Bennett. Mr Davis signed the JSEA as the “reviewer”. Mr Davis said that he wanted evidence that the document had been contributed to by everyone in the work group, and so he asked Nepean if they could do something that morning before they started the job.
Mr Davis was asked about a SWMS prepared by Nepean on a Boral template (PX 2, Tab 27). This document was handwritten and listed the steps which were to be taken to start the job on 9 February 2022. It went on in subsequent pages to list the steps which would be taken to remove the belt and buckets, install the new belt, and rotate the clamp to the top of the chute in order to join the two ends of the new belt. The document did not go past that step. The document was prepared by Mr Jansen and Mr Patterson from Nepean. Nepean workers, and Mr Bennett, signed off on the SWMS on 9 February 2022.
Mr Davis signed the document on 9 February 2022 under the following:
“Authorisation
I have checked this Safe Work Method Statement (SWMS) and confirm that it is authorised for use.
Person supervising the work:
(e.g. Manager, Supervisor, Team Leader, Leading Hand, etc).”
Mr Davis said that he was not present during the development of the SWMS and it was done by Nepean personnel. They developed it among their group and brought it back to him for review. He read it. At the time it was presented to him they had done steps 1 through 4. Mr Davis said that the SWMS was presented to him at the start of the job “to satisfy the requirement of an ATW that they had a risk assessment.” (Tcpt 832/27)
Mr Davis was asked, when the method of lifting out the old belt with the buckets was changed, whether he contacted Mr Gill to let him know that the lift out could not be done in the fashion advised by Mr Gill. He said that he did not speak to Mr Gill about this. He was asked why he did not speak to Mr Gill and his evidence was (Tcpt 834/1-10):
“Q. Why not?
A. I guess, I had a supervisor or a manager on that job that was running that job for me. So he was speaking with Jack Gill via the WhatsApp chat. He was coordinating it with Jack Gill.
Q. What was your role?
A. On that specific job?
Q. The lift back in?
A. I had no role in it. Marty Patterson was the supervisor of the job.”
“Q. Did you sign it on each of those days?
A. My signature, yeah.
Q. Why?
A. I reviewed the ATW and that at the start of each day when I came in to give the guys permission to start work.
Q. Did you review the SWMS each day?
A. No.
Q. Why not?
A. I don’t need to.
Q. Why not?
A. I need to know that they’re doing it. It’s their responsibility to review their SWMS.
Q. Are you saying in the positions you held, you had no responsibility to review the SWMS after 9 February?
A. I didn’t need to, no. I needed to review the SWMS to give them authorisation to start the job.”
At this stage it is noted that the SWMS was never updated when there was a change of process, being the lift out of the belt in two pieces. It was never updated when there was another change of process, being the installation of the belt with some but not all of the buckets attached to the new belt.
Mr Davis was asked about receiving the Beumer manual before the incident on 13 February 2022 and reading it. His attention was drawn to the fact that the method for changing the belt in the Beumer manual was to remove each bucket individually, leaving a completely empty old belt, winching the new belt on with the old belt, and then replacing each of the 229 buckets one at a time. Mr Davis was asked about using this method during a shutdown in early 2023 for belt and bucket work on EL16. The method described in the manual was used for that work.
At this point I note that I regard the method set out in the manual as a “red herring” in this case (this is relevant to particular 13(a) in the Amended Summons). Beumer was informed by Mr Davis, well before the work started, that because there was a large crane on site Mr Davis proposed that the crane lift out the belt with all of the buckets attached. Beumer approved of this method, said it had been done before, and sent photographs to assist Boral and Nepean in performing the work in that manner.
Mr Davis said that he was aware of an anti-runback device for EL13, which stopped the belt running in reverse. He said that a “sprag clutch holdback” was just a different name for the anti-runback device. The presence of an anti-runback device meant that if there was free running of the bucket elevator, it would be in the forward direction only. The device would stop the belt running in the reverse direction but not the forward direction. Mr Davis said that he provided no explanation to Nepean or Mr Bennett about the anti-runback device, saying that he provided them with the manual and the expert, but was not giving them direction on the job. He was not instructing them on the steps they needed to take to do the job.
Mr Davis acknowledged that once the barring drive was used, after clamps were taken off, there was nothing to stop an unintentional start up. He said that before the barring drive was turned on, the belt had its weight balanced over each side of the head drum. He knew before the incident that there were buckets on either side of the head drum and that the buckets did not go all the way down to the bottom of the legs of the new belt. He saw this (Tcpt 866/42).
Mr Davis acknowledged that he did not undertake a risk assessment for the work to be done on EL13, either before it started, or after there had been a change in the work method for the reinstallation of the belt and buckets on the head pulley. Such a risk assessment would have been done using the Boral matrix and risk assessment template. He never saw a Nepean risk assessment for this change in process and he never asked to see one.
Mr Davis said he observed the replacement of the buckets from one belt to another. He walked past that work being done when he did his rounds three times a day. He did see that the Nepean work crew had “doubled up the tails, to make it a shorter drop”. He saw that with his own eyes when they were lifting the belt up (Tcpt 912/8-20). In the witness box Mr Davis created a drawing of the belt as he saw it being lifted (PX 35). He watched the belt with the buckets attached to the top being lifted into the elevator chute, to the point where the belt had gone inside the casing. Mr Davis said that when the doubled-up section of the belt was inside the chute, the clamps were released and the tails dropped inside the casing. He could not say whether this was because he received a phone call or that he knew it because it was part of the plan he was aware of.
Mr Davis was asked about the warning given by Mr Gill, the subject matter expert, that “it may keep turning due to imbalance of buckets”. He said (Tcpt 929/6-8):
“Q. How was one going to risk manage, so that it did not keep turning due to imbalance of buckets?
A. That’s probably a question you should ask the guys that were doing the job.”
“Q. Did you assume that Nepean was taking care of the risks from the EL13 work?
A. It was their job, they conducted the risk assessment for their work crew.
Q. Did you find out what the risk managements were in place for the EL13 work on 13 February 2022?
A. No.
Q. Why not?
A. Because I didn’t cite [sic: sight] their SWMS. I cited [sic] it on the first day.”
“Q. Did that apply to the EL13 work from 9 to 13 February 2022 inclusive?
A. Yeah, my expectation was that if they ‑ if there was a change, that the work should stop, and the work crew should reassess that, and document it.
Q. And what about you, as a manager or supervisor for the work? As the authority to work controller.
A. I wouldn’t need to be there for that documented process to happen.
Q. Read the three pages to yourself. Tell me when you’ve finished doing so. And tell me if your answer is reflected in the three pages about safe systems of work, the Boral Australia protocol.
A. Yep.
Q. Your approach of leaving it to Nepean, and you not having any responsibility for doing the risk assessment and updated SWMS, is that found in this document?
A. No.”
Mr Davis said that he did not turn his mind to what might happen when the auxiliary motor was started, given that there were going to be more buckets in the descending strand compared to the ascending strand (Tcpt 958/40-50).
Mr Davis was asked whether he had any conversation with Mr Patterson before the incident in which Mr Patterson raised any concern about the balance of the buckets. He said that there was no such conversation. Mr Davis was asked whether he had any conversation with Mr Patterson before the incident about whether any part of EL13 could stop the belt rotating. He said that he had no conversation about this. Mr Davis was asked whether before the incident he had any conversation with Mr Patterson about an “inch brake”. He said there was no such conversation. He did not tell Mr Patterson that an inch brake would hold the belt. Mr Davis also denied that he said to Mr Patterson that the Boral engineers had said that the inch brake would hold the belt. These denials are critical, in examining a serious conflict between the recollections of Mr Davis and Mr Patterson on this topic. The evidence of Mr Patterson is discussed below.
I indicate at this stage, for reasons discussed below, that I accept and prefer the evidence of Mr Davis about this alleged conversation with Mr Patterson.
In cross-examination, Mr Davis was asked why he signed the Nepean SWMS as the person supervising the work. The necessity for Senior Counsel to ask about this matter arose from a comment which I made earlier in the trial, that the plain English meaning of the words above the signature, indicated that Mr Davis was the person supervising the work. That part of the cross-examination was as follows (Tcpt 1056/20-28):
“Q. When you signed the document as the person supervising the work, are you able to inform his Honour as to why you signed the document there?
A. Yeah, I signed that document in my capacity of representing Boral for the authorisation of this SWMS to allow Nepean to commence their work. So underneath where it says, “Authorisation” it says, “I’ve checked this SafeWork method statement and confirm that it’s authorised for use”. That’s where I signed. I didn’t sign with any intent to supervise the work. There was never any intent for me to supervise the work …”
On 5 February 2022 Mr Davis sent an email to Mr Faust of Beumer advising that Boral was planning to replace the EL13 belt. Mr Davis asked for “some detailed instructions on how to complete change out, along with the belt joining instructions” (PX 7, Tab 54, p 2034).
Beumer sent an email back to Mr Davis on 7 February 2022 with “attached pictures which are gathered when a belt complete with buckets was dismantled and new belt complete with new buckets was installed at once using drive pulley to hold total weight” (PX 7, Tab 54, p 2033). The attached photographs are reproduced at pp 2037 to 2045, although they are out of order. Put in proper order, the photographs show the following:
Secure the belt from unturn where clamping will be cut at bucket boot
Lift belt with bucket
Lift old belt with bucket
Lift old belt with bucket
Secure new belt with special lock tool
Lift new belt with bucket
Lift new belt with bucket
Installation of bucket.
The balance of the pictures concern reinstallation of buckets and instructions for splicing and clamping. The photographs show a belt complete with every bucket attached being lifted out of a chute by a large crane. The photographs then show a new belt with every bucket attached being lifted back into a chute using a large crane. This was the method proposed by Mr Davis, as Boral had a large crane on site for a number of tasks to be done during the shutdown. As it turned out, the crane on site did not have sufficient “stick height” to lift out the entire belt with every bucket attached. Nevertheless, if a crane had been able to lift out the belt with the buckets, Beumer was saying to Boral that that was a suitable way in which to do the change of the belt.
On 7 February 2022 Mr Davis sent a copy of the instructions and the pictures provided by Beumer, concerning the belt replacement by lifting the belt and buckets with a crane, to Mr Patterson (PX 7, Tab 54, p 2033).
This is the document seen by Mr Davis but in effect rejected by him as being too generic and not containing details for the particular work to be done. It is in evidence at PX 2, Tab 25. It sets out general maintenance, welding and hot work steps. While the job description is “Bucket & Belt change out”, there is nothing in the JSEA setting out the steps to be taken for that task.
As previously recited, the Nepean personnel and Mr Bennett have signed the JSEA and Mr Davis has signed as the reviewer. In his role as reviewer, Mr Davis said to Nepean that the document was not suitable to comply with the Boral safety system and not suitable as an appropriate risk assessment or SWMS for the EL13 work. Mr Davis requested a document created by the entire work crew, which had handwriting to indicate that every step had been discussed, and which had “dirt on it”.
This is the document (PX 2 Tab 27) created by Nepean on a Boral template to satisfy the requirement of Mr Davis for a proper risk assessment and a SWMS with dirt on it. The document is in handwriting. Who wrote on the document was explained by evidence given by Nepean personnel, which is referred to below. The document sets out steps in the task involved, the hazards involved, and the control measures taken to deal with the hazards. The SWMS starts with the first step of setting up the area. Step four is lifting the head roller and the belt and lowering them to the ground. At this stage it was contemplated that the entire belt and all of the buckets would be lifted out in one go by the crane. That did not happen. There is nothing written on the document to indicate that this step was ever reviewed, once the crane was unable to lift the entire belt and the work process changed.
The last step on the document is rotating the belt to the top of the chute so that the join could be done. Prior to this there was a step described as “lift head roller and belt to reinstall”. When that was written, it was assumed that the crane would be able to lift the belt and all of its buckets into the chute in one go. There is nothing on the document to indicate that the SWMS was reviewed or changed, once this important change to the work process had occurred.
The document was prepared by Mr Jansen on 9 February 2022 and Mr Patterson on 11 February 2022. It was signed off by all members of the Nepean work crew and by Mr Bennett. All of the signatures were placed on the document on 9 February 2022, indicating that while the document was created on this date before work started, there was never any revision of the document or a requirement for people to discuss or sign on to any amendment to the document. No amendment was made.
