[2024] QPEC 42
General information, not legal advice.
Planning and Environment Court of Queensland
2024-09-20
Original judgment source is linked above.
PLANNING AND ENVIRONMENT - APPEAL - appeal against a decision to refuse an 18 storey mixed use development in the Centre zone - where development exceeds the height prescribed in a Building height overlay map in the respondent's planning scheme - whether a building height uplift provision in the respondent's planning scheme is complied with - whether the development will have unacceptable traffic safety impacts - whether the development complies with the respondent's planning scheme - whether the discretion should be exercised in favour of approval or refusal.
Abeleda v Brisbane City Council [2020] QCA 257; (2020) 6 QR 441
Brisbane City Council v YQ Property Pty Ltd [2020] QCA 253; [2021] QPELR 987
Catterall & Ors v Moreton Bay Regional Council & Anor [2020] QPEC 52; [2021] QPELR 850
Dajen Investments & Anor v Council of the City of Gold Coast & Anor [2023] QPEC 32
Wilhelm v Logan City Council & Ors [2020] QCA 273; [2021] QPELR 1321
Trinity Park Investments Pty Ltd v Cairns Regional Council & Ors; Dexus Funds Management Ltd v Fabcot Pty Ltd & Ors [2021] QCA 95; [2022] QPELR 309
Planning Act 2016, ss 45, 59 and 60
Mr T Matthews KC with Mr M Campbell for the co-respondents by election
(a) is level and rectangular in shape;
(b) comprises two contiguous lots with a total area of 1,230 m2;
(c) has two driveways;
(d) is improved with built to boundary single level commercial buildings that have a gross floor area of 1,070 m2;
(e) is improved with a large electronic billboard (advertising device) mounted on top of one commercial building, facing the signalised intersection at Gold Coast Highway/Palm Beach Avenue: Ex. 5.03, p. 25;
(f) has no significant vegetation; and
(g) is not burdened or benefitted by any easements.
(a) a new 39 metre high tower and podium design has been constructed on the corner of Seventh Avenue and Cypress Terrace, and can be seen popping up above the roofline of the district centre on its western edge;
(b) Fifth Avenue at its eastern end (approaching the Gold Coast Highway) presents the most cohesive section of streetscape within the centre - this is due to a combination of street trees within the verge and activated building frontages; and
(c) an existing two storey commercial development along the southern edge of Eighth Avenue presents a coherent activated frontage to the footpath.
(a) the road is classified as a sub-arterial road located at the midpoint of the district centre;
(b) the road has a different function to the other Avenues within the district centre - it provides access to the Pacific Motorway (M1);
(c) the road is greater in width than the other Avenues in the district centre, accommodating a row of central parking with intermittent landscaping; and
(d) the road extends to the east of the Gold Coast Highway, providing access to the beach.
"21 The proposed 18 storey development will have a total height of 58.5m comprised of a 5-storey podium and a 13-storey tower. Four basement levels will accommodate car parking (refer to Figures 17 and 18 below).
(a) the built form is aligned with the boundaries of the site, parallel to the Gold Coast Highway and Palm Beach Avenue. This alignment, as demonstrated by the photomontages, positively contributes to the legibility of the orthogonal street layout. It reinforces the corner of the intersection of the Gold Coast Highway and Palm Beach Avenue, which is an important urban element for the district centre;
(b) the built form is designed to activate two street frontages in different ways. Access is provided for pedestrians and vehicles (left in-left out only) from Palm Beach Avenue to the proposed hotel's porte-cochere and basement parking (108 equivalent carparking spaces). No vehicle access is permitted from the Gold Coast Highway (condition 5, Amended referral agency response (Ex. 4.03)). Access from this frontage is limited to pedestrians. A pedestrian entrance to the ground floor is provided via an oversized door at the corner of the Gold Coast Highway and Palm Beach Avenue. This, again, reinforces the prominence of the corner. In the context of access and activation for the development as a whole, an examination of the design for both road frontages makes good Mr Curtis' point that:
"Except for the fire egress and substation, the east facing Gold Coast Highway frontage and the north facing Palm Beach Avenue frontage are almost fully visually permeable and activated by the porte-cochere that functions as the hotel's 'Grand entrance' and the adjoining restaurant/bar."
