appellant. The Council's refusal was set aside. A permit was granted for alterations and extensions to the existing dwelling, up to two storeys and 7.94 metres, and for variation to DDO1 site-coverage...
1 cited instrument linked from this judgment.
VCAT allowed the review and granted a permit for the house extension, but not exactly as initially proposed. It accepted that a visible first floor could fit the setting because it would not obscure the town skyline or the Royal Hotel, and because two-storey buildings were present nearby. To address the design concerns, it required the first-floor store to be removed, the stairwell to be reconsidered, and the garage to be smaller and set back. It also required the rear verandah to remain an unroofed deck.
AI-generated legal information, not legal advice. Zoe can make mistakes. Check the cited source, and for advice about your situation consult a qualified Australian lawyer.
2,206 words · generated 29/09/2026
In Reed v Queenscliffe BC [2009] VCAT 1329, Maxwell Reed asked the Victorian Civil and Administrative Tribunal to review Queenscliffe Borough Council's refusal of a planning permit. The application concerned alterations and extensions to an existing single-storey dwelling at 33 Bethune Street, Queenscliff, including a new first floor. The proceeding was brought under s 77 of the (Vic), as the judgment identifies it.
The land was in the Residential 1 Zone, where the reasons say a permit was not triggered for the proposed extension. The permit requirement instead arose under Design and Development Overlay Schedule 1, or DDO1. That overlay provided for a maximum height of two storeys and 8.5 metres above natural ground level. The reasons also record a recommended maximum site coverage of 40 per cent. The judgment notes that, despite the stated maximum height, a lower height could be necessary in light of urban character, the prevailing height nearby, the relevant design guidelines, and reasonable sharing of views.
The Council's refusal focused on the proposed first floor and the development's effect on the approach to Queenscliff. It considered the proposal insufficiently responsive to an area it described as predominantly single-storey, and raised concern that the development might affect views and the townscape skyline. It also objected to the garage being brought forward of the existing house.
At the merits hearing on 2 July 2009, the applicant's representative accepted that the first-floor store could be deleted. The representative also clarified that the rear verandah was an unroofed deck, not a roofed structure. VCAT inspected the site and considered the street context and views.
On 15 July 2009, Member Christina Fong set aside the Council's refusal and granted a permit. The permit was conditional, rather than an approval of the submitted design without change. Before development could start, amended plans had to delete the first-floor store, address the stairwell's position, reduce the garage by deleting its workshop space, specify external materials and finishes, and confirm that the rear verandah was an unroofed deck. The permit also required stormwater to be collected on site and discharged to a legal point of discharge. It would expire if development did not start within two years or finish within four years, with the stated possibility of an extension request.
The Tribunal's central question was whether the extension, especially its first floor and the forward garage, was consistent with DDO1 and the related Queenscliff policy. The decision did not treat either the area's single-storey character or the overlay's two-storey maximum as conclusive in isolation. Instead, it considered the proposal against the particular street, the township approach, and the views that the overlay sought to protect.
The reasons describe the site as on the east side of Bethune Street, on a curve in the road towards Queenscliff. The Tribunal considered that the street was not uniformly single-storey. Although the block containing the review site had the greatest concentration of single-storey buildings, the member observed that two-storey buildings were not rare in the area, naming several nearby addresses. This context qualified the Council's concern about the proposal's scale.
The member also identified the features that made the approach distinctive: mature cypresses, views of Swan Bay near the urban entrance, the curve of the road, and historic buildings and skyline in the background. The Royal Hotel was part of that silhouette. The first floor would be highly visible, and might be more noticeable than the ground floor, particularly when leaving Queenscliff. But the Tribunal did not find that visibility alone made the proposal unacceptable. It concluded that the first floor would not obscure the Queenscliff skyline or the Royal Hotel's dominance in the distance.
That assessment did not mean that every part of the first-floor design was accepted. The Tribunal regarded deletion of the store as a positive way to reduce the mass presented to the street. It also required review of the stairwell, which otherwise would project disproportionately in relation to the rest of the first floor. This demonstrates the decision's fact-specific character: the Tribunal accepted the development in principle while requiring specific design changes to address identified impacts.
