Rainbow Bay Resort [2025] QBCCMCmr 254
The Body Corporate for Rainbow Bay Resort (respondent)
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227(1)(b) and 229(3)(a)
Body Corporate and Community Management (Accommodation Module) Regulation 2020 (Accommodation Module)
IMPROVEMENTS TO LOT; COMMITTEE MOTION, PROCEDURES where owner submitted motions for committee consideration; committee did not decide the motions; owner submitted amended motions; committee did not decide the amended motions.
a) The owner of Lot 25, Amelia Traino, has breached By-law 6.1 by undertaking alterations to Lot 25 that required approval under By-law 6.1 without the approval of the Body Corporate for Rainbow Bay Resort. > > b) The owner of Lot 25, Amelia Traino, must not progress or undertake any alterations to Lot 25, without prior approval of the Body Corporate for Rainbow Bay Resort under By-law 6.1 unless: > > 1. the alteration is cosmetic, not substantive, and does not affect another lot or common property, or > 2. the alteration is cosmetic, not substantive, and cannot be seen from another lot or the common property.
This is a formal request for Committee approval of the following works in Unit 24, with the following
motions to be approved. Additionally find attached the Lot Improvement form to incorporate new
improvements requested as well as replacement works.
* Motion 1: Approve completion of works already commenced, as outlined in full detail in attached
a. Architect plans showing pre-existing and new planned (same as previously supplied in Dec 2023)
*Motion 2: Approval for works not yet commenced, with attached material in support:
a. architect plans previously submitted demonstrating what was previously existing (page 3-4) and new (page 1-2)
b. engineer's assessments and builders' assessments re level 7 bathroom item
I look forward to the Committee's decision and written confirmation.
Request to approve Works at Unit 24, 265 Boundary St Rainbow Bay
This is submitted by Amelia T, via email to David Anderson (malibu222@bigpond.com)
and Kellie Wright (kelliew@stratainfluence.com.au) representing the Body Corporate ("Committee") of Rainbow Bay.
Motion 1 - Approval Request for Works Already Commenced
These works were already commenced inside this lot, are not visible by other lots or common
property and do not touch / affect common property or utility infrastructure. It is requested that
the works outlined below are approved by the Committee.
(Attachment A) to be installed. These are all like for like replacements.
There is no change to utility infrastructure. There is no involvement/ impact to other Lot owners or
Motion 2 - Approval Request for Works Not Yet Commenced
20. The Body Corporate is willing to consider an application to approve the renovations proposed by your client (Renovation Application) with a view to resolving this dispute.
21. To allow the Body Corporate to consider the Renovation Application, please:
(b) resubmit the plans and specification of the renovations (while your client has indicated
that the plans have already been submitted, the Body Corporate requests that these
are resubmitted to ensure that the correct version is being considered); and
(c) address the concerns raised by the Body Corporate with respect to the renovations
22. Attached are copies of our correspondence dated 24 October 2023 which summarises the
a) Stating that the committee was willing to consider the motions on the conditions included within enclosed motions (body corporate motions); and > > b) Providing a copy of the body corporate's motions.
a) by committee resolution - the renovations described within correspondence dated 24 August 2024 and the Arco Design Drawings dated 27 November 2023 (Committee Motion), with the exception of the replacement of the windscreen on the boundary of the balcony and common property (Windscreen Replacement); and
b) by ordinary resolution the Windscreen Replacement, as an improvement to common property which exceeds $3,000 must be authorised by ordinary resolution pursuant to section 177 of the Body Corporate and Community Management (Accommodation Module) Regulation 2020 (Accommodation Module).
a) the nature of the Roof Works (i.e. that the Roof Works ought to be included in the amended motions as a 'Renovation') and their cost; > > b) the body corporate's requirement that the applicant's project manager comply with reasonable directions given by the body corporate's project managers with respect to the membrane works (the Requirement); and > > c) detail in respect of the Window Maintenance.
a) the Roof Works: > > 1. are a consequence of the balance of the Membrane Works; and > 2. are, accordingly, not appropriately categorised as 'Renovations' in the Amended Motions; > > b) the Requirement is impractical, a deterrent to any contractor who is requested to complete the subject works (i.e. having multiple decision makers) and of little utility where Membrane Works must be completed pursuant to plan in any event; > > c) the body corporate should be aware that the applicant sought the body corporate's approval to complete window works in around July 2021, with provision of photographs displaying the subject windows and three quotes, which approval was denied.
a) the applicant was willing to attain and provide to the committee/body corporate a quote for the Roof Works by 14 January 2025, subject to contractor availability; > > b) provided the cost of the Roof Works are within the committee spending limit, they can be authorised by a committee resolution; > > c) the applicant was otherwise content for the Roof Works to be authorised by ordinary resolution, should the costs of those works exceed the committee spending limit; and > > d) the applicant would submit a modified motion in respect of the Roof Works, reflecting the above, on attaining the quote mentioned above;
subject to the committee/body corporate confirming by 5:00pm, 7 January 2025 that:
e) it will hold a general meeting to resolve as to the Roof Works by Friday, 24 January 2025;
f) the committee will recommend the approval of the Roof Works at the general meeting mentioned above, on the presumption that the quote for those works is fair and reasonable; and
g) the committee would decide the balance of the Amended Motions, by Friday, 10 January 2025.