"The porte-cochere, lobby and restaurant/bar are all accommodated within a double height space that reinforces the hotel's visibility and presence at the corner of the intersection. A feature staircase within the double height space connects the ground floor to a foyer on the third storey (Level 02) that provides access to a function space foyer and day-spa. Containerised landscaping extends around the north and east facing sides of the floor plate to provide an elevated vegetated edge to the street frontages."
(a) the ultimate decision called for when making an impact assessment under ss 45 and 60 of the Act is a 'broad, evaluative judgment';
(b) in contrast to its statutory predecessor, the discretion conferred by s 60(3) of the Act admits of more flexibility to approve an application in the face of non-compliance with a planning scheme;
(c) the exercise of the discretion under s 60(3) of the Act is subject to three requirements, including that it be based upon the assessment carried out under s 45; and
(d) the Act does not alter the characterisation of a planning scheme - it remains a reflection of the public interest.
"(12) District centres support a mix of employment activities as well as other population needs related to goods and services. They are limited in size and intensity to serve the 'employment precinct' role provided by the higher order mixed use centres - central business district, principal centres and major centres. More intensive development activity is focused in these higher order mixed use centres.
(13) District centres provide a range of retail, office and employment land uses and some community and civic services for a catchment of between 20,000 and 40,000 people and are intended to provide around 3,000 jobs. Services include:
(a) entertainment and recreational facilities (including cinemas);
(b) primary, secondary and limited tertiary education facilities;
(c) State or City of Gold Coast services and facilities;
(d) health services;
(e) community facilities;
(f) professional services;
(g) subregional retail facilities including a discount department store (in some district centres where there is an economic need), full-line supermarkets and specialty supporting retailing;
(h) secondary retailing, including bulk retailing automotive retailing and service stations; and
(i) visitor accommodation."
"(21) Palm Beach is an integrated, mixed use centre comprising shopping, residential accommodation, eating, entertainment, community and ancillary services for residents and tourists."
"(4) The Building height overlay map shows the desired building height pattern and appearance for mixed use centres and specialist centres. This map also shows areas where building heights change abruptly to achieve a deliberate and distinct contrast in built form within and between low, medium or high-rise areas."
(ii) has a building height that does not exceed that indicated on the Building height overlay map;
"(5) Increases in building height occur in mixed use centres and specialist centres where all of the following outcomes are satisfied:
(a) a reinforced local identity and sense of place;
(b) a well managed interface with, relationship to and impact on nearby development, including the reasonable amenity expectations of nearby residents;
(c) a varied, ordered and interesting local skyline;
(d) an excellent standard of appearance of the built form and street edge;
(e) housing choice and affordability;
(f) protection for important elements of local character or scenic amenity, including views from popular public outlooks to the city' significant natural features;
(g) deliberate and distinct built form contrast in locations where buildings heights change abruptly on the Building height overlay map; and
(h) the safe, secure and efficient functioning of the Gold Coast Airport or other aeronautical facilities."
(a) s 3.3.2.1(9), unlike s 3.4.4.1(5), provides that increases in building height may occur in 'limited circumstances'; and
(b) s 3.3.2.1(10) states a policy position for which there is no analogue in s 3.4.4.1, namely it makes clear that increases in building height beyond 50% are not anticipated in urban neighbourhoods - no equivalent policy statement is made in relation to mixed use centres.
"There are few other locations on the Gold Coast like the villages of Palm Beach, Currumbin and Tugun. Visitors travel from far away to enjoy the outdoor low-key lifestyle still available in this unique part of the Gold Coast.