The garage was considered separately. The Tribunal accepted that it would be brought forward and sit ahead of the rest of the house. It agreed there was substance to the Council's criticism that this could make the car-parking structure dominant. The condition therefore required the garage to be set back so it did not protrude from the rest of the house. Reducing its length required deleting or relocating the proposed workshop space.
Finally, the Tribunal addressed site coverage. It recorded that the DDO recommended a maximum of 40 per cent and accepted the clarification that the rear verandah was a deck and not roofed. It required that status to be confirmed through the permit condition. The decision's conclusion was concise: the proposal was acceptable as a design response to DDO1 if reduced in size.
The judgment does not set out a broad account of the law before the decision, nor does it announce a new legal test. It records the applicable planning controls and policies and applies them to a particular permit application. Accordingly, the safest account of its significance is as a merits-review decision illustrating how the stated DDO1 objectives were applied to this proposal, rather than as a general change to Victorian planning law.
As described in the reasons, DDO1 imposed a permit requirement for buildings and works and specified a maximum height of two storeys and 8.5 metres. The judgment also says that the schedule recognised circumstances in which a lower height might be necessary, including where that was needed to reflect the area's prevailing height or satisfy relevant character objectives. The Tribunal's decision is consistent with considering both the numerical maximum and the overlay's qualitative objectives.
The order allowed a building of two storeys and up to 7.94 metres, subject to the permit's other terms. The reasons do not say that compliance with the numerical height maximum, by itself, would make a proposal acceptable. Nor do they say that a predominantly single-storey street must remain exclusively single-storey. Rather, the member examined visibility, skyline effects, nearby built form, and the proposal's design details, and then imposed conditions.
The judgment refers to the local policy at Clause 22.04-1 and to other planning provisions, including Clauses 16.01, 21.05-2, 21.05-3 and 65. It does not reproduce or analyse all of those provisions in detail. Its reasoning therefore supports only a limited account of their role: the Council's concerns and the Tribunal's assessment were framed by DDO1 and the Queenscliff urban-character policy, among the other provisions identified.
The decision cites Kandu Consultants v Queenscliffe [2006] VCAT 1144 in connection with the Council's concern about garage dominance. The supplied text says that the same member had made an observation in that nearby review about a garage structure forward of a building. It does not give a broader account of Kandu's legal reasoning or establish that the present decision adopted a general rule from it.
The supplied judgment contains no account of later decisions. It therefore cannot establish how subsequent courts or tribunals treated Reed, whether they followed or distinguished it, or whether it remains influential.
The reasons state: “The proposed first floor would not obscure views of the skyline of Queenscliff or the dominance of the Royal Hotel building in the distance.” In plain English, the Tribunal accepted that the first floor would be noticeable, but found that it would not have the particular adverse effect on the skyline and distant landmark that concerned the Council.
The Tribunal also observed that the street's single-storey character was not uniform. It noted that two-storey buildings were not rare in the relevant area. In plain English, the existing streetscape provided a mixed context, so the proposal was not assessed as if it were entering a street made up entirely of single-storey buildings. That observation did not remove the need to consider whether this particular design was too prominent.
The reasons say that deleting the store was “a positive step towards reducing the first floor building mass to the street.” In plain English, removing that part of the proposed upper floor would make the building present as less bulky from the street. The Tribunal separately identified the stairwell as a potential disproportionate projection and required it to be reconsidered.
On the garage, the Tribunal said there was “some credence to Council's criticism of the dominance of the garage.” In plain English, it agreed that the garage's forward position raised a real design concern. The response was a condition requiring a greater setback and a shorter garage, rather than refusal of the whole proposal.
The decision's conclusion states that the extension, “if reduced in size,” was an acceptable response to DDO1's design objectives. This captures the conditional nature of the outcome: approval followed only after required amendments. The operative order also required detail of external materials, finishes and colours, and confirmation that the rear verandah would remain a deck rather than be roofed.
The decision is most closely relevant to a fact pattern involving a proposed building or extension that requires a permit under an overlay with both a maximum height and design objectives directed to local character, heritage qualities, views, or skyline. It is especially pertinent where a decision-maker must assess whether a visible upper storey is acceptable in an area described as predominantly single-storey, but where the immediate context includes some two-storey buildings.
Its factual value is strongest where the site sits on a prominent or visually sensitive approach to a town, and the planning controls identify townscape views or skyline as matters to protect. The Tribunal's assessment depended on features it observed at Queenscliff, including the curve of Bethune Street, views of Swan Bay, mature cypresses, and the historic skyline. The decision does not establish that those features, or the same outcome, will arise in another locality.