a) confirm that it will hold a general meeting to resolve as to the Roof Works by Friday, 7 February 2025; > > b) confirm that the committee will recommend the approval of the Roof Works at the general meeting mentioned above, on the presumption that the quote for those works is fair and reasonable; and > > c) decide the balance of the works the subject of the amended motions other than the roof works (ie the Balance Amended Motions).
a) where the motions contained sufficient information and detail to enable the committee to properly consider the subject works; > > b) where the committee did not seek: > > 1. further information in respect of the motions; or > 2. further time to consider the motions;
d) the applicant has sufficiently addressed the Remaining Concerns; > > e) the committee has not promptly and actively engaged with the applicant's requests for approval
the committee acted unreasonably in the deemed refusal to pass the Motions or the Amended Motions or the balance of the Amended Motions.
Rainbow Bay Resort CTS 5907 - improvement request
a) Your client has failed to provide costs and details of the design of the windows sought to be replaced within the lot. Your client has submitted a quotation from GC Window Repairs dated 15 January 2024, however it: > > 1. is largely outdated; > 2. does not set out the design or specification of the windows; and > 3. includes a variety of other repair work, such that it is not clear which work your client expects the Body Corporate to approve. > > b) Your client has failed to provide costs for the roof drainage works proposed to be carried out, or current expert building advice to confirm that the work is required to be carried out by the Body Corporate as part of its maintenance obligations pursuant to the Body Corporate and Community Management (Accommodation Module) Regulation 2020. > > c) Your client has failed to accept the requirement that your client's project manager comply with reasonable directions given by the Body Corporate's project manager with respect to the membrane works (Supervision Requirement). (Outstanding Concerns).
However, I am not convinced it would be unreasonable for the body corporate to require for example: details about proposed work; plans of the work on common property; and evidence of any relevant approvals including from the local authority. It should be noted that the body corporate must keep a register of authorisations affecting common property recording for example, a description of the affected part of common property...
An owner is entitled to expect to be fully and fairly informed with respect to the subject matter of a motion.
a) The Proposed Motion does not authorise the window or roof drainage work. The Body Corporate is willing to consider the authorisation of the window or roof drainage work at a later date, once your client addresses the Outstanding Concerns. > > b) The Proposed Motion includes the Supervision Requirement. The Body Corporate is responsible for the ongoing maintenance of the roofing membrane, and it is reasonable for the Body Corporate to retain control over the manner in which the membrane works are performed. > > c) The Proposed Motion is subject to your client withdrawing QCAT appeal proceeding APL 278-24 within 14 days' from the date that the Body Corporate passes the resolution (Application).
a) the Proposed Motion authorises the vast majority of the improvements proposed to your client's lot; and > > b) the Body Corporate has indicated a willingness to authorise the balance of any improvement works, such as the window or roof drainage work, once your client addresses the Outstanding Concerns.
a) confirmed the Body corporate's acceptance of the majority of the motions submitted by you, except for: > > 1. window and roof drainage work (Additional Works); and > 2. is subject to you withdrawing the QCAT Appeal proceeding within 14 days' from the date that the resolution is passed; > > b) set out the terms of a motion (Proposed Motion) which the committee was willing to consider in committee meeting.
a) vacating the current directions; and > > b) requiring that the Body corporate file its response submissions by 16 June 2025.
a) allow the committee meeting to occur and further discussions regarding the Outstanding Issues; and > > b) avoid unnecessary expenditure on the part of the Body corporate.
Motions submitted to committee on 25 August 2024 (original motions)
Motions submitted on 13 November 2024 (amended motions)
a) further particularisation of the Membrane Works; > > b) the inclusion of rectification works for: > > 1. the roof drainage system; and > 2. the membrane for the Lot 25 balcony depicted in Drawing 04 of the Arco Design Drawings (level 6 balcony)
d) inclusion of the Windscreen Replacement as a motion to be approved by committee resolution, as the new glass windscreen the subject of that motion will likely have an installed value of less than $3,000.00; and
e) inclusion of the Window Maintenance as a motion to be approved by committee resolution on similar terms to the balance of the Amended Motions.
carry out roof drainage works set out on the Flux Hydraulic Services Roof Drainage Rectification
Pursuant to section 177 of the Body Corporate and
In Iluka Court [2016] QBCCMCmr 92 the
affecting common property recording for example, a description of the affected part of common property...