Palm Beach has been a suburban, low to medium rise residential area for nearly 100 years successfully preserving its village atmosphere. The Centre District, which is the lowest in the hierarchy of centres under the City Plan, is characterised by small boutique shops, cafes, restaurants businesses and local services. The Palm Beach shopping precinct incorporating Coles, a butcher, liquor outlet, pharmacy and other speciality shops is single level."
(a) whether the proposed development complies with the uplift provision;
(b) whether the proposed development gives rise to unacceptable traffic impacts, including safety impacts; and
(c) whether the proposed development should be approved or refused having regard to relevant matters nominated by the parties, including need.
Does the development comply with the uplift provision?
Subsection (a): a reinforced local identity and sense of place
"An assessment of the character of an area should be considered broadly, and fairly. Subject to the requirements of the adopted planning controls, this means it is an assessment that should be informed by not only existing character, but also: (1) an objective reading of the adopted planning controls to ascertain whether existing character is intended to remain unaltered or, like here, intended to change over time; and (2) extant development approvals granted in the relevant area by an assessment manager, but not yet acted upon."
(a) the nature and intensity of the uses proposed are anticipated in the district centre and do not give rise to any adverse town planning consequences;
(b) the design of the built form (described in paragraphs [41] to [48] and depicted in the photomontages, architectural plans and landscape plans), which is articulated, modulated, detailed and visually interesting;
(c) the design and siting of the built form (described in paragraph [40] and depicted in the photomontages, architectural plans and landscape plans) will help define the intersection of the Gold Coast Highway and Palm Beach Avenue as the 'centre of the centre'; and
(d) the height of the built form, considered in its proper context, will reflect the desire expressed in the planning scheme for the building height profile within the centre to be taller than surrounding development on land in the Medium density residential zone - consistency, in a qualitative sense, with this desire reinforces the importance of the district centre as well as contributing to its legibility.
(a) the built form will be attractive, high-quality and visually appealing;
(b) the built form will have varying setbacks, distinct forms and visually interesting changes in materials to modulate bulk and fragment the continuity of building height;
(c) the built form and proposed uses will enhance and strengthen the street frontage (urban edge) through the provision of active uses, the maintenance of a pedestrian scale (see (d)) and the presence of visually interesting building materials and colours;
(d) the built form incorporates design features (awnings and overhead cover) that maintain an appropriate relationship (human scale) at pedestrian level;
(e) the built form incorporates architectural treatments on the southern and western facades that serve to soften the bulk and height of the building in advance of future development on adjoining land;
(f) the built form complies with performance outcomes PO4 and PO5 of the High-rise accommodation design code (the HRADC); and
(g) the bulk of the built form is comparable to development on the eastern side of the Gold Coast Highway, including the new residential development constructed directly opposite the site on the south-eastern corner of the intersection of the Gold Coast Highway and Palm Beach Avenue - a review of the visual aids reveals this building, which will be wider than the proposed development on its western side, presents substantial building bulk and height to Palm Beach Avenue and the Gold Coast Highway.
(a) open, attractive and distinct skyline;
(b) small, fast moving shadows;
(c) view corridors between nearby towers;
(d) efficient interior climate control; and
(e) balconies as an extension of indoor living spaces.
Tower floor plate is limited to 750m2 per tower (includes all services, lift and stairwell annex, etc.)
Note: Balconies are excluded from calculations to encourage larger private outdoor space areas.
Tower form provides a unique profile when compared to nearby existing and proposed towers of similar height.
"Where they occur (in accordance with zone intentions), podiums are designed to engage with the street and be of a scale that is complementary to adjoining and nearby buildings."
Where podiums are envisaged by the zone, tower base form respects the framework of established built form, adjacent streets, parks and public or private open spaces.
(a) are well-proportioned to frame adjacent park land and on-site open space;
(b) match neighbouring low-set built form; or
(c) are no greater than 10.5 metres in height where no neighbouring low-set built form exists.
