[2008] VCAT 349
Victorian Civil and Administrative Tribunal
2008-02-29
Original judgment source is linked above.
Rolfe v Surf Coast SC [2008] VCAT 349
The decision of the Responsible Authority is varied. In permit application no. 06/0523, a permit is granted and is directed to be issued for the land at No. 140 Buckley School Road, Buckley. The permit will allow the use and development of the land for an extractive industry (sand) in accordance with the endorsed plans. The permit is subject to the conditions contained in Appendix 1 to these reasons.
Mr D Rolfe with Mr B Kershaw and Ms C Bieser. Expert evidence was called from Mr R Ashby, consultant in land management and land economics.
For Applicant in P168/2007 & Respondent in P1333/2007
Mr W Nelson of Harwood Andrews lawyers. Evidence was called from Mr D Larcombe and Mr R Stevens.
No appearances although several parties were also party to Mr Rolfe's application.
Is there insufficient detail accompanying the permit application?
Would the proposal unreasonably impact on the agricultural value of land?
Would the proposal cause unreasonable dust/sand emissions?
A level 3 assessment is the least onerous due to a lower potential risk arising from emissions from the proposed operations compared to operations requiring a level 1 or level 2 assessment. A level 3 assessment may be required when the development is small, in a location remote from residences, or where it is considered that the off-site impacts would be small compared to sites requiring level 1 or level 2 assessments.
Would the proposal have an unreasonable impact in terms of noise?
Would the proposal have an unreasonable visual impact?
Would the proposal have an unreasonable impact on the road network?
Do any other matters warrant rejection of the proposal?
We note that there have been on-site investigations and a report prepared by Terra Culture. Permit conditions to address this matter were discussed at the hearing including a request by Aboriginal Affairs Victoria for sub-surface testing by a qualified archaeologist and including in conjunction with a representative of the Wathaurong Aboriginal Co-Operative. We have adopted the conditions sought by Aboriginal Affairs Victoria including the additional condition. Mr Nelson submitted testing has been done but it will be a matter for the Council to ascertain what, if any, further testing is required to satisfy the permit conditions.
As the Tribunal frequently states, it is a well established planning principle that depreciation of land values as a result of a proposed development is not a relevant ground by which to refuse a proposal. That is, property value is not, in itself, a planning consideration. But amenity is relevant. If values are affected by adverse amenity impacts, then it is the amenity questions that must be considered, not their ramifications in terms of property values. We have addressed potential amenity impacts previously in these reasons and found the proposed works to be acceptable in the site's planning and physical context. It is integral to our decision to recognise the land is within a Farming Zone and, although there are dwellings on fairly small lots nearby, the impacts of the proposed small scale sand extraction are acceptable in that context.
The use and development of the land for an extractive industry in accordance with the endorsed plans.
The permit must contain the following conditions:
Such areas shall be maintained to the satisfaction of the Responsible Authority.
unless otherwise with the prior written consent of the Responsible Authority.
to the satisfaction of the Responsible Authority. If seasonal conditions are not appropriate for the reinstated top soil to be promptly sown down with final vegetation then an appropriate interim cover crop shall be sown as soon as practicable to minimise dust emissions to the satisfaction of the Responsible Authority
Conditions required by Department of Primary Industries
Conditions required by Aboriginal Affairs Department
Conditions suggested by Environmental Protection Authority
[1] Conditions 1(e), (g) and (h) relating to access/road works and Condition 8 relating to hours of operation.
[2] At a directions hearing before Deputy President Dwyer with a written order dated 30 October 2007.
[3] Clause 35.07. The decision guidelines have been taken into account by the Tribunal in addition to decision guidelines at Clause 52.09-3. Relevant policies of the State and Local Planning Policy Frameworks are Clauses 11, 14, 15.01, 15.05, 17.05, 17.09, 18.02, 18.09 and 21 (Municipal Strategic Statement). The general decision guidelines at Clause 65 apply and have been considered. A number of other documents were referred to in submissions including the EPA's Recommended Buffer Distances for Industrial Residual Air Emissions AQ2/86 July 1990 and Interim Guidelines for the Control of Noise from Industry in Country Victoria (1989) N3/89. Mr Rolfe referred to the EPA's draft State Environment Protection Policy (Air Quality Management); Draft Protocol for Environmental Management - Mining and Extractive Industry, 2006. Referrals of the permit application were made by the Council to the Department of Primary Industries, Department of Sustainability and Environment, VicRoads and Aboriginal Affairs Victoria wherein no objection to the proposal was received subject to conditions being included on any permit to be issued. Advice was also sought from the Environment Protection Authority, Corangamite Catchment Management Authority and Southern Rural Water.
[4] For example, Waldoo Pty Ltd v Corangamite SC [2006] VCAT 1416.
[6] Waldoo Pty Ltd v Corangamite SC [2006] VCAT 1416, Norville Nominees Pty Ltd v Strathbogie SC [2007] VCAT 2389.
[9] We observed the readings from the wind monitor several times on our inspection.
[10] Some types of hakea provide an example of the shape of trees/shrubs that are possible.
Rolfe
Surf Coast SC [2008] VCAT 349