As previously recited, Mr Davis signed as the “person supervising the work”. I accept the explanation given by Mr Davis in cross-examination that he was never to physically supervise the work being done on EL13, and that this was the role taken by Mr Patterson. I am fortified in reaching that conclusion by the signature of Mr Davis appearing below the words “I have checked the Safe Work Method Statement (SWMS) and confirm that it is authorised for use”.
Against the background of the SWMS being approved, an ATW permit was issued by Mr Smith. I accept the explanation of Mr Davis that the reason he reviewed and signed the document, was that this SWMS was then authorised for use in obtaining an initial ATW permit to start work.
Once again, I note that there was never any change to the SWMS after 9 February 2022. When the time came on 13 February 2022 to lift the belt back in by a changed work process, the Codes of Practice and the Boral safety documentation required that there be a new risk assessment and a new SWMS created. This never happened. Nevertheless, an ATW permit was issued day by day for the work to continue, even though the problems with the lifting height of the crane had been apparent for some days.
Mr Davis created a WhatsApp group, so that there could be communication with Mr Gill, who was in Victoria and unable to travel to New Berrima because of Covid restrictions. The WhatsApp group consisted of Mr Davis, Mr Jansen, Mr Bennett, Mr Patterson and Mr Gill. The WhatsApp chat has been reproduced at PX 7, Tab 56. Reference to page numbers which follow are page numbers in PX 7, Tab 56. The group was given the name “EL13 belt replacement” (p 2047). The first pages of the chat concern drawings sent by Mr Gill to the group, largely concerning the clamping connection for the new belt (ie the join). Mr Gill wanted to be informed what was being done about this clamping, as a proper clamp was essential to Beumer for the purposes of providing a warranty in relation to the operation of the belt. These matters were covered in the chat between pp 2049 and 2066.
The crucial part of the WhatsApp chat, for the purposes of this case, is the exchanges which occurred on Sunday 13 February 2022, which commence at p 2066. Mr Gill said that he wanted photographs of the new belt with buckets and lifting (p 2066). Mr Davis replied that at this stage they were planning to lift in about an hour. Mr Gill said that some photos before the lift would be good for him to see any issues (p 2067). Mr Davis sent photographs of the belt lying on the ground before the lift. The photo sent at p 2067 and 2068 was not a photograph of the entire belt, but only part of the belt. The photograph appears to show buckets uniformly attached to the belt, with every visible bucket attached. The photograph does not extend to show the ends of the belt where there were no buckets.
Mr Davis sent another photograph of the lift at pp 2070 and 2071. This shows the crane above the chute, with the belt and buckets attached. The belt and buckets have been partly lowered into the chute. Thus anyone looking at that photograph would not know that on the bottom of the belt there were no buckets, but rather the ends had been clamped together in an S shape. The impression must have been given to Mr Gill by that photograph that the lift was being done in accordance with the photographs originally sent by Beumer, which required the belt with every bucket attached to be lifted back into the chute.
At 11.08am Mr Davis messaged that the elevator had been dropped into the casing and “boys are currently doing head drum and coupling up” (p 2071). At 12.21pm Mr Davis said, “The boys are just having lunch and will start on clamp shortly” (p 2072).
Mr Patterson joined in the chat at 1.15pm saying, “So we are just getting the clamp in place now”. Mr Gill asked for photographs or a video. The photograph was sent by Mr Patterson and Mr Gill understood that the photographs showed that the clamping being done was the temporary clamp being installed at the boot section of the elevator (pp 2072-2075).
There were further photographs sent of the clamping of the two ends of the belt being done at the bottom of the elevator. Mr Gill responded by providing technical information regarding the belt clamping. He asked for further pictures including a side view. Mr Gill asked for photographs of the torque wrench showing the torque applied to the bolts (an important matter for warranty purposes) and Mr Patterson sent the photographs back (pp 2076-2087).
At 3.38pm Mr Gill asked what was the next course of action for the day. Mr Davis replied that the plan was to get the join up the top this afternoon and finish for the day, then complete the works the next morning (p 2088). Upon being told this, Mr Gill said, “Be careful when stopping the bucket as it may keep turning due to imbalance of buckets” (p 2089). Mr Patterson said, “Yes we have ready to go”, Mr Gill asked, did the “drive unit have an inching/auxiliary drive” (p 2089). Mr Patterson said that it did. Mr Gill sent diagrams of the counterweight bucket sequence. It was necessary to take some of the buckets off the belt at a point opposite the clamp, so as to even the weight out (p 2090-2091). Mr Gill said that there should be seven buckets removed to balance the weight of the clamp. Mr Davis said that, “The boys will start to do the job from 6am tomorrow morning” (p 2091). Mr Gill said that he would be available from 6am on the next day (p 2093).
Mr Gill had, before the job commenced, sent written belt clamping instructions to Mr Davis, which were passed on to Mr Patterson. He also sent a copy of these instructions as an attachment in the WhatsApp group chat. The instructions are reproduced at PX 7, Tab 56. Crucially, p 2123 is headed “5.3.9 How to mount the buckets”. That heading is followed by an orange box with an exclamation point and the word “WARNING”.
Below that warning the following appears:
“There are more buckets mounted in the descending than in the ascending strand!
Drawing-in hazard, as the bucket elevator belt moves involuntarily due to the weight imbalance.
Distribute the buckets equally on the belt and mount them so as to ensure that the belt is in balance.
Do not ty to stop the belt should it start to move.
The buckets must only be mounted when the belt has been closed. An assembly opening is provided at one of the shaft casings for mounting the buckets.
….
At first, only a certain number of buckets is mounted so as to ensure that the belt is in balance. On bucket elevators with a height of up to 30 m, about every 6th bucket is to be mounted. If the height is up to 70 m, about every 10th bucket is to be mounted and with a height up to 120 m, every 20th bucket is to be mounted. The remaining buckets are distributed evenly in the gaps and mounted.”
It must be recognised that these written instructions related to a method for installing the new belt which was not adopted by Boral, on the advice of Beumer. That method was to winch the new belt on, with no buckets attached, by attaching it to the old belt which was then removed (see p 2118). However, even using the crane lift method approved by Beumer, p 2123 provides a warning that there must be a weight balance and the buckets must be distributed equally, so that there are not more buckets in the descending strand than in the ascending strand.
The photograph of the lift back in sent by Mr Davis to Mr Gill (reproduced also at p 2215) is of the new belt with buckets attached, partly inside the chute, thus concealing the fact that there were no buckets attached to the bottom of the belt. Mr Gill gave evidence, discussed below, that had he known this, he would have had advised as a matter of urgency that the job should not be done that way because of the imbalance of the buckets once the head roller was turned by the auxiliary motor.
Mr Jansen is a mechanical engineer who was employed by Nepean at the time of the shutdown. He started working for Nepean at the beginning of February 2022. Mr Jansen and Mr Patterson went to the New Berrima site prior to the shutdown commencing and spoke to Mr Davis. Mr Davis told them that the method to be used was to lift the head roller off together with the existing belt and all of the buckets. This was to be done by a large crane which would be provided by Boral. Mr Jansen had no previous experience with bucket elevators. Mr Jansen was shown the photographs, discussed above, which had been sent by Beumer showing how the crane lift method could be done. Mr Davis told him that the belt would be laid on the road, buckets would be replaced if they were defective, and the belt and the buckets would be put back in the same way that it was removed.
Mr Jansen was shown the Nepean SWMS (PX 2, Tab 27) discussed above. He said that the handwriting on pp 434 and 435 was all his. The handwriting on subsequent pages, which is in blue ink, was not his writing. Thus Mr Jansen was the person who wrote down the first four steps, commencing with setting up the area and concluding with lifting the head roller and buckets and lowering them to the ground.
Mr Jansen signed the document on p 443 to indicate that on 9 February 2022 he was involved in preparation of the SWMS. This document came about because Mr Davis said words to the effect that he wanted to be in the crib room with Mr Jansen and Mr Patterson and the whole crew “to go through the SWMS to talk about the job before it started” (Tcpt 266/48). Mr Jansen said that he wrote out the steps on pp 434 and 435, being the goals for the first day 9 February 2022. He wrote out the steps, the hazards, the risks and the controls for the work to be performed on 9 February 2022. The whole crew were there, and Mr Davis was there when this was done. Mr Davis said that Mr Bennett was being provided by Fenner because he was a belt technician who knew about the importance of the belt splicing to be done. Mr Jansen said that the SWMS was job specific to the task, which is why the whole crew was there speaking about it and he wrote down what was decided.
Mr Jansen was not on site on 10, 11, 12 or 13 February 2022. Mr Jansen was never asked to be involved in preparing an updated SWMS to cover the task of putting the belt and buckets back into the chute in EL13.
Mr Jansen did recall signing the ATW permit on 9 February 2022. He understood that this document gave permission to Nepean to work on the site on the listed task.
Mr Jansen was present when the problem arising from the crane not being high enough arose. He was on the ground and he called to the Nepean crew to ask what was going on. He was told that the belt was too long and they could not get it out of the chute. A second lift was done and the belt came out of the chute. He called the crew and asked how this was done, and they said they had cut the belt. The lower 10 metres of the belt was secured at the head chute, then the top part of the belt was removed in the first lift, and the bottom 10 metres was removed in a second lift. The two segments were laid out on the road with the buckets facing upwards.
Mr Jansen was asked about the function of a fluid coupling. He said that electric motors are harsh when they start up as they are either on or off. A fluid coupling takes up some of that energy and dissipates it a little slower into the gearbox to prevent shock load.
Mr Jansen acknowledged in cross-examination that Mr Patterson was the supervisor of the work being done on EL13.
I regard Mr Jansen as a witness of truth, but in one regard his evidence is rejected. He did say that he thought the old belt was going to be reused when the buckets were re-attached. In this he was wrong. It was always the plan to install a new belt on the conveyor as Beumer had previously advised that the old belt needed replacing and Mr Davis had directed Nepean to install a new belt, not to reinstall the old belt. Apart from this the evidence of Mr Jansen was accurate and reliable.
Mr Felix is a boilermaker and sheet metal worker. He worked for Nepean for two years, finishing in September 2023. He was a leading hand, which he described as a senior tradesman, able to give directions to other tradesmen. He had never worked on a vertical bucket elevator before the EL13 work in February 2022.
Mr Felix was asked about the Nepean SWMS at PX 2, Tab 27. He said that the blue writing on p 436 was his handwriting. He said that these entries were made on a date later than 9 February 2022. The tasks covered on p 436 were “change buckets” and “grind buckets”.
Mr Felix was taken to the next page of the SWMS (p 438) but he said that was not his handwriting.
Mr Felix said that he was aware of the problem with the crane not being high enough to lift the belt out, because he was there. Mr Davis was involved in discussions about removing the belt by cutting it.
Mr Felix said that he never spoke to Mr Gill and he was not part of the WhatsApp chat group.
Mr Felix said that he was shown a copy of the Beumer instructions for replacement of the belt. He said that after this document was circulated and discussed, one of the fitters came to him and said words to the effect of “we’re not doing it in accordance with the instructions”. This was Mr Brad Cox. This conversation occurred at the pre-start toolbox talk. As a result Mr Felix spoke to Mr Patterson and brought up what Mr Cox had said. Mr Felix recalled Mr Patterson saying that he would go and ask Mick Davis. Later Mr Patterson came to Mr Felix and said that Mick had spoken to the engineers and they were happy with the way that it was to be done (Tcpt 371/19-21).
Mr Felix was asked about installing the buckets back onto the belt. He said that they worked out that they would lift from the centre of the belt (i.e. half way along the belt) and to make the weight even they placed an equal number of buckets onto either side of the centre. The other buckets which were not put onto the belt were still on the ground and were going to be put on later. Mr Patterson told him this. Mr Patterson also told Mr Felix that once the belt was clamped it was going to be spun around and the buckets would be put on one at a time. This was going to be done from the inspection hatch. Mr Felix said that because the crane could not go high enough some of the belt was folded up and ratchet strapped together so that it could be lifted over the chute. Once over the chute, the ratchet straps were removed and the remaining belt fell down into the chute.
Mr Felix described what happened in the incident. The auxiliary motor was de-isolated and the on button was pressed by a Boral employee. The stop button was then pressed but the belt did not stop and “started taking off on its own”. Once the buckets went over the top roller the weight took over and the belt was in free fall. There was a sound like a jet taking off and everyone yelled out “run”. He ran down the stairs before the coupling exploded. He said that there was metal hitting everywhere. After he got to the bottom of the stairs Mr Felix kept running. Once the metal stopped hitting everywhere, Mr Felix looked around and saw Mr Bennett on the ground. He assisted in putting him into the recovery position. He saw that Mr Bennett’s hard hat was cracked or split in half.