(a) match adjacent established setbacks; and
(b) continue public open space areas provided along street frontages.
"For development where the density exceeds that shown on the Residential density overlay map, housing is provided at a form, scale and intensity that is appropriate for the zone and each particular locality it is in where the following outcomes are satisfied:
(v) whether intended outcomes for building form/city form and desirable building height patterns are negatively impacted, including the likelihood of undesirable local development patterns to arise if the cumulative effects of the development are considered;
(vii) whether adjoining residential amenity is unreasonably impacted;
(viii) achievement of a high quality urban design through highly functional, accessible, attractive, memorable and sustainable buildings and public works;"
Subsection (b): a well-managed interface with, relationship to and impact on nearby development, including the reasonable amenity expectations of nearby residents
(a) the key interface points for the development are coincident with the southern and western facades and the podium's connection to adjoining development;
(b) the southern and western facades have been designed to provide an architecturally interesting response that awaits redevelopment on the adjoining site, namely the Palm Beach Hotel - the photomontages demonstrate this design response is a meritorious one, resulting in a well-managed interface;
(c) the podium design complies with PO1 of the HRADC, which requires the base of the development to, among other things, respect the framework of the established built form (see paragraph [123]);
(d) the podium facades comply with PO2 of the HRADC, which requires the base of the tower to reinforce the intended neighbourhood character and enhance the pedestrian experience (paragraph [124]);
(e) the tower design complies with PO4 of the HRADC, meaning it is a slender tower form that promotes an open, attractive skyline and provides view corridors between towers (see paragraphs [103] to [104]);
(f) the tower form complies with PO5 of the HRADC, which requires the design to mitigate negative visual and physical impacts by setting back from adjacent properties and tower forms - Council (and the submitters) did not rely upon or advance non-compliance with this provision of the planning scheme;
(g) a comprehensive shadow assessment undertaken by Mr Curtis, which was not challenged in cross-examination, demonstrates the development will not give rise to unacceptable 'over shadowing' impacts on nearby development;
(h) given the nature of the adjoining development (Palm Beach Hotel and an at-grade carpark), impacts on privacy and overlooking are not of concern; and
(i) it was agreed between the visual amenity experts the proposed development would not adversely impact on privacy and overlooking for future development (as anticipated by the adopted planning controls) on adjoining land.
Subsection (c): a varied, ordered and interesting skyline
(a) A varied skyline, by reason of it having a different height to other buildings in the surrounding locality;
(b) An ordered skyline, because it would provide additional building height at a logical location...within a recognised district centre. Further, as demonstrated in the renderings in the Cottee Parker drawing package...and the Digital Photomontage Methodology Report.., in my opinion the additional height would not be visually out of proportion with or dramatically different to other tall buildings in the Palm Beach district centre and elsewhere in Palm Beach;
(c) An interesting skyline, by reason of the detailing of the design of the proposed tower, including its interplay of solid surfaces and openings, glazed areas and balconies, its use of planters, its differentiation between the middle and upper parts of the tower by colour and design detailing, and the 'feathered' effect created by its rooftop battening."
Subsection (d): an excellent standard of appearance of the built form and street edge
Subsection (f): protection for important elements of local character or scenic amenity
Will the proposed development give rise to unacceptable traffic impacts?
"8. The traffic engineers have reviewed the issues in dispute...and have summarised the traffic engineering issues as being:
(a) the proximity of the porte-cochere entry driveway to the Gold Coast Highway/Palm Beach Avenue intersection, its design, capacity and impact on external traffic, cycle and pedestrian operations and safety;
(b) on-site servicing arrangements; and
(c) car parking provision."
