[2016] VCAT 1573
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2016-09-16
Original judgment source is linked above.
Section 173 Agreement
The Owner must pay all reasonable costs for the preparation, execution and registration of the Section 173 Agreement. The Section 173 Agreement must be registered in accordance with the provisions of Section 181 of the Planning and Environment Act 1987.
The Arborist Report must include an assessment of Tree No. 16 (Sydney Blue Gum) confirming whether the tree can be safely retained as part of the development. If the assessment concludes that the tree can be safely retained, appropriate management measures, and any modifications to the development to ensure its retention, must be specified.
The development must be undertaken in accordance with the requirements and recommendations of the approved Arborist Report to the satisfaction of the Responsible Authority.
The approved Tree Management Plan must be implemented to the satisfaction of the Responsible Authority.
The following requirements must be observed within the area enclosed by the Tree Protection Fence:
(a) no vehicular or pedestrian access;
(b) the existing soil level must not be altered either by fill or excavation;
(c) the soil must not be compacted or the soil's drainage changed;
(d) no fuels, oils, chemicals, poisons, rubbish or other materials harmful to trees are to be disposed of or stored;
(e) no storage of equipment, machinery or material is to occur;
(f) open trenching to lay underground services e.g.: drainage, water, gas, etc. must not be used unless approved by the Responsible Authority to tunnel beneath;
(g) nothing whatsoever, including temporary services wires, nails, screws or any other fixing device, is to be attached to any tree;
(h) tree roots must not be severed or injured; and
(i) machinery must not be used to remove any existing concrete, bricks or other materials.
or otherwise a minimum of eighteen (18) trees, inclusive of the retained trees, in locations to the satisfaction of the Responsible Authority.
All species selected must be to the satisfaction of the Responsible Authority.
Water quality works within the development must be provided to achieve compliance with the above best practice standards to the satisfaction of the Responsible Authoirty.
Parking areas and access lanes must be kept available for these purposes at all times.
The development must be undertaken in accordance with the approved Construction and Environment Management Plan to the satisfaction of the Responsible Authority.
In accordance with Section 69 of the Planning and Environment Act 1987, an application may be submitted to the Responsible Authority for an extension of the periods referred to in this condition.
[1] I have considered the submissions of the parties, all the written and oral evidence and all the exhibits tendered by the parties. I do not recite or refer to all of the contents of those documents in these reasons.
[2] Rescom Aqueduct Langwarrin Pty Ltd v Frankston CC [2016] VCAT 1119
Rescom Aqueduct Langwarrin Pty Ltd
Frankston CC [2016] VCAT 1573