In cross-examination Mr Felix confirmed that Mr Patterson was his supervisor for the belt and bucket change out. Mr Felix was never interviewed by Mr Patterson for an investigation that Nepean conducted.
Mr Felix could not recall Mr Bennett saying to Mr Patterson that the joint had to be done at the bottom.
I accept Mr Felix as a truthful and accurate witness. In particular, I accept his evidence about his conversations with Mr Patterson about the concerns initially brought up by Mr Cox. That evidence was admitted to prove that the conversations occurred, not to prove the truth of what Mr Patterson said.
Mr Bevan started working for Nepean in July 2021 as a boilermaker doing welding, metal fabrication and site work. He had never been to the New Berrima site before the incident. On the first day he worked there the old belt was on the ground and his job was to help remove the buckets and start putting them on the new belt.
Mr Bevan recalled reading the Beumer installation instructions. He recalled Mr Brad Cox saying, “We’re not doing it to procedure”. Mr Bevan agreed that on the toolbox talk forms there was no reference to anyone raising concerns about the procedure to be adopted.
Mr Bevan recalled a concern being raised about the weight of the belt and a decision being made to only put about half the buckets back on the belt. Mr Bevan remained concerned about the planned procedure because of the effects of gravity. Once the weight took over to one side he was concerned about the belt slipping downwards. He mentioned these concerns after the toolbox talk to Mr Patterson.
After Mr Bevan raised his concerns as to what would stop the belt from running freely, he said he was told by Mr Patterson that the gearbox would hold the bucket elevator. He said that this conversation occurred as he and Mr Patterson were walking away from the toolbox talk towards the job. He said that this conversation occurred on the day of the incident 13 February 2022.
Mr Bevan recalled the Boral employees de-isolating the auxiliary motor and pressing the on button. He said the belt moved very fast. He heard a noise like a jet engine and people called out “run”. He ran and went down the stairs. Later he saw Mr Bennett lying injured on the concrete between the lift and the head chute.
Mr Bevan was involved in the recovery of the belt and buckets some days after the incident. This was done by using chain blocks. It was a long process, as the belt was pulled and pushed around so that a bucket could be inserted from time to time through the access hatch on level 3. The belt was not moved by using either motor, but was moved manually by the chain blocks.
There was no cross-examination of Mr Bevan, who I regard as an accurate witness of truth.
Mr Slater started working for Nepean in January 2012. He was a boilermaker involved in welding and fabrication, rigging and industrial maintenance. His regular supervisor was Mr Patterson.
Mr Slater was asked about the SWMS initially created on 9 February 2022. He agreed that if there was a change to the planned work that should be recorded in a SWMS.
There were changes to this job. The crane could not get a full height lift, so the belt had to be cut to be lifted out of the chute. The cut segments of the belt were laid out on the ground and buckets were removed and replaced. The head drum was taken to a Nepean workshop to be inspected and serviced. When the belt was to be put back on the conveyor, about half the buckets were on the belt. They were spread evenly from the centre of the belt either side. When the belt draped over the head drum was put into place, the buckets were evenly distributed on either side of the head drum, all at the top of the belt. When the clamps were taken off, the belt did not move. The splice at the bottom of the belt was then performed by others.
Mr Slater was asked whether anything was said by anyone in the team about the buckets being uneven. He said that a few of the workers commented on this. He said that this was definitely raised at a toolbox talk.
Someone said that the brakes should be able to handle the belt but he could not remember who said that. Mr Slater did say that he had in the recent past suffered a head injury at work, and his memory was not what it used to be.
Mr Slater gave a version of the incident consistent with that given by all other witnesses. He too described a noise which sounded like a jet engine.
There was no cross-examination of Mr Slater. In spite of his admitted memory problems, I formed the view that Mr Slater is doing his best to tell the truth. His evidence concerning conversations about how the uneven distribution of the belts would be handled was not precise.
In February 2022 Mr Patterson was employed by Nepean as a site manager. He was managing the Nepean crew doing the EL13 work. Mr Patterson is a boilermaker, fabricator and welder. He has had training in project management. While he had worked on bucket elevators before, he had never heard of a case of a belt over-speeding or over-running.
Mr Patterson was sent photographs provided by Beumer, to show how the job could be done by lifting the belt out by a crane, with all of the buckets attached. Before the job started at New Berrima, he went to the site with Mr Jansen and met Mr Davis. Mr Patterson was aware that the Beumer way to do things, set out in the manual, was to remove all of the buckets and feed them on one at a time. Mr Davis said that using the crane to remove the belt and buckets in one piece would be quicker.
Mr Patterson was not on site on 9 February 2022 when the crane had problems lifting the belt and buckets out, but he was informed there was a problem. He said that after the lift out, the old belt was placed on the ground, the buckets were removed and about 90 per cent of the buckets were transferred onto the new belt. There was then the problem of getting the belt and the buckets back into the chute, and so buckets were removed from the bottom of both legs of the belt. This meant that there were an equal number of buckets either side of the centre of the belt, which was placed to be over the head roller.
Mr Patterson was shown the Nepean SWMS (PX 2, Tab 27) and acknowledged that there was no reference in that document to replacing the buckets and no reference to the need to keep the buckets balanced. He said that he thought that some of the writing on p 438 of the SWMS was his but he was not 100 per cent sure.
Mr Patterson had his attention drawn to the change in the process, whereby the number of buckets on the belt had to be reduced. He said that this should have been documented, but it was not.
Mr Patterson said that at one of the toolbox meetings workers expressed concerns about the imbalance of the buckets. He could not remember who brought this up. He did recall a conversation with Daniel Bevan on that topic. Mr Bevan was concerned about the balance of the buckets and wanted to know what would prevent the belt from over-rolling. Mr Patterson said that he would go and ask a question of Mick Davis and get an answer.
In relation to a conversation with Mr Davis, Mr Patterson gave the following evidence (Tcpt 463/14-21):
“Q. What did you say to Mr Davis?
A. We’ve got concerns about the balance of the buckets. What’s going to stop the belt when we inch it, what’s going to stop it from over rolling.
Q. What did Mr Davis say?
A. That the inch break [sic: brake] ‑ he believed the inch break [sic] would hold the belt and he would get that confirmed by Boral’s ‑ I suppose their engineers. I don’t remember him saying who it was.”
It is to be noted that in this version of the conversation, Mr Patterson asserted that Mr Davis volunteered that an inch brake would hold the belt. Mr Patterson gave evidence that Mr Davis did come back to him and said that the Boral engineers had said that the inch brake would hold the belt. Mr Patterson said that he went back to Mr Bevan and confirmed this to him.
Mr Patterson acknowledged that he had read the bucket elevator instructions provided by Beumer. He received these attached to an email. He said that he read some of the document but it was quite a large document and he did not read the whole thing. He was interested in how the buckets were removed and replaced, and how the belt was to be coupled together.
Mr Patterson recalled being made a participant in the WhatsApp group. He had never used WhatsApp before, but he did use it on the EL13 job to look at the matters posted on his phone.
Mr Patterson said that Mr Davis introduced him to Mr Gill, “who was going to be overlooking the way we clamped the belt together and spliced the belt”. Mr Patterson said that there was never any discussion about imbalance of the buckets, he could not recall communicating to Mr Gill how many buckets were on the belt, and he could not recall any discussion in the WhatsApp group about the number of buckets that should be removed. He was never asked by Boral to do a new risk assessment using a template.
At the time of the incident Mr Patterson was at the bottom of the belt. The belt was being inched, but then it started to run quickly. It blew open the doors at the bottom of the chute and there was dust everywhere. Mr Cox rang to say that Mr Bennett had been hit by something and needed an ambulance.
Mr Patterson said that he spoke to Mr Davis about how to get the weight down and how many buckets had to be taken off the belt. He said that the two of them calculated how many buckets had to be removed.
Mr Patterson was cross-examined about a report prepared in part by him for Nepean about the incident (PX 1, Tab 11). He accepted that nowhere in the report did he refer to relying upon anything which Mr Davis had told him about the means of holding the belt after it was inched.
In cross-examination Mr Patterson accepted that he would not regard Nepean as a company brought in to provide labour hire. He said that Nepean was engaged for specialist skills which included performing engineering and fabrication services (Tcpt 539/16-27).
Mr Patterson confirmed that he did not read all of the documents sent through by Beumer. He read the parts about how the buckets had to be tensioned back on and also about the splicing of the belt, being the bits “that I believe we needed to – to get out of there” (Tcpt 544/14-16).
Mr Patterson accepted that during the WhatsApp chat he had not informed Mr Gill about the decision that had been taken to remove some buckets from the new belt prior to its installation. Nor did he raise with Mr Gill the question of whether the brake on EL13 would hold the belt and buckets during the inching. He did not raise any concerns with Mr Gill concerning the imbalance of the belt.
I do not accept the evidence of Mr Patterson to the effect that he went to Mr Davis and asked what would stop the belt from going into free run and that Mr Davis said he would go away and ask the Boral engineers. I do not accept the evidence of Mr Patterson that Mr Davis came back to him and said that the Boral engineers had told him that an inch brake would hold the belt. My reasons are:
There was no evidence that EL13 had an inch brake, whatever that may be, which remained a mystery.
There was no consistent version of what Mr Patterson said when his workers raised their concerns:
(a) Mr Felix said that when he told Mr Patterson about the concerns of Mr Cox, Mr Patterson said he would ask Mr Davis. (b) Mr Bevan said that he raised concerns with Mr Patterson, he said that the gearbox would hold the belt – no mention of going to Mr David or consulting Boral engineers. (c) Mr Slater recalled concerns being raised at a toolbox meeting, but there is nothing in the toolbox minutes. (d) Mr Patterson said that the matter was raised in toolbox meetings. If so, it is not in the minutes. He also said that Mr Bevan raised it with him and he said to Mr Bevan that he would ask Mr Davis. As recited above, Mr Bevan has a different recollection.
(a) Mr Felix said Mr Patterson came back to him and said that the Boral engineers were happy with the method. (b) Mr Bevan got an answer straight away from Mr Patterson, without mention of Mr Davis. (c) Mr Patterson said that when he raised it with Mr Davis, he was told straight away that an inch brake would hold the belt, and that Mr Davis would check this with the Boral engineers.
Four Boral engineers came and went from the witness box without being asked whether Mr Davis had come to them with any concerns expressed by Mr Patterson about free running of the belt. I infer that if asked, they would have said that Mr Davis never came to them on this topic.
The Nepean investigation report (PX 1, Tab 11) which was co-authored by Mr Patterson very shortly after he incident, doesn’t say a word about the alleged conversations – yet on the version put forward at the trial by Mr Patterson, it was really what Mr Davis said which led to Mr Patterson giving the go-ahead to start the auxiliary drive and roll the unbalanced belt.
These matters cause me concern more generally about the accuracy of Mr Patterson’s recollections. However, most of the rest of his evidence is consistent with contemporaneous documentation and the evidence of other witnesses.
The submission was made that if I accept that Mr Davis was not asked what would stop the belt from going into free run, and did not give Mr Patterson an assurance upon which he acted, then the prosecution case must fail. I do not accept this submission, for reasons discussed below.
Mr Bennett came to court at the behest of SafeWork. He was clearly a very unwell man. I made an immediate order that he was not required to give evidence for reasons to be given subsequently.
I relisted the matter on a later day, when I heard further submissions. My ruling stood and thus Mr Bennett was not permitted by me to give any evidence. The ruling was made ex tempore. Neither party has made a request for the ruling to be transcribed.
Mr Gill is employed by Beumer as a mechanical engineer. He has a degree in chemical engineering. He has worked for Beumer Group Australia for six years. He was involved in providing subject matter expert advice for the EL13 work during the February 2022 shutdown. He prepared a report on that job dated 15 March 2022.
The report was tendered in evidence at PX 1, Tab 8. It is a “travel report” dated 15 March 2022 addressed to Boral.
Because Mr Gill was not on site, he was in part dependent on photographs given to him to understand the work which was done. Figure 1 in the report (p 98) is said to be “the complete old belt” which was lifted from the elevator casing with the drive pulley and buckets attached. Figure 1 is a photograph which could be interpreted that way, but other evidence would suggest that this is the first and longer part of the belt lifted out with the buckets attached, and that still within the elevator casing at that stage must have been the lower part of the belt which was cut so that the belt would clear the head of the chute.