An owner is entitled to expect to be fully and fairly
a) Requested the body corporate's approval for works already commenced by the applicant, providing the specifics of those works and identifying those works in the attachments to the Motions; > > b) Requested the body corporate's approval for works not yet commenced by the applicant, providing the specifics of those works and identifying those works in the attachments to the Motions; > > c) Attached relevant design plans and other supporting material, including: > > 1. Architect's plans; > 2. Engineer's reports; > 3. A TTM Consulting acoustic report for underlay; > 4. A builder's report; > 5. A G001707 Compliance Certificate; > 6. A lot application form; and > 7. A new spa brochure; > > d) Addressed insurances for the works the subject of the Motions; > > e) Addressed the hours during which the works the subject of the Motions would be concluded; and > > f) Addressed the process by which rubbish from the works the subject of the Motions would be removed from Lot 25.
a) Expressed the body corporate's willingness to consider the works the subject of the Motions on certain conditions; and > > b) Proposed the body corporate motions.
a) Proposed the body corporate's authorisation, by committee resolution, of the renovations described in the Motions, 'with the exception of the replacement of the windscreen on the boundary of the balcony and common property' (windscreen replacement); and > > b) Proposed authorisation, by ordinary resolution, of the windscreen replacement (on the basis that an 'improvement to common property which exceeds $3,000 must be authorised by an ordinary resolution pursuant to section 177 of the Accommodation Module.
a) Further particularisation of the membrane works (as defined in the body corporate motions); > > b) The inclusion of rectification works for: > > 1. The roof drainage system; and > 2. The membrane for the Lot 25 balcony depicted in Drawing 04 of the Arco Design Drawings (level 6 balcony) (as attached to the amended motions);
d) Inclusion of the Windscreen Replacement as a motion to be approved by committee resolution, as the new glass windscreen the subject of that motion would likely have an installed value of less than $3,000; and > > e) Inclusion of the Window Maintenance (as defined in the Amended Motions) as a motion to be approved by committee resolution on similar terms to the balance of the Amended Motions.
a) the roof drainage system rectification works the subject of Amended Motions, pursuant to section 170(2)(b)(ii) of the Accommodation Module; > > b) the works effecting repair of the membrane for the Lot 25 balcony depicted in Drawing 04 of the Arco Design Drawings and the subject of the Amended Motions, pursuant to section 170(2)(a)(iii) of the Accommodation Module; > > c) the balance of the Membrane Works the subject of the Amended Motions, pursuant to section 170(2)(a)(iii) of the Accommodation Module; and > > d) the Window Maintenance the subject of the Amended Motions, pursuant > > a) to section 170(2)(a)(ii) of the Accommodation Module.
a) The nature of the Roof Works (ie that the Roof Works ought to be included in the Amended Motions as a 'renovation') and their cost; > > b) The body corporate's requirement that the applicant's project manager comply with reasonable directions given by the body corporate's project managers with respect to the membrane works; and > > c) Detail in respect of the Window Maintenance.
a) The Roof Works: > > 1. Are a consequence of the balance of the Membrane Works; and > 2. Are, accordingly, not appropriately categorised as 'renovations' in the Amended Motions; > > b) The requirement regarding project management is impractical, a deterrent to any contractor who is requested to complete the subject works (ie having multiple decision makers) and of little utility where Membrane Works must be completed pursuant to plan in any event; > > c) The body corporate should be aware that the applicant sought the body corporate's approval to complete window works in around July 2021, with provision of photographs displaying the subject windows and 3 quotes, which approval was denied.
a) the applicant has sufficiently addressed the Remaining Concerns; > > b) the Committee has not promptly and actively engaged with the applicant's requests for approval;
the Committee acted unreasonably in the deemed refusal to pass the Amended Motions or the Amended Motions, other than the roof works.
The test for whether a body corporate decision is reasonable is objective. It is a question of fact, having regard to all the circumstances. Reasonable decision-making "...involves an evaluation of the known facts, circumstances and considerations that tend to have a rational bearing on the issue..." and "...requires that all relevant matters are taken into consideration and irrelevant ones are left out". The person challenging a decision bears the onus of proof that the body corporate failed to act reasonably.;
As detailed above, a body corporate and its committee must act reasonably when making or not making decisions. Accordingly, whether the default by-laws in the Act or by-laws recorded in a CMS apply, a body corporate and its committee is required to act reasonably in deciding requests for approval under a by-law. Approval cannot be unreasonably refused. Accordingly, that statutory obligation imposes the objective standard.'
'The body corporate for its part must act reasonably, including promptly, in considering any request and deciding to impose conditions on approval. In doing so, it should have particular regard to the need for works to maintain the lot in good condition and whether there could be any impact from the alterations on any other lot or common property. It seems likely that most of the alterations will not be visible from outside the lot or impact on other lots or common property, such that there would be no reasonable basis to refuse approval.
I also do not consider it appropriate in the circumstances to require the respondent to reinstate the lot in its original condition if the proposed works are not approved. I consider that is simply not feasible now. Rather, the parties should be working towards the approval of works to return the lot to a habitable condition.'
The onus rests with the respondent to ensure she provides sufficient clear detail of the works to enable the body corporate to properly consider their nature and impact. Simply referring to previous documentation would not be sufficient. The respondent could consider applying separately (whether at the same time or not) for separate components of the proposed works so that any dispute about the approval of one component would not unnecessarily impede the approval or implementation of uncontroversial components.
[2] See Rainbow