The garage aspect may be relevant where a garage is proposed forward of the principal dwelling and its position risks making the parking structure visually dominant. In this case, the Tribunal treated the concern as capable of being addressed by setback and reduction in length.
The decision also illustrates the use of permit conditions to address identifiable design concerns where the Tribunal considers the development acceptable in a modified form. The ordered changes were specific: delete the first-floor store, review the stairwell, reduce the garage, detail external finishes, and confirm that the rear area was unroofed. The judgment does not establish that conditions will always be sufficient in a different case. Its result followed from the Tribunal's assessment of this design and site.
The judgment supplied for analysis contains no later decisions discussing Reed v Queenscliffe BC. It gives no citation to a subsequent case applying, distinguishing, following, or otherwise considering this decision. A source-grounded account therefore cannot describe how later courts or tribunals have treated it.
The only earlier decision it expressly identifies is Kandu Consultants v Queenscliffe [2006] VCAT 1144. The footnote says the member had observed in that nearby review that a garage structure forward of a building could be dominant. In Reed, the Council relied on that concern, and the Tribunal found it had some force on the facts before it. The supplied reasons do not set out Kandu in enough detail to characterise its full holding or the precise relationship between the two decisions beyond that reference.
Consequently, Reed can be described from this source as a VCAT merits decision applying local planning controls to a particular design. Any claim about its subsequent precedential treatment would require sources not included in the material provided.
Several matters remain outside the supplied reasons. First, the judgment does not provide the full text of DDO1, Clause 22.04-1, the relevant urban-character provisions, or the Building Siting and Design Guidelines. It identifies their objectives and describes the controls, but does not reproduce every criterion that might be relevant to another application.
Second, the judgment does not give detailed measurements for the proposed and amended setbacks, the site coverage calculation, or the final design after the required amendments. The order specified changes to be shown on plans for approval by the responsible authority. The supplied material does not include those amended plans or a later decision about whether they were approved.
Third, the reasons do not explain the detailed legal operation of s 77 or s 85(1)(b); they identify those provisions as the basis for the review and the direction to issue a permit. Nor does the decision decide a dispute about the legal enforceability of a permit condition. It simply records the conditions imposed in this proceeding.
Finally, there is no information here about appeals, subsequent proceedings, construction, or later treatment of the decision. Those matters cannot be inferred from the order alone.
This is general legal information, not legal advice. Zoe can make mistakes. Before acting on this, relying on it, or using any draft, have it checked by a qualified Australian lawyer.
Application under s. 77 of the Planning and Environment Act 1987 against Council's Refusal to Grant a Permit to Construct a First Floor Extension to Existing Single Dwelling; Queenscliffe Planning Scheme; Residential 1 Zone; Design and Development Overlay (DDO1).
Reed v Queenscliffe BC [2009] VCAT 1329
The decision of the Responsible Authority is set aside. A permit is granted for the alterations and extensions to an existing dwelling (two storey up to 7.94 metres) and variation to the site coverage requirements of DDO1 at 33 Bethune Street, Queenscliff, generally in accordance with the endorsed plans and subject to the following conditions:-
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires or within three months afterwards.
The Responsible Authority is directed to issue a permit in accordance with this order under the provisions of Section 85(1)(b) of the Planning and Environment Act 1987.
Catherine Dalton-Reed and Maxwell Reed appeared in person.
Michelle Watt, Town Planner, Borough of Queenscliffe
[1] Kandu Consultants v Queenscliffe [2006] VCAT 1144 order dated 19 June 2006.
Reed
Queenscliffe BC [2009] VCAT 1329
The Council's refusal was set aside. A permit was granted for alterations and extensions to the existing dwelling, up to two storeys and 7.94 metres, and for variation to DDO1 site-coverage requirements, generally in accordance with the endorsed plans and subject to conditions. Before development starts, amended plans must delete the first-floor store, address the stairwell's position, reduce the garage by deleting the workshop space, specify external materials and finishes, and confirm that the rear verandah is an unroofed deck. Stormwater must be collected on site and discharged to a legal point of discharge. The permit expires if development does not start within two years or finish within four years, subject to the stated extension provision.