Figure 4 is said to be “[n]ew belt with partial buckets and drive pulley lifted with 500 ton crane”. This is the photo sent by Mr Davis, which shows the belt partly above and partly inside the chute. Buckets are attached to the belt above the top of the chute, but one cannot tell from that photograph whether there are buckets attached all the way down the belt, where the belt is concealed within the chute.
By the time he wrote the travel report, Mr Gill had been told what actually happened in the incident. He therefore recorded that on 13 February 2022 “due to weight and height constraint, many buckets were removed to achieve the lift by the crane”.
In relation to the photograph which is Figure 4, Mr Gill said, “And this is the only picture I have of the whole lift of the job. So if you look at this picture, I cannot tell you whether the buckets was removed or not, or whether they were full buckets or partial buckets” (Tcpt 717/1-4).
Mr Gill said that he had worked with conveyor belts and fluid couplings for over 20 years. At no stage before the incident did anyone tell him that before reinstalling the belt, buckets had been removed. He gave the following evidence (Tcpt 717/43-718-15):
“Q. If you had been told that buckets had been removed, what advice would you have given?
A. Firstly, I would ask them why would you remove the buckets because you ‑ you were able to lift the whole ‑ whole bucket elevator out completely in one ‑ in one section without any issues, so you should be able to put it back as well without any issues. But if ‑ if the weight of the crane was the constraint, I could have given advice that there are two options, either you alternate the buckets, meaning you remove every second bucket. You will keep one, you’ll remove one, you keep the second one, that’s how we do it all along. That way, the bucket elevator already remains in balance. Or the other option would be lift the..(not transcribable)..separately to the belt, so that means you reduce almost a tonne of weight already.
Q. Why is it important to keep the buckets in balance; why is that important?
A. Because the drive unit is only a backstop, meaning it can only stop you from turning in one direction, but on the other direction is always free to run. So what happens is if the buckets only in one side, too many and less on one side, the ‑ the whole bucket elevator is going to go on a free run, and there’s no way to stop him.
Q. What do you mean by a free run?
A. A free run is when ‑ when ‑ when the elevator is run ‑ is free to move without any ‑ any drive motor holding him.”
Q. Why is it do you always give that message about to be careful about an imbalance of buckets?
A. Because it’s a dangerous job.
Q. Were you ever told that the buckets had been removed from the bottom section of the belt, leaving buckets on the top half on either side, were you ever told that?
A. No.
Q. If you had been told that, what would you have done?
A. At this stage, it is a bit dangerous because the buckets are already unbalanced in ‑ in that manner, so ‑ but I would have still advised them to do something different, we could have put some chain blocks and start installing buckets along the way while we are bringing the clamping connection to the top. So there was still possible if I were ‑ knew ‑ knew even in this situation.”
Mr Gill said that if there are more buckets on the bottom strand and fewer buckets on the upper strand, the drive unit is automatically going to start to take off. It will go into free run. Mr Gill said that when this happens the belt is turning the gear boxes and will run freely even if you disconnect the drive units. The forces will be transmitted to the fluid coupling which will speed up. Pressure built up inside the fluid coupling because it was running so fast. He was not able to say why the coupling exploded, but said that the fuse plugs would not stop the explosion happening.
Mr Gill said that the conveyor had a back stop to stop the belt running backwards, but the back stop did not prevent the belt from moving forwards. He said that when the belt went into free run, it was not the gear box driving the elevator, but the elevator was driving the gear box. Even if the inching drive was turned off, the belt would still move because it was unbalanced.
Mr Gill said that he had previously supervised a belt change using a crane. He said that if a crane lift is used, you do not need to use chain blocks or the maintenance hatch. The buckets would be already installed on the belt before it was lifted back into the elevator chute.
In cross-examination Mr Gill said that his role as the mechanical engineer with Beumer was to remotely supervise the task that was being done to change out the belt. It was important to have Beumer supervise the work, because Beumer’s warranty would then attach to the equipment.
Mr Gill gave the following evidence (Tcpt 738/24-44):
“Q. Is this correct, but you correct me if I’m wrong. Where it says figure 4, new belt with partial buckets, that part of it. The reference to partial buckets, is that something that you came to learn about after the incident, as opposed to what you could see in this photo?
A. Yes, correct.
Q. I just wanted to ask you some questions about what you told his Honour earlier in relation the importance of getting information from the people doing the job on the ground as to what they were doing with the installation of the buckets. If you had been told that the workers were not installing the buckets in an even manner, and that there was to be an imbalance with the buckets, would you have stopped them doing the job in that way?
A. Definitely.
Q. Why would you have stopped them doing the job in that way?
A. Because it’s unsafe.
Q. And why is it unsafe?
A. Like the accident happened because of that. Because if it’s unsafe, and you may not see the situation when you do the lift, but when you rotate it that’s when you’re going to get the problem.”
Mr Walker was the crane operator of a 500-tonne crane used for the work on EL13. He operated the crane when the conveyor belt with all of the buckets attached was initially lifted out of the chute. The original slings used were not strong enough so the belt was lowered back into the chute and stronger slings were used. On the second attempt to lift the conveyor belt out, Mr Walker found that the height of the crane was not sufficient to lift the entire belt and clear the top of the chute. An alternative plan was then organised, so that the Nepean crew cut the belt towards its lower end. The crane then lifted the top part of the belt out and placed it on the ground. It then lifted the smaller bottom section of the belt out and laid it on the ground. All of the buckets were attached to both segments of the belt.
On a subsequent day an additional fly was attached to the end of the crane to give the crane extra height. Extending the height of the crane reduced the lifting capacity of the crane.
Mr Walker was the crane operator when the belt was lifted back into the chute. He said that only some of the buckets had been put on. The belt was draped over the head pulley. Buckets were placed on either side of the belt from the head pulley downwards, to about the halfway point. The ends of the belt, where there were no buckets, were tied up to be able to get the belt into the chute. There was a change of process but there was no further risk assessment (Tcpt 94/10). After the belt was lowered in, the crane was packed up and the crew went home. Mr Walker was not present on the site when the incident occurred but he found out about it at the toolbox meeting the next morning.
There was no cross-examination of Mr Walker who I find to be an accurate and truthful witness.
Mr Hazzard was employed by WGC Cranes as a dogman and rigger.
Mr Hazzard could not remember doing any work in relation to lifting the old belt out. He did remember the new belt being put into the chute. He recalled that there were buckets on the belt but he could not remember where on the belt. He could not recall the belt being folded or strapped in any way.
Evidence was given at the trial by the following SafeWork Inspectors: Williams, Flack, Kalmanidis, Crosbie and Tobin. Their evidence largely concerned visiting the scene of the incident, issuing notices, obtaining documents and interviewing participants.
Inspector Tobin conceded that although Mr Patterson told him that Mr Davis said that there was a mechanism which would prevent the conveyor going into free run when the auxiliary motor was activated, he never went back to Mr Davis to ask him his version of such alleged conversation.
Mr McNeill is a mechanical engineer retained by SafeWork to provide expert reports. His first report dated 10 January 2024 is at PX 1, Tab 12. His second report dated 6 February 2024 is at PX 1, Tab 13.
The first report set out the documentation and assumed facts provided to Mr McNeill by SafeWork. Mr McNeill offered the following opinions:
A hazard existed leading to the elevator belt becoming free running, because of the imbalance of the buckets on the belt.
The PCBUs responsible for the bucket elevator should have been aware of that risk.
There were explicit warnings and guidelines provided in the Beumer bucket elevator installation instructions. The failure to establish safety guidelines provided by Beumer and the apparent oversight in managing the known risks of imbalance led to the incident.
A hazard which existed 13 February 2022 was that the hydraulic coupling could fail or crack. The coupling was designed to run at 1500 rpm but sped up to approximately 13,000 rpm, about eight times its normal operational speed. The coupling would also be subjected to non-uniform loads across the housing due to the fluid cavitating.
The PCBUs should have known about the hazard, being a potential risk arising from uncontrolled forward motion with the possibility of speed significantly exceeding the design limits.
The failure mode which explained the incident was the uneven distribution of buckets, resulting from a failure to follow the Beumer installation instructions. The extreme speed generated caused the fluid within the coupling to exert forces beyond the housing’s capacity, leading to catastrophic failure of the coupling.
The guard over the coupling at the time of the incident was neither designed nor suitably constructed to contain the parts of the coupling in the event of a catastrophic failure.
The guard over the coupling was typical for protecting personnel during operational conditions and was sufficient for those scenarios. The design of the guarding was considered industry standard for the operational risks typically associated with rotational equipment.
A risk existed of any worker at the top of the conveyor being hit by shrapnel and/or hot hydraulic fluid from the failed coupling.
The likelihood of the risk occurring under regular conditions was extremely low, but the likelihood of the event happening was extremely high when the bucket elevator was exposed to an unbalanced scenario. The degree of harm that could result from such an event was substantial, potentially leading to severe injuries or even death.
The PCBUs concerned should have reasonably known about the risk; the error was fundamental and was clearly covered in the installation documentation provided by Beumer.
During maintenance operations it was not necessary to keep the coupling connected. Uncoupling the coupling and the main drive motor from the gear box was a feasible measure to mitigate the risks associated with such extreme scenarios.
There should have been a thorough review of the SWMS and it should have been updated to accurately reflect the changes in relation to the planned procedure for lifting the new belt and buckets back into the elevator chute. Following the update, a toolbox talk with all involved personnel would have been essential to ensure that everyone was informed about the changes and understood the revised procedures.
The original SWMS lacked detail and adequate risk evaluation. The methodology did not accurately capture the actual risk associated with the tasks required to be completed, nor did it effectively mitigate them.
The risk occurred because of the failure to adhere to the installation instructions provided by Beumer and to implement a safe SWMS.
SafeWork filed detailed written submissions (MFI 41, 42 and 43), as did Boral (MFI 44, 45). Both parties addressed orally.
Senior Counsel for Boral identified nine issues for determination. These are dealt with below.
There was broad agreement between the parties as to the approach to be taken to determination of the meaning and operation of the WHS Act. Senior Counsel for Boral submitted as follows:
The health and safety duty under s 19 of the WHS Act is not an absolute duty.
The words “reasonably practicable” are ordinary words, bearing their ordinary meaning, and simply call for the making of a value judgment, in light of all the facts.
Hindsight in consideration of Element 3 may mislead and would be an incorrect approach.
The WHS Act does not require employers to ensure that accidents never happen. It requires them to take such steps as are practicable to provide and maintain a safe working environment. The court must look at the facts of each case, as practical people would look at them, not with the benefit of hindsight, nor with the wisdom of Solomon, but remembering that one of the chief responsibilities of all employers is the safety of those who work for them.
The words “reasonably practicable” indicate that the duty does not require an employer to take every possible step that could be taken. An assessment needs to be made of the likelihood that harm would arise, the magnitude of the potential harm, the nature of the measures that could have been taken to eliminate or minimise the risk, and the ultimate effectiveness of remedial measures as pleaded.
Risk means the possibility of harm, and not necessarily actual harm.
SafeWork must establish that in all the circumstances Boral knew of, or that a reasonable PCBU in the position of Boral would have appreciated or foreseen, the risk pleaded in par 12 of the Amended Summons.
The issue of whether a particular measure would have addressed the general class of risk is assessed prospectively, as distinct from Element 4. It is wrong in considering whether a breach has occurred, to reason backwards from the actual incident. Such an approach may lead to a misunderstanding of the real facts on which the charge is based. A breach cannot be properly assessed without identification of the specific act or omission said to constitute the contravention.
I accept that these submissions correctly state the approach which this court must take.
Senior Counsel for Boral submitted as follows:
The relevant question on causation is whether the act or omission of the defendant was a significant or substantial cause of workers being exposed to the risk of injury. A finding of causation requires a backward-looking analysis of what actually occurred in order to attribute liability for a criminal offence.
There may be more than one significant cause. Exposure to risk at the workplace is often multifactorial.
If there remains a reasonable hypothesis consistent with the innocence of a defendant, the charge must be dismissed. If at the end of the evidence there is any doubt raised as to whether the events were caused by the failure of the defendant or some other unrelated factor, then the defendant is entitled to the benefit of that doubt.
Element 4 must be established beyond reasonable doubt.
I accept that these submissions correctly state the approach which this court must take.
