[2025] VCAT 399
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-05-09
Original judgment source is linked above.
The Planning Policy Framework operates together with the remainder of the scheme to deliver integrated decision making. Planning and responsible authorities should endeavour to integrate the range of planning policies relevant to the issues to be determined and balance conflicting objectives in favour of net community benefit and sustainable development for the benefit of present and future generations.
Processing of the permit application and access to material/documents produced by the EPA
Figure 2 - Extract of the site layout shown in the advertised plans, sheet 4 of 4. Anderson Road (east) is to the bottom of the plan.
Figure 3 - Extract from the VicPlan zoning map, with the subject land notionally marked.
To implement the Municipal Planning Strategy and the Planning Policy Framework.
To provide for industries and associated uses in specific areas where special consideration of the nature and impacts of industrial uses is required or to avoid inter-industry conflict.
To provide a buffer between the Industrial 1 Zone or Industrial 2 Zone and local communities, which allows for industries and associated uses compatible with the nearby community.
To allow limited retail opportunities including convenience shops, small scale supermarkets and associated shops in appropriate locations.
To ensure that uses do not affect the safety and amenity of adjacent, more sensitive land uses.
Clause 53.10 Uses and activities with potential adverse impacts
...the shortest distance from any part of the land to:
...
An application to use land for an industry, utility installation or warehouse for a purpose listed in the table to this clause must be referred to the Environment Protection Authority under section 55 of the Act if the threshold distance is not to be met or no threshold distance is specified.
[Tribunal emphasis added]
Planning should identify, prevent and minimise the risk of harm to the environment, human health, and amenity through:
Strategy
Ensure that development is not prejudiced and community amenity and human health is not adversely impacted by noise emissions.
Minimise the impact on human health from noise exposure to occupants of sensitive land uses (residential use, child care centre, school, education centre, residential aged care centre or hospital) near the transport system and other noise emission sources through suitable building siting and design (including orientation and internal layout), urban design and land use separation techniques as appropriate to the land use functions and character of the area.
Policy guidelines
Consider as relevant:
Ensure, wherever possible, that there is suitable separation between land uses that pose a human health risk or reduce amenity due to air pollutants, and sensitive land uses (residential use, child care centre, school, education centre, residential aged care centre or hospital).
Separation Distance Guideline (Environment Protection Authority, August 2024)
EPA assessment of the permit application material
Despite the shortcomings highlighted above, overall, the risk appears to be low, but the revised acoustic report doesn't allow us to make this conclusion with certainty.
All operations will be contained within the existing building. No operational activities to be conducted outside the main warehouse building.
The equipment and machinery to be setup towards the rear of the workshop, away from Anderson Road. The roller door will remain shut when machinery is in use.
The workshop only operates during the day period of Monday to Saturday 7am - 6pm. No operational activities to be conducted on Sundays, apart from staff vehicle movements, and office work.
Deliveries of timber supplies to occur roughly once per week during business hours.
Waste collection is coordinated with the other tenants in the wider precinct site.
'Joinery' or 'sawmill, wood products and furniture'?
...from our investigations, EPA notes that the use corresponds more closely with 'Joinery' in Clause 53.10, where the threshold distance is 100 metres from sensitive receptors. In either instance, the threshold is not met as the subject site is located across the street from a General Residential Zone - Schedule 2 at a separation distance of 16m.
However, considering that only the dust extractor and two of the four pieces of wood cutting equipment will operate simultaneously (as highlighted in the Acoustic Logic response letter dated 27 March 2024) the overall risk of unreasonable noise appears to be low.
A Car Parking Demand Assessment (CDPA) was not provided with the application however given a reduction of only one (1) space is sought, given the minor nature of this reduction, a CPDA was not considered necessary by Council's traffic engineers nor by the planning officer.
Impact of other waivers/reductions allowed and being proposed
Traffic movement, loading, deliveries and waste
Future permit applications - precedent and intensity
Workability of permit conditions and compliance
(a) An updated site plan showing the location of the seven (7) car spaces allocated to the site and the two (2) car parking spaces at the front of the site allocated for customer car parking.
(b) The provision of a Noise Management Plan in accordance with the requirements of Condition No. 3 of this Permit.
When approved, the plans will be endorsed and form part of this Permit.
(a) Mitigation measures to be implemented to address noise risks associated with the use.
(b) Establishment of a complaint's procedure and/or register.
(c) Processes for continuous monitoring and improvement with regards to potential noise risks with the associated use.
The mitigation measures and requirements of the endorsed Noise Management Plan must be implemented and complied with to the satisfaction of the Responsible Authority.
No operational activities are to be conducted on Sundays, with the exception of staff vehicle movements and office work.
(a) Transport of materials, goods or commodities to or from the land;
(b) Appearance of any building, goods, stored goods or materials;
(c) Emission of noise, artificial light, vibration, odour, fumes, smoke, vapour, steam, soot, ash, dust, waste-water, waste products, grit or oil;
and/or in any other way, to the satisfaction of the Responsible Authority.
(a) A Works Approval from the Environmental Protection Authority.
(b) A Waste Discharge Licence from the Environmental Protection Authority.
(c) Notification under the Occupational Health and Safety Regulations 2017.
(d) A licence under the Dangerous Goods Act 1985 (Vic).
The requirements and management procedures as set out in the endorsed Waste Management Plan must be implemented to the satisfaction of the Responsible Authority.
If collection occurs on the land at No. 21-23 Anderson Road but outside of the subject land, bins must be removed from the driveway within No. 21-23 Anderson Road promptly after collection.
Waste storage and collection must not affect the amenity of the surrounding area and which does not cause any interference with the circulation and parking of vehicles on abutting streets.
[1] Parties' submissions and statements of grounds have all been considered in the determination of the proceeding, in addition to permit application material provided by the Council in accordance with Practice Note PNPE2 Information from Decision Makers. In accordance with the Tribunal's practice, not all of this material will be cited or referred to in these reasons.
[2] Van Egmond v City of Knox, Bassett and Ors as set out in Knox City Council v Tulcany Pty Ltd [2004] VSC 375 (30 September 2004); and Teleskivi Investments Pty Ltd v Yarra Ranges SC [2012] VCAT 969.
[3] The detailed responses are dated 8 December 2023, 25 March 2024 and 11 April 2024.
[5] What this means was discussed at the hearing. If a determining referral authority objects to a permit application, the responsible authority must refuse to grant a permit, and if a determining referral authority specifies conditions, those conditions must be included in any permit granted.
[8] That is, Activity Centre Zone, Capital City Zone, Commercial 1 Zone, Docklands Zone, residential zone or Rural Living Zone.
[10] Using the timeline tool in Nearmap aerial imaging, it appears the tree was removed in late 2022.
[11] Planning Permit D/941/2016, Waste Management Plan, dated 29 May 2018 & endorsed 1 March 2019 and prepared by Leigh Design
Righele