(a) for the majority of vehicles turning right from the Gold Coast Highway to Palm Beach Avenue, who would be travelling west and accelerating past the site, they might be surprised by an occasional vehicle slowing down to turn left into the porte-cochere - this 'surprise' increases the risk of 'nose-to-tail' collisions; and
(b) the porte-cochere has limited internal queuing capacity, thereby increasing the risk that vehicles will queue out of the porte-cochere and block the pedestrian path, a bicycle lane and Palm Beach Avenue - this, it was said, 'could have ...impacts on the highway' and 'increase the risk to pedestrians and cyclists'.
(a) the right turn movement from the Gold Coast Highway into Palm Beach Avenue is a slow speed manoeuvre (20-30 km/hr);
(b) at the point of the proposed crossover to the porte-cochere, the west bound traffic lane on Palm Beach Avenue is over 6 metres wide, excluding an on-road cycle lane, and as exhibit 8.01 comfortably demonstrates, provides ample space for a vehicle to pass a leading vehicle turning left into the porte-cochere;
(c) the number of cyclists travelling past the frontage of the site, even allowing for growth over time, is very low (single digits at most); and
(d) Council and the submitters did not contend non-compliance arose with performance outcomes PO2 and PO5 of the Driveways and vehicular crossings code, which prescribes design and locational requirements for a vehicle crossing. The relevant parts of these provisions for this appeal are in the following terms.
The driveway is designed and constructed to ensure:
(a) safe access for a B85 vehicle...from the property boundary to the on-site vehicle accommodation or standing area;
(c) safe pedestrian movement in the proximity of the site."
Vehicle access to a public roadway is safe and does not compromise the efficiency, function, convenience of use or capacity of the road network."
"Development provides off-street car parking to accommodate the parking demand.
(a) reduce congestion and car dependency;
(b) maximise the efficiency of carparking provided; and
(c) encourage alternative transport options such as walking, cycling and the use of public transport."
Development accommodates for the required design service vehicle, including waste collection vehicles to service the development.
(a) that areas are provided for loading and unloading of service vehicles;
(b) that loading operations are contained wholly within the site; and
(c) that pathways from service areas to tenancies are an appropriate width to allow for pallets and trolleys to manoeuvre without conflicting with doors, gates or landscaping.
Development ensures that service vehicle routes to and from the development minimise impacts on residential safety and amenity."
(a) to provide a safe, pedestrian focussed environment, which is achieved principally through the provision of a prioritised crossing point and clear pathways for pedestrians to walk from the road frontages to the lobby and ground floor facilities;
(b) to provide a vibrant porte-cochere and lobby area (to the extent access, parking and servicing areas can contribute to a high quality public realm);
(c) to be functional and efficient in traffic engineering terms;
(d) to minimise impacts and be managed efficiently, which will include the management of the porte-cochere by a hotel operator; and
(e) for safe and efficient waste collection.
(a) ample access is provided to carparking spaces for employees and visitors to the development in a basement carpark (PO2 of the Transport code);
(b) access for pedestrians and cyclists from Palm Beach Avenue, and in the porte-cochere itself, will be safe and convenient, principally via a prioritised crossing from the footpath to the front door of the lobby (PO11 of the Transport code); and
(c) access to the site for pedestrians and cyclists will be direct, safe, pleasant and comfortable via a prioritised crossing and system of pathways that lead from the Gold Coast Highway and Palm Beach Avenue to the lobby and dining facilities on the ground floor (PO13 of the Transport code).
(a) result in the redevelopment of an underutilised site in a manner consistent with, and promoted by, the planning scheme;
(b) act as a catalyst for the redevelopment of the Palm Beach district centre as a whole, being a matter in the public interest (reflected in the planning scheme);
(c) introduce high quality hotel accommodation for visitors, which will have no equal in Palm Beach;
(d) have no adverse traffic impacts;
(e) have no adverse amenity or character impacts; and
(f) have no adverse town planning consequences.
S & S No. 4 Pty Ltd
Council of the City of Gold Coast & Ors [2024] QPEC 42