Senior Counsel for Boral submitted as follows:
Beumer had been retained by Boral to provide specialist advice and remote on-site supervision.
In some circumstances reliance by a defendant on expert contractors is a relevant factor when considering whether there has been a breach of duty.
This does not mean that an employer or principal faced with a task which is beyond its area of expertise can, by contracting out the work to another, relieve itself of any responsibility under the WHS Act to ensure the safety of its workers. The employer or principal continues to have a duty to take all reasonable precautions to avoid risks to the safety of workers but can sufficiently discharge that duty by ensuring that relevant expertise is brought to bear on the task. What is required in any particular case depends upon the facts of the case.
Where more than one person has a concurrent duty, the person’s capacity to influence and control the matter becomes relevant. That is especially so where a person who lacks relevant safety expertise in a matter engages a specialist contractor to perform a task.
Regardless of whether Nepean or Boral was doing the work on EL13, such work was always going to require Beumer to provide the expert supervision and advice.
I accept that these submissions correctly summarise the approach which this court must take. A more detailed statement of the relevant principles has been set out earlier in this judgment.
Senior Counsel for Boral submitted as follows:
The contractual relationship between Boral and Nepean, and Boral and Fenner, was not a labour hire arrangement and was not one in which Fenner and Nepean were acting as agents of Boral.
An agency relationship between two parties is a relationship involving authority or capacity in one person, the agent, to create or effect legal relations between another person, the principal, and third parties. An agency relationship involves appointing a person or entity to act on behalf of another person or entity, the principal, when dealing with third parties.
While both Nepean and Fenner had a contractual obligation to comply with Boral’s occupational health and safety procedures and all other reasonable directions given by Boral, that is distinct from imposing a blanket requirement to be subject to any other directions of Boral. No evidence was led from Mr Davis, Mr Gauci or any other Boral employee that they were in charge of the work crew on 13 February 2022 and were giving directions on that date.
Mr Davis said that he walked around the site to see how each contractor was progressing with their job. He did not offer instructions on what a particular crew had to do step-by-step throughout the job. Each crew was left to the direction of their supervisor.
This was not a labour hire arrangement as Nepean and Fenner were providing engineering and fabrication services.
Mr Davis did not sign on to the Nepean SWMS as the person who would be supervising the work. His purpose in signing the document was to authorise Nepean to commence the work, because he had sighted the SWMS and the first steps to be taken. It was Mr Patterson who in fact was supervising the work.
Further, the SWMS and the JSEA were signed in the context of being created to enable an initial Authority to Work Permit to issue.
I accept all of those submissions. I find that this was not a labour hire arrangement.
Senior Counsel for Boral submitted as follows:
All of the particulars of the charge, including those in par 13 of the Amended Summons, allege that Boral itself failed to do things. A PCBU commits an offence because of its own failure, not because it is contended that it is vicariously liable for the failure of an agent.
There was no elaboration by SafeWork on why an agency arrangement existed, and thus why s 244 of the WHS Act would come into play, apart from the mere assertion of that proposition.
SafeWork contended that s 272 of the WHS Act meant that any provision of a contract that asserts that a commercial party is not an agent is void. Section 272 relates to any term of an agreement that purports to exclude, limit or modify the operation of the WHS Act or any duty owed under it. Any attempt to transfer such duty to another party is void. This was not what the contract attempted to do.
I accept all of those submissions and find that neither Nepean nor Fenner were agents of Boral, within the meaning of s 244 of the WHS Act. My reasons are:
There was no evidence that Boral assented to either Nepean or Fenner acting on its behalf, so as to affect Boral’s legal relations with third parties.
Both Nepean and Fenner were simply doing contract work on the site, as were dozens of other contractors engaged during the shutdown. They were doing an engineering job, not acting in any representative capacity for Boral, either to create contractual relations or to somehow represent Boral.
The fact that both contracts between Boral and Nepean and Boral and Fenner contained a specific clause to say that no agency relationship was created, is not determinative, but is a weighty consideration in the absence of evidence that the label is a sham.
The WHS Act does not contain a provision which deems one party to be the agent of another unlike the legislation considered in Kench v Adams, referred to above.
Nepean was a sophisticated and experienced engineering company, which provided engineering services to Boral for a specific job to be done during the shutdown. In this respect it was no different to every other contractor on site, engaged for a limited time for a specific purpose.
The same can be said of Fenner.
Neither Nepean nor Fenner had unfettered authority to do the work as they saw fit. Both the overarching Boral safety documents, and the contracts entered into between the parties, said that Nepean and Fenner were subject to reasonable directions given by Boral.
SafeWork had submitted that Mr Ragg and Mr Burgess were Boral employees, and that, because Boral failed to take any appropriate steps to protect their employees, Boral must be found guilty. Boral disputed this submission. Senior Counsel for Boral submitted as follows:
The pleaded failures in par 13 of the Amended Summons were not pleaded by reference to Mr Burgess and Mr Ragg.
There is no reason to differentiate between categories of workers, because of s 7 of the WHS Act. There is no reason to read down the list of workers so as to confine it to Mr Ragg and Mr Burgess.
No attempt has been made by SafeWork to identify which measures were directed purely to Mr Ragg and Mr Burgess.
I accept the Boral submissions. There were not two classes of workers on Level 7 of EL13 at the time of the incident – all workers were owed the same duty.
Senior Counsel for Boral submitted:
None of the Boral engineers had the expertise of Mr Gill in order to supervise or advise on the belt replacement work on EL13.
Mr Gill on behalf of Beumer provided the manual in relation to the elevator belt change. At the Microsoft Teams meeting on 10 February 2022, Mr Gill was introduced to Mr Patterson and Mr Bennett, as the OEM Engineer who would be supervising the work remotely.
There was nothing in the WhatsApp group chat by way of photos or otherwise, to demonstrate that Mr Davis was aware of any danger or safety issue that should have been the subject of some intervention by him. I accept this submission, confined as it is to Mr Davis personally not having awareness of the safety risk from the changed process. That it not to say that Boral did not have a duty to perceive and guard against the safety risk, a matter dealt with below.
Beumer provided instructions on how the work could be done safely by using a crane, and Beumer endorsed this method.
I accept these submissions.
Senior Counsel for Boral submitted as follows:
Particulars 13(a), (c), (e), (f), (g) and (j) require the court to keep in mind that Beumer provided expert guidance and supervision on multiple occasions in the past which was relied upon by Boral.
Nepean was itself a specialist contractor providing engineering services for the work. It had its own senior site supervisor to supervise the work crew. The particulars identified above should be rejected.
Particulars 13(f), (g) and (h) are based entirely on hindsight.
I deal with these submissions below.
Senior Counsel for Boral submitted:
SafeWork’s central thesis is that Nepean permitted the work to be done contrary to Beumer’s guidance “based on the false assertion by Mr Patterson that he received assurance from Mr Davis”.
Mr Patterson’s assertions concerning the alleged assurance by Mr Davis, was the reason why the Nepean crew did what it did on 13 February 2022. This means that SafeWork fails on the issue of causation.
SafeWork cannot prove beyond a reasonable doubt that because of any assurance given by Mr Davis, Nepean acted the way it did.
The risk only came into existence on 13 February 2022 because of the actions of the Nepean work crew, without seeking the advice or guidance of Beumer in relation to the buckets on the belt.
Senior Counsel for Boral provided a detailed analysis of the varying versions of the Patterson/Davis conversation which was alleged. The inconsistencies between those versions have been dealt with above. Reference was also made to the notion of an “inch brake”, as to which there was no evidence that one existed, as well as the failure in the Nepean investigation report to even mention the alleged conversation with Mr Davis.
I have already stated that I do not accept Mr Patterson’s version of conversations with Mr Davis on the topic of inch brakes, engineers, and assurances. However I do not accept the submission that if I reject the Patterson version, then necessarily the prosecution fails. My reasons are set out below.
I accept the submission made by senior counsel for SafeWork that even if I reject the Patterson/Davis conversation, I must still go on to consider the SafeWork case on Elements 3 and 4. It is noted that none of the particulars in par 13 of the Amended Summons rely upon Mr Patterson relying upon any assurance given by Mr Davis. As to causation, I must consider whether any act or omission of Boral was a significant or substantial cause of workers being exposed to the risk of injury.
I make the following findings of fact for this period:
Nepean was engaged by a contract with Boral Construction Materials Limited dated 25 November 2021 to provide engineering and fabrication services to the Boral Group.
In November 2021 emails were exchanged between Mr Patterson and Mr Davis concerning Nepean being engaged to assist Boral with the February 2022 shutdown.
In early February 2022 Mr Patterson provided Mr Davis with the names, phone numbers and email addresses of himself and eight other Nepean employees with a view to arranging for Boral inductions.
On 1 February 2022 technicians from Beumer attended the New Berrima site to inspect four bucket elevators.
As a result of those inspections Beumer recommended replacing the belt on EL13.
Mr Davis contacted Beumer and raised the prospect of using a crane to lift out the belt with the buckets attached, having a new belt with buckets pre-assembled on the ground, and then lifting the new belt with all buckets attached back using the crane.
Mr Davis was informed by Beumer that this was a method which had been used successfully in the past. Photographs and instructions were provided as to how the crane lift process should be done.
On 4 February 2022 Mr Davis contacted Mr Patterson to discuss the potential engagement of Nepean to undertake the work on EL13.
Boral engaged about 30 different contracting companies to assist in the February 2022 shutdown, involving between 300 and 450 contract workers being engaged.
During the February 2022 shutdown, Mr Davis undertook the role of Shutdown Coordinator.
Mr Davis was not required to directly manage or supervise the work being undertaken by contractors.
Mr Davis was required to engage with contractors to ensure that they were able to undertake their work safely.
On 4 February 2022 Mr Davis met with Mr Patterson and Mr Jansen from Nepean at the New Berrima site. Mr Davis showed them the location of EL13 and discussed available methods for undertaking the job.
Mr Davis informed Mr Patterson and Mr Jansen that because large cranes were to be on site, the work was to be done by lifting out the old belt with all buckets attached and then lifting the new belt with all buckets attached back into the elevator chute.
Nepean agreed to undertake the EL13 work using the crane lift method.
Boral engaged WGC to do a lift study and to bring cranes to the site to do, inter alia, work on EL13.
On 5 February 2022 Mr Davis emailed Beumer and asked for detailed instructions on how to complete the belt change and how to join the two ends of the new belt.
On 7 February 2022 Beumer provided pictures to show the replacement of a belt, with buckets attached, using a crane.
On 7 February 2022 Beumer offered to arrange for its engineer Mr Jack Gill to provide remote supervision and assistance for the installation of a new belt.
On 7 February 2022 Nepean arranged for a work crew to undertake a Boral induction to do the EL13 work.
On 7 February 2022 Mr Davis sent to Mr Patterson instructions from Beumer in relation to the elevator belt change. Included with this material was the photographs showing a crane lifting the belt in and out.
On 8 February 2022 Boral issued a Purchase Order to Nepean in relation to the work of replacing the belt on EL13.
I make the following findings of fact:
Mr Gill emailed Mr Davis and introduced himself as the engineer from Beumer who would assist with the installation of the new belt. Mr Gill suggested that Mr Davis should set up a WhatsApp group, as Mr Gill was providing remote supervision from Victoria, because of Covid restrictions.
The Nepean work crew underwent a site induction at the New Berrima site.
The Nepean work crew participated in a toolbox talk conducted by Mr Patterson.
Mr Davis attended this first Nepean toolbox talk to meet the Nepean crew.
Nepean had pre-prepared a Job Safety Environmental Analysis (JSEA) for the belt and bucket change out.
Mr Davis (as the Authorised Work Controller under the proposed ATW Permit) reviewed the JSEA and determined that it was not task specific.
Mr Davis required Nepean to prepare a task specific SWMS for the works.
Mr Jansen prepared a SWMS for the EL13 work. This dealt with the following four steps:
1. Set up area
2. Remove hatches and hood
3. Remove tension at bottom roll
4. Lift head roll and belt and lower to ground.
I make the following findings of fact:
On 10 February 2022 Mr Davis, Mr Bennett and Mr Patterson attended a meeting in Mr Davis’s office. Mr Gill attended the meeting by MS Teams.
The purpose of the meeting was to introduce Mr Gill to Mr Patterson and Mr Bennett and to discuss the method of work to be undertaken.
Mr Patterson and Mr Bennett were informed that Mr Gill had been engaged by Boral to provide expert advice and online supervision of the work being undertaken.
