[2025] VCAT 1139
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-12-24
Original judgment source is linked above.
Construct a building which is within 100 metres from a waterway, wetlands or designated floodplain, 20 metres of a road, and within 100 metres from any dwelling not in the same ownership
Construct a building or construct or carry out works.
Construct a building or construct or carry out works, other than a non-habitable building with a floor area less than 100 square metres.
(a) Elevations of the shelter section of the stockyards and typical barrier specifications
(b) Correct area of site on Plan 002.
(a) be prepared to the satisfaction of the responsible authority
(b) have plans drawn to scale with dimensions
(c) include screening with native and non-native plants between the stockyards and 510 Gundowring Road, Gundowring
(d) be submitted to the responsible authority in electronic form.
(a) The development is not started within 2 years of the issued date of this permit.
(b) The development is not completed within 4 years of the issued date of this permit.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the responsible authority for an extension of the periods referred to in this condition.
[1] The information was ascertained through questions at the hearing.
[2] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[4] Planning Practice Note 42: Applying the Rural Zones, June 2024.
[5] Knox CC v Tulcany Pty Ltd [2004] 18 VSC 375 at [13].
Randell
Indigo SC [2025] VCAT 1139