Mr Gill told the meeting that he was familiar with the crane lift method and he was fine with that method being used.
Mr Davis set up the WhatsApp group.
Mr Gill sent a copy of the technical drawings for the EL13 bucket elevator, together with a tool list, belt clamping instructions and joining instructions. These instructions included “5.3.8 How to mount the bucket elevator belt” and “5.3.9 How to mount the buckets”. Mr Gill also sent a series of photographs demonstrating how the buckets were to be mounted to the new belt.
On 10 February 2022 Mr Davis provided a copy of the Beumer instructions to Mr Patterson. This document formed part of the Nepean work pack for the job.
Mr Patterson did not read the entire Beumer document but did read the parts regarding mounting the buckets.
The Nepean work crew removed the buckets from the old belt, which was lying in two pieces on the roadway near EL13. Some had to be taken away and replaced with new buckets.
I make the following finding of fact:
The Nepean work crew continued to undertake the task of the removal of the buckets from the two segments of old belt, and started to place the buckets on the new belt.
I make the following findings of fact:
WGC Cranes installed a long fly jib to the boom of the crane to extend the lifting height. This meant that the lifting capacity was reduced.
The crane operator informed Mr Patterson that there needed to be a reduction in the weight to be lifted. Mr Davis was present during this conversation (Tcpt 911/43).
Mr Patterson informed the Nepean work crew that they would need to remove buckets from the new belt.
Mr Davis heard Mr Patterson inform the Nepean work crew that they would need to remove buckets from the new belt. Mr Davis knew that the Nepean crew had to take some weight off the belt, but he did not know how many buckets were on the belt before the lift (Tcpt 911//40).
Mr Patterson undertook a calculation of the number of buckets that needed to be removed by reference to weight of each bucket.
Mr Davis did not decide which buckets were to be removed and in what order.
Mr Davis did not observe the Nepean work crew or Mr Bennett taking buckets that had already been installed off the new belt.
After the buckets were removed there were 116 buckets in total that were not on the belt prior to it being lifted back into the EL13 chute.
No one informed Mr Gill of the decision to undertake the lift of the new belt with only half the buckets on the belt, and no-one told him that those buckets spaced were to be concentrated around the head roller.
I make the following findings of fact:
The lift of the new belt with 114 buckets and the head drum took place at around 11am.
Mr Davis observed the WGC crane lift the new belt with buckets and the head drum from the ground, when he was a distance away from EL13.
Mr Davis became aware that the Nepean work crew had removed buckets from the tail ends of the new belt, prior to the new belt being lifted in by the crane.
Mr Davis saw the belt still lying on the ground, and the tails of the belt did not have buckets on them (Tcpt 913/1-13).
Mr Davis saw that the Nepean work crew had folded the tail sections of the new belt, with no buckets, into an S shape. He saw this as the new belt was being lifted by the crane.
Mr Davis took a photograph of the belt being lifted into place by the crane at 11.08am. The photograph showed the new belt above the top of EL13, with buckets attached, but did not show those parts of the new belt where the buckets had been removed. By the time the photo was taken, the tails of the belt (with no buckets) had been unstrapped and had dropped into the chute.
Mr Davis sent this photograph to Mr Gill with a message, “Elevator has been dropped into casing and boys are currently doing head drum and coupling up”.
At around 1.15pm the Nepean work crew and Mr Bennett were involved in clamping the two ends of the new belt at the boot section of EL13. This was to be a temporary join. Mr Patterson sent photographs of this process to Mr Gill.
At 3.40pm Mr Davis informed Mr Gill via WhatsApp that the plan was to move the joint of the two ends of the belt from the bottom to the top of the head drum and finish the job for the day.
At 3.42pm Mr Gill sent a message on WhatsApp saying, “Be careful when stopping the bucket [sic: belt] as it may keep turning due to imbalance of buckets”.
At 3.42pm Mr Patterson responded to Mr Gill saying, “Yes we have [sic] ready to go”.
Mr Patterson did not ask Mr Davis what would prevent the belt from over rolling and going into free fall.
Mr Davis did not say to Mr Patterson that he would go to his engineers and find an answer.
Mr Davis did not come back to Mr Patterson and say that the engineers were happy that an inch brake would hold the belt once it was rotated.
No Boral engineer gave evidence that they had ever been asked by Mr Davis what would stop the belt from over rolling once the auxiliary motor was turned on and the belt was rotating.
Mr Ragg de-isolated the energy for EL13 and was directed by the Nepean work crew to start the auxiliary motor on EL13.
The ascending side of the belt started to move over the head pulley and down the descending side of the belt.
The mass on the descending side then exceeded the mass on the ascending side and through gravity the belt started free running out of control. The descending side of the belt rapidly moved over the head pulley and plunged to the bottom of EL13.
The energy in the fast rotating head pulley fed back into the gearbox turning it at a rapid speed.
In turn this rotated the fluid coupling at a speed many times more than its designated safe operating limit.
The fluid coupling exploded, sending shrapnel in the direction of the workers who were attempting to escape from Level 7.
Mr Bennett was struck by the exploding metal and suffered serious injuries.
“The risk was the risk to workers, in particular Messrs Bennett, Burgess, Ragg, Felix, Astil, Cox and Bevan, suffering serious injury or death as a result of being struck, hit, burnt or otherwise coming into contact with:
(a) failed, cracked or exploding components of the hydraulic coupling;
(b) failed, cracked or exploding components of the cover or guard for the hydraulic coupling; and/or
(c) hot hydraulic oil/fluid
whilst working in the vicinity of the conveyor belt of EL13 during the work.”
I find that the evidence clearly establishes the existence of this risk. It is not in dispute that the fluid coupling exploded as a consequence of rotating at 8 times its design speed, being driven by the conveyor belt going into free run. There was an explicit warning of the risk in the Voith Coupling Manual (PX11, Tab 118). A copy of this manual was held by Boral, and in any event, it was available to be downloaded. Further, the risk was identified in other material tendered in evidence (PX11, Tabs 117, 118, 119, 120).
The risk of the coupling being rotated at such a speed was a direct consequence of the belt going into free run. The risk that this would happen if the buckets were unbalanced was the subject of a specific warning in the Beumer manual sent by Mr Gill to Mr Davis, which was circulated again during the WhatsApp chat (PX7, Tab 56, p 2123). Mr Gill also warned of the risk in the WhatsApp exchange (PX7, Tab 56, p 2089).
The phrase “reasonably practicable” is defined in s 18 of the WHS Act. It requires the court to take into account and weigh up all relevant factors, including those listed in pars (a)-(e) in s 18.
I set out the findings of fact relevant to the matters which s 18 says should be taken into account.
I find the following facts:
The relevant risk was that pleaded in par 12 of the Amended Summons, being the risk to workers suffering serious injury or death as a result of being struck, hit, burnt or otherwise coming into contact with shrapnel generated by the explosion of the fluid coupling.
The fluid coupling had a design speed of 1500 rpm.
As a result of the conveyor belt going into free fall, and thus driving the coupling well past its design speed, the coupling rotated at approximately 13,000 rpm.
This was well above the design capacity of the coupling, and at that speed, it was foreseeable and indeed highly likely that the fluid coupling would explode.
The likelihood of that risk occurring was clearly expressed in the Voith Coupling Manual (PX 11, Tab 118) and in other material tendered in evidence (PX 11, Tabs 117, 118, 119, 120).
In turn, the risk of the coupling being rotated at such a speed was a direct consequence of the belt going into free run.
The risk that this would happen if the buckets were unbalanced was specifically stated in the Beumer manual sent by Mr Gill to Mr Davis, which was circulated again during the WhatsApp chat (PX 7, Tab 56, p 2123).
Mr Gill also warned of the risk of the belt going into free fall in the WhatsApp exchange (PX 7, Tab 56, p 2089).
In the light of those facts, I find that there was a significant likelihood that the fluid coupling might explode, if it was driven past its design speed by the conveyor belt going into free fall. I assess the likelihood of the risk prospectively and not retrospectively.
I make the following findings of fact on this topic:
The coupling accelerated way past its design speed so rapidly, that an explosion became imminent, within seconds of the belt going into free run.
Every witness described the noise being made by the coupling as “screaming” or “like a jet engine”.
Every witness said that as soon as the coupling started screaming, everyone was shouting “run”, and they all attempted to get down the ladder off the platform away from the coupling.
Flying shrapnel from an exploding coupling was going to cause death or serious injury to anyone who was struck by metal travelling at high velocity.
I make the following findings of fact in relation to what Boral knew of the risk:
There is no evidence that Mr Davis or anyone else from Boral turned their mind to, or recognised, the existence of the risk. I have indicated above my acceptance of the Boral submission that Mr Davis did not personally perceive or recognise the potential risk. However, both he and Boral should have, for reasons set out immediately below.
In relation to what Boral ought reasonably to have known I make the following findings of fact:
Mr Davis knew that the crane was lifting the belt back into the chute, with the two sides of the belt evenly draped over the head roller, and buckets attached to the top part of the belt near the head roller but with no buckets on the tails of the belt.
Mr Davis saw this happening. So did Mr Smith.
Mr Davis, having seen this, took a photograph, but at a point where the belt had been partly lowered into the chute.
Mr Davis observed that the buckets were not spaced evenly on the belt
Mr Davis knew, or ought reasonably to have known, from reading the Beumer manual sent to him, that the buckets had to be spaced evenly on the belt.
Mr Davis also knew this, or ought reasonably to have known this, from the warning being reiterated by Mr Gill during the WhatsApp group chat.
Mr Davis gave no evidence that he gave any thought to whether there was any means of safely rotating the belt with an uneven balance of buckets on the belt.
Mr Davis knew that the barring drive was going to be turned on, because he discussed that with Mr Patterson, and arranged for Mr Ragg and Mr Burgess to obtain the means of de-isolating the auxiliary motor with a view to turning it on and thus rotating the belt.
Boral ought reasonably to have known of ways of eliminating or minimising the risk, by having buckets evenly spaced on the belt before the barring drive was turned on. Had Boral followed its own written safety procedures, the Regulation, the Codes of Practice, or what employees other than Mr Davis said, the changed work process should have resulted in work stopping, a risk assessment being conducted and a new SWMS being created to perform the work on EL13 safely.
This would not have been a complicated process. All Boral, and indeed Nepean, had to do was to tell Mr Gill, the subject matter expert, that the plan was to rotate the join on the belt from the bottom of the chute to the top, with all of the buckets on one side of the belt but not the other. No doubt he would have been horrified. The PCBUs could then have asked Mr Gill how to perform this operation without risk.
Boral could then have told Nepean to create a new SWMS to take this change in work process into account. Boral could then have reviewed the new SWMS.
In relation to the availability and suitability of ways to eliminate or minimise the risk, I find the following facts:
Beumer had advised Mr Davis and Boral, by provision of the OEM Manual, that it was crucial that the buckets be spaced and balanced evenly on the belt.
This was reiterated during the WhatsApp chat by Mr Gill. Mr Davis was a participant in that chat and regularly engaged with others on WhatsApp.
Once it became obvious that the belt could not be lifted back in with all the buckets attached, the way to eliminate or minimise the risk was to stop the work, in accordance with documented Boral safety requirements (and the Codes of Practice), conduct a new risk assessment, create a new SWMS and do the work in a safe fashion.
These steps would and should have involved Mr Gill being fully informed as to the state of the buckets on the belt, and his advice being sought about how the work could be done in a fashion which would eliminate or minimise the risk.
Boral had retained Mr Gill to provide expert advice on how to do the work, which involved how to do the work safely.
I make the following findings of fact:
There would have been cost associated with eliminating or minimising the risk. The safe way to do the job, as evidenced by the recovery work, was to use clamps and to rotate the belt one bucket at a time, introducing new buckets via the access hatch on Level 3.
While this took several days, rather than just an afternoon, Boral was not under time or cost pressures in doing the work To do it safely and in accordance with its own safety procedures, Boral could and should have been willing to pay Nepean to do it in the way advised by Mr Gill, had he been consulted.
“16 More than one person can have a duty
(1) More than one person can concurrently have the same duty.
(2) Each duty holder must comply with that duty to the standard required by this Act even if another duty holder has the same duty.
(3) If more than one person has a duty for the same matter, each person—
(a) retains responsibility for the person’s duty in relation to the matter, and
(b) must discharge the person’s duty to the extent to which the person has the capacity to influence and control the matter or would have had that capacity but for an agreement or arrangement purporting to limit or remove that capacity.”
The meaning and operation of s 16 of the WHS Act was considered by Judge Scotting of this Court in SafeWork NSW v Poletti Corporation Pty Ltd [2019] NSWDC 491 and on appeal by the Court of Criminal Appeal in Poletti Corporation Pty Ltd v SafeWork NSW [2020] NSWCCA 243.
The background facts in Poletti are as follows. A painter fell 6 metres through a void between the building and an upper platform of a five-level jumpform screen system. Poletti was a subcontractor engaged to design, install and operate the jumpform screen system. Poletti contracted with Sureform to design and supply the components of the system. The painter was employed by another subcontractor.
Poletti acknowledged that it was to have “control over all aspects of the execution of the Subcontractor Works and safety issues at the Site” per the subcontract with the principal contractor.
The screens were hydraulically “jumped” approximately each week on completion of a level of the building. When the jump was completed a representative of Poletti would inspect the bottom level of the finishing screens but did not inspect the upper levels. The representative would then advise the principal contractor that the jump was complete. Then the principal contractor would advise the finishing trades that they could resume their work.
In the primary judgment Judge Scotting did not accept the defendant’s argument that it did not have control of the finishing screens after they were handed over to the principal contractor. [154]
Judge Scotting found as follows at [155]:
“…The defendant sub-contracted the design of the system to Sureform, but that did not alleviate its duty to ensure, so far as was reasonably practicable, that the design of the system was fit for the purpose for which it was required by [the principal contractor]…”
“It was an obvious observation to make as a part of his consideration of the extent of Poletti’s duty, or at least as a precursor to that consideration.”
“…the fact that [the principal contractor] had a concurrent duty to the workers using the finishing screens is irrelevant… the fact there were discussions between [the principal contractor] and the defendant or approval by [the principal contractor] of the design put forward by the defendant does not demonstrate an inability of the defendant to control the configuration of the work platforms.
The defendant had sufficient control over access to the system to prevent workers using the work platforms until they were made safe. …The defendant was only required to exclude the workers until remedial steps could be taken to make the work platforms safe.”
“…the fact [the principal contractor] may have had (or in fact, did have) a concurrent duty did not relieve Poletti of any duty that it had. Again that was an obvious and correct observation to make as a part of his consideration of the extent of Poletti’s duty. Appropriately, his Honour then addressed the issue to which s 16(3)(b) gave rise (as to the “extent to which the person has the capacity to influence and control the matter”). In a factual finding that is not challenged in this appeal, he concluded that Poletti did have such control.”
The Boral “Risk Management” document (PX 8, Tab 65), which is discussed above, requires the Operations/Site Manager or Supervisor to monitor and evaluate risk controls. This includes reviewing risk assessments when new hazards are identified or significant changes to plant, processes or people occur (par 3.1.4).
The Boral “Communication and Consultation” document (PX 8, Tab 66), discussed above, says that toolbox talks should be held when changes occurred in the working environment (par 2.3.6).
The Boral “Safe Systems of Work” document (PX 8, Tab 67), discussed above, says that when an individual or a work crew is performing work and the work conditions change, or an additional hazard is identified, then the work must stop and an on the job assessment and discussion is to be completed with all relevant workers, supervisors and/or managers. Any work document is to be amended to reflect the change (par 2.08.10).
The Code of Practice “How to manage work health and safety risks – August 2019” (PX 10, Tab 109), discussed above, refers in Section 1 to consulting, cooperating and coordinating activities for the duty holder. It says, “Never assume that someone else is taking care of a health and safety matter”.
Section 5 of the Code deals with how to review controls which are in place. It says that control measures should be reviewed regularly to make sure they work as planned by “a person conducting a business or undertaking”. It also says, “Don’t wait until something goes wrong”.
Section 5 also says that a review is required, inter alia, before a change at the workplace that is likely to give rise to a new or different health and safety risk, that the control measure may not effectively control.
The Code of Practice “Managing the risks of plant in the workplace – August 2019” (PX 10, Tab 110), discussed above, says in Section 1.3 that a systematic process for managing risks associated with plant requires a review of control measures to ensure that they are working as planned.
The Code of Practice “Work health and safety consultation, cooperation and coordination – August 2019” (PX 10, Tab 111), discussed above, says in Section 1.2 that gaps in managing health and safety risks occur when duty holders assume someone else is taking care of the health and safety matters.
It also says in Section 5 that a PCBU may ensure the outcomes by not necessarily taking the required action itself, but by making sure another person is doing so.
The Code says in Section 6 that effective consultation with other duty holders requires, inter alia, a review of control measures.
This contract (PX 2, Tab 19), discussed above, said that Nepean had to conduct its activities “in accordance with the relevant Boral procedure”. This included an Authority to Work permit (Pt B, cl 2.8).
The agreement also said that Nepean had to comply with all applicable Boral Group policies and procedures, including those relating to health and safety, and all other reasonable directions given by Boral in relation to performance of the work (Pt C, cl 4.1).
The contract obliged Nepean to undertake and document an assessment of the risks associated with provision of the services, and to take all steps necessary to address any issues identified in such assessment “including those reasonably requested by Boral” (Pt C, cl 4.2).
The ATW permit relevant to these proceedings (PX 8, Tab 72 and PX 8, Tab 73) stated that a new ATW permit had to be issued if there were any changes to the scope of works or the method of works.
The evidence is that Mr Davis signed the ATW permit on the first day of work (9 February 2022) under the heading “Authorised Work Controller”. One of the things he certified by signing was that there were no changes in the hazards associated with the scope of the work, since the work commenced. Mr Davis signed again on 10 February, 11 February, 12 February and 13 February 2022. Inter alia, he was certifying that there had been no changes in the hazards associated with the scope of the works.
This was plainly wrong. There were changes to the proposed method of work, arising on 9 February 2022 when the crane could not lift out the belt with all buckets attached, in one go. This flowed through to 13 February 2022, when the crane was to lift the unbalanced new belt back in. The changes in the work process from those originally proposed should have led to Boral following its own documented procedure. Work should have stopped, there should have been a new risk assessment and there should have been a new SWMS.
Mr Smith said that if the scope of the work changed, everyone was supposed to fill in another ATW permit. If the way that the work was to be executed changed, that had to be indicated on the ATW permit.
Mr Smith also said that if there was a change to the planned work, then the service provider and the work controller should do another risk assessment, have a stop meeting and discuss it with all the workers.
Mr Smith said that if there was a change or addition to the planned work, then there might have to be a change to the SWMS.
Mr Latham said that if there was a change in the process of a job, the ATW controller should be contacted. Alterations should be made to the SWMS if there was a change in the process of the job.
In his evidence Mr Davis said many times that once he reviewed the initial SWMS on 9 February 2022, for the purpose of Nepean obtaining an ATW permit, it was thereafter the job of Nepean, without oversight by Boral, to conduct a risk assessment and update a SWMS if the work process changed so as to give rise to a new safety hazard.
It must be recognised that in this case Boral engaged two specialist contractors. Mr Gill from Beumer was engaged to provide expert supervision of the entire process conducted in relation to EL13. Beumer was the OEM and Mr Gill was the subject matter expert. I accept that Boral did not have the expertise to safely manage the EL13 work. It was prudent of Boral to engage Mr Gill to provide such expertise. There is no criticism made in this case of the guidance and advice provided by Mr Gill.
Nepean was engaged as a specialist engineering contractor to perform the work on EL13. Nepean was provided with the Beumer documentation, which contained a plain warning that the belt should not be reinstalled with the buckets out of balance. This was reiterated to Nepean and to Mr Davis, by Mr Gill making such a statement in the WhatsApp group chat. Those matters have been set out in detail above.
A common theme of the evidence of Mr Davis was that once he set Nepean on its course by approving the initial version of the SWMS, he had no further responsibility to check that the work was being done safely, as that was entirely the responsibility of Nepean. Part of the gist of his evidence was that it was the sole responsibility of Nepean to recognise risks and safety concerns arising from any changed work process, and to take steps accordingly to control such risks and hazards.
The principles concerning whether a party with a health and safety duty can leave it to someone else to carry out that duty are set out above. The question of control over the contractor is relevant to the determination of what is reasonably practicable. Section 16(3)(b) of the WHS Act requires the court to consider “the extent to which the person has the capacity to influence and control the matter”.
On the facts in this case, Boral had a significant degree of control over how Nepean carried out the work. That is not to say that Boral had to stand over Nepean’s shoulder and watch everything that it did. However, the contract by which Boral engaged Nepean, and the Boral safety documentation, both said that the contractor (Nepean) had to follow the documented Boral safety procedures and any reasonable directions from Boral.
I accept that Mr Davis had a very busy and onerous job during the shutdown. He had to monitor the activities of dozens of independent contractors who were performing disparate tasks across a large industrial site. He could not be everywhere at once and he could not attend every toolbox talk. Nor could he stand by and watch every second of work done by a contractor. However, his evidence was that he had an overview of the work being done. His participation in the WhatsApp group from time to time showed that he was monitoring the EL13 work, not only by looking at it from time to time on his walk-around, but also by talking to Mr Patterson.
I find that the notion that once Nepean started its work, it should be left to be entirely responsible for safety issues and the management of risks, is misconceived. I find that Boral continued to have a duty under the WHS Act to do what was reasonably practicable to ensure safety. Boral did not necessarily have to form its own judgment as to whether the new belt with the unbalanced buckets posed a hazard. All it had to do was follow its own documented processes, what was in the Codes of Practice and cl 38 of the Regulation, and which was known to several Boral employees who gave evidence – if there was a change in the work process, work had to stop, a risk assessment had to be performed and a new SWMS created if that was necessary.
If Boral had asked for this to happen, then the result would have been that Mr Gill would have been fully informed about the state of the belt and the buckets, and he would have given advice, no doubt strong advice, that the work should not be done that way. Mr Gill would then have devised a safe system for performing the work and advised Boral accordingly.
That is not to say that Nepean did not have significant duties under the WHS Act. It did. It too should have followed the Boral safety procedures, as it was obliged to do by its contract.
These findings are relevant not only to Element 3, but feed into Element 4 which is discussed below.
“a. installing, or taking steps to confirm Nepean installed, the new belt of EL13 without any buckets mounted to it and then subsequently mounting buckets after the belt was joined”.
This method was the method set out in the Beumer manual provided to Mr Davis and in turn provided to Mr Patterson. It was a method which had been used on Boral elevators on other occasions. Obviously it would eliminate the risk which was present in this case, as the new belt would be mounted over the head roller and the tail roller and joined without any buckets attached. Providing that the buckets were then introduced to the belt in a balanced fashion, the risk would not arise.
The problem with this pleaded particular regarding the method of installation is two-fold. Firstly, it involves purely hindsight reasoning. Secondly, since Boral had large cranes on site, Mr Davis wanted to use a crane to lift the belt with all of the buckets attached out of the chute, and to reinstall it in the same fashion. He specifically raised this with Beumer before the job started and was told by Beumer, the subject matter expert and the OEM, that they had done it this way in the past. Photographs were provided by Beumer to indicate just how it should be done. There was nothing said by Beumer to indicate the “crane lift” method should not be done that the “no bucket” installation method was preferable to the “crane lift” method. In effect Beumer endorsed the proposal of Mr Davis to use the “crane lift” method.
I find that SafeWork has not established that the measure pleaded in par 13(a) of the Amended Summons was one which Boral should have taken.
“(c) In the alternative to (a) above, where some buckets are mounted to the conveyor belt of EL13 prior to it being joined, providing, maintaining and implementing, or taking steps to confirm that Nepean was providing, maintaining and implementing, a safe system of work for the work, which involved:
i. confirming the buckets are mounted and distributed evenly on the belt so that the belt is in balance;
ii. until the belt is in balance, not directing or permitting the bump starting or inching or barring of the belt; and/or
iii. identifying that the guard for the fluid coupling was not designed nor suitably constructed to contain parts of the coupling in the event of a catastrophic failure;”
It is to be noted that the particular does not allege that Boral had to do the work in this fashion, but rather that Boral had to confirm that Nepean was providing, maintaining and implementing a safe system of work, which involved, broadly speaking, the buckets being mounted in balance on the belt.
As recited above, I have found that Boral should have followed its own processes, stopped work, and required a risk assessment and a new SWMS. Had it done so, Mr Gill would have provided appropriate advice and Nepean would have adopted a safe system of work. Boral had the power, and as I have found the duty, to require Nepean to follow the Boral safety documentation, the Codes of Practice, and the industry practice (as stated by several Boral employees in their evidence).
I find that SafeWork has established that the measure pleaded in par 13(c) of the Amended Summons was one which Boral should have taken.
“d. In the event paragraph 13(c) above is followed, preparing and enforcing a safe work method statement (SWMS), or taking steps to confirm that Nepean has prepared and enforced a SWMS, for the work on EL13 which included the steps identified at 13(c) above;”
As recited above, I have found that Boral should not have required a partial SWMS to be created on 9 February 2022, and then never looked again to see whether the SWMS was being updated. I have also found that once the work process changed, Boral should have required a new SWMS for the EL13 work which was being conducted in a fashion different to that initially proposed and initially dealt with in the 9 February 2022 partial SWMS.
I find that SafeWork has established that the measure pleaded in par 13(d) of the Amended Summons was one which Boral should have taken.
“e. Following the instructions, or making enquiries to confirm Nepean and/or Fenner was following the instructions, for installation in the Beumer Group Bucket Elevator Installation Instructions sections 5.3.8 and 5.3.9 of document BA-619080046-en dated 2019-08-05, namely, how to mount the buckets to ensure the belt in balance;”
It is really s 5.3.9 of the Beumer document (PX 7, Tab 56, p 2123) which deals with how to mount the buckets. This part of the Beumer Elevator Installation Instructions starts with a “WARNING” and clearly says that the buckets should be distributed evenly on the belt and mounted so as to ensure that the belt is in balance.
Once again it is to be noted that SafeWork does not allege that Boral should have done this, but it should have made inquiries to confirm that Nepean and/or Fenner was following these instructions. I find that it was a duty of Boral to check that Nepean and/or Fenner were carefully and safely performing the work. Mr Davis was well aware of the change in work process, since he knew the belt had to be cut in two to get it out of the chute, and he knew the belt was being lifted back in with some but not all the buckets, attached in an unbalanced fashion.
Boral’s own documented safety procedures, the Codes of Practice, and knowledge in the industry (as demonstrated by evidence of other Boral employees) meant that the work should have stopped, a risk assessment should have been performed and a SWMS should have been created to enable the work to be performed safely. Mr Davis and Boral did not have to do those things themselves, but they did have to take steps to confirm that Nepean did those things. As the Codes of Practice said more than once, a PCBU cannot simply assume that someone else will take care of safety.
I find that SafeWork has established that the measure pleaded in par 13(e) of the Amended Summons was one which Boral should have taken.
“f. Confirming that the conveyor belt was in balance before removing, or permitting the removal of, the isolation locks for EL13;”
This is just another way of expressing the allegation that Boral should have followed its own procedures, made sure the work stopped, a risk assessment was performed and a new SWMS was created. Undoubtedly Mr Gill would have said, if fully informed, that the isolation locks should not be removed from EL13 before the conveyor belt was in balance.
I find that SafeWork has established that the measure pleaded in par 13(f) of the Amended Summons was one which Boral should have taken.
“g. Using, or taking steps to confirm Nepean were using, chain blocks to control the conveyor belt of EL13 as it was rotated to prevent free running;”
Mr Gill gave evidence that if he had been told that the belt was lifted into the conveyor chute with some but not all of the buckets attached, he would have given advice that chain blocks could have been used to safely rotate the belt and install buckets to balance it (Tcpt 721/5-19, reproduced above).
Again, such advice would have been obtained if Boral had followed proper procedures (including its own) and stopped the work, required Nepean to conduct a new risk assessment and create a new SWMS. This would necessitate consulting Mr Gill and obtaining his advice about how the work could be done safely.
I find that SafeWork has established that the measure pleaded in par 13(g) of the Amended Summons was one which Boral should have taken.
There are two problems with this assertion by SafeWork. The first is that it was not a step advised by Beumer to Boral or Nepean. Indeed, if the work was done in a safe fashion, as outlined by Beumer with all of the buckets balanced on the belt, there would have been no need to uncouple the fluid coupling and the main drive motor.
Secondly, the suggestion that the coupling should have been uncoupled is one made purely with hindsight. It assumes that even if the wrong method was adopted by Boral and Nepean and the belt over ran, but the fluid coupling was not coupled up to the head roller, there would have been no over speed of the coupling and no explosion. That is so, but it is entirely a theoretical construct which was not advised by Beumer, and which was not necessary if a proper means of rotating the belt was adopted.
I find that SafeWork has not established that the measure pleaded in par 13(h) of the Amended Summons was one which Boral should have taken.
“i. Implementing and enforcing a requirement that where a change in work process is identified which may lead to new potential hazards or risks during the work, that work is stopped and an updated risk assessment is conducted to identify the appropriate controls/measures to address potential hazards or risks and implementing the most effective risk control measures to address those hazards or risks;”
Boral had such a requirement in place. It was part of its documented safety system and has been recited above. Instead of implementing and enforcing its own process to be followed when there was a change in the way work was being conducted, Boral did nothing. It should have simply followed its own procedure by requiring Nepean to stop, conduct a risk assessment and create a new SWMS. Boral would then have been required to review the risk assessment and the SWMS, and against the background of those improved documents, issue a fresh ATW permit.
I find that SafeWork has established that the measure pleaded in par 13(i) of the Amended Summons was one which Boral should have taken.
Paragraph 13(j) of the Amended Summons pleads that either Boral should have consulted with Mr Gill or Boral should have confirmed that Nepean had done so.
Mr Davis was part of the WhatsApp chat group so he had as much access to Mr Gill as anyone else, including Nepean. Boral had received the Beumer Manual well prior to the work starting and Mr Davis had read it. He had therefore read that the belt had to have its buckets in balance before it was rotated and that there was a risk involved if the buckets were unbalanced. Mr Davis had proposed the method of lifting the belt with all of its buckets attached out of the chute and back into the chute. When the work process changed, Boral (and also Nepean) did not inform Mr Gill of the change in process or seek his advice about whether it was safe to perform the work in a different fashion. Both Boral and Nepean should have taken these steps.
I find that SafeWork has established that the measure pleaded in par 13(j) of the Amended Summons was one which Boral should have taken.
I find that this measure has not been established on the facts. The evidence above of concerns raised by various Nepean workers with Mr Patterson, which I accept, shows that he was advised of their concerns. I have set out above my reasons for rejecting the evidence of Mr Patterson that he took these concerns to Mr Davis and that Mr Davis responded to them with an assurance that the inch brake would hold the belt. On the findings I have made, the concerns raised by various Nepean workers were never conveyed to Mr Davis.
I find that SafeWork has not established that the measure pleaded in par 13(k) of the Amended Summons was one which Boral should have taken.
The relevant question on causation is not whether the failures of the defendant were the cause of the injuries to Mr Bennett, but whether the acts or omissions of Boral were a substantial or significant cause of the workers being exposed to the risk of injury: Bulga at [127], [130].
That question must be considered in the light of the objects of the WHS Act and the provision contained in s 19(1), namely to ensure the health and safety of workers: Bulga at [129]-[130]. The fact that third parties (in this case Nepean and Fenner) missed opportunities to eliminate the risk in question does not mean that the court is precluded from finding that Boral’s failure substantially contributed to the risk: Simpson Design at [117].
The Court of Criminal Appeal considered the issue of causation in Grasso. In that case the defendant was an engineer who was asked to give advice concerning the appropriate method for the demolition of a large building. The defendant made handwritten calculations only and did not run a computer model, which was available, to check its calculations. The trial judge found that the element of causation was established.
The Court of Criminal Appeal allowed the appeal in relation to causation and quashed the conviction. The basis upon which the court did so is best expressed by Simpson AJA at [2] as follows:
“I agree, for the reasons given by Cavanagh J, that each appeal succeeds on the issue of causation. Grasso Consulting Engineers Pty Ltd (‘GCE’) gave relevant advice, specifically in the certificates of 11 February 2016 and 9 March 2016. Had that advice been acted upon and had the roof collapsed, GCE and Mr Grasso may have been held liable for the exposure of individuals to risk of injury, those individuals including Messrs McClutchie and Hayward. However, as the advice given by GCE was not acted upon and different instructions were given to the demolition workers, the chain of causation was severed. It was not any failure on the part of GCE or Mr Grasso that exposed the demolition workers to the risk of injury; it was the decision to demolish in accordance with the plan prepared by Mr Arnold. I agree, therefore, that grounds 4 and 5 must be upheld.”
“I further agree with his Honour that grounds 4 and 5 of the appeal should be upheld with respect to the issue of causation, essentially upon the basis of the conclusions reached by Cavanagh J that there were too many intervening events or factors to permit the finding that the way in which Mr Grasso depicted his advice diagrammatically without additional words was a substantial and significant cause to the demolition workers being exposed to a risk of death or injury whilst they were undertaking demolition work. Further, there was an absence of evidence as to how and why a failure to undertake computer modelling constituted a substantial cause of the risk to which the workers were exposed at the time the risk materialised.”
“229 In this matter the question of causation arises for the purposes of attributing blame in the criminal context. The Court is assessing causation for the purposes of assessing whether a criminal sanction should be imposed on a person.
230 As was said in Bulga, the question is whether the acts or omissions which ground the finding of non-compliance with the duty were a significant or substantial cause of the risk to which the individual was exposed.
231 It is not sufficient that the conduct be a cause. It must be a significant or substantial cause. The use of such language tends to emphasise the importance of the conduct of the duty holder to the exposure which ultimately happened, although there may still be more than one significant cause.
232 Exposure to risk at the workplace is often multi-factorial. It is not necessary to establish that the conduct was the most important or the most significant causal factor provided it was a significant or substantial cause.
233 This is not a theoretical exercise. There must be a sufficient connection between the conduct and the individual actually being exposed to a risk.
234 Further, it is necessary to establish a causal connection between the failure/conduct and the employee (person) being exposed to the risk at the time the work was being performed (in this matter whilst the demolition workers were demolishing the roof).
235 In addressing causation, it is necessary to consider the events which actually occurred. The Court is not considering the conduct from the perspective of the duty holder when that person performed the work, that is, prospectively. The Court does that when assessing breach, i.e. whether the other persons were put at risk.”
“241 The onus was on the respondent to establish causation. The respondent could not do so without establishing that the failure to undertake computer modelling exposed the demolition workers to a risk to their health and safety whilst they were undertaking their demolition work.
242 It is conceptually difficult to understand how this could be when the demolition workers were not following GCE advice and there is no evidence as what the computer modelling of the GCE sequencing advice would have shown.
243 In my view, in accepting the causal connection between the failure to undertake computer modelling and the workers being exposed to a risk to their health and safety, the trial judge erred in considering the causation question through the prism of what GCE did at the time of breach rather than how its work exposed the workers to a risk at the time they were doing the demolition work.”
The failure to undertake the reasonably practicable steps which should have been taken by Boral exposed the workers on EL13 to a risk to their health and safety. Given my findings that Boral should have become aware of the risk, and the simple and effective reasonably practicable means available to it to ensure safety, I find that the breach of duty by Boral was a significant or substantial contributing factor to the risk.
If the work had been stopped, if a proper risk assessment was carried out which identified appropriate control measures, and if a new SWMS been developed to take account of the change in work process, Mr Gill could have advised a new method of work to eliminate the risk of the belt going into free run, leading to the explosion of the fluid coupling. I have found that it was the duty of Boral to take these steps, a duty which it had even though Nepean and Fenner had parallel duties.
The breach of duty by Boral, which was essentially a failure to take responsibility for continuing safety by following its own procedures, was a substantial or significant cause of the workers being exposed to the risk.
I am satisfied beyond reasonable doubt that the breach of safety duty by Boral exposed workers to a risk of death or serious injury.
I find that the defendant Boral committed a Category 2 offence pursuant to s 32 of the WHS Act because:
Boral was a person conducting a business or undertaking.
Boral owed the workers a duty under s 19(1) of the WHS Act.
Boral failed to comply with that duty.
The failure exposed the workers to a risk of death or serious injury.
I find the offence set out in the Amended Summons dated 28 October 2025 proved beyond a reasonable doubt.
I will hear the parties on sentence.
The orders are:
The elements set out in the Amended Summons dated 28 October 2025 have been proved beyond reasonable doubt.
I find the defendant Boral Cement Limited guilty.
The matter will be listed for mention on 13 April 2026 at 9-30am to set a date for a sentence hearing and any costs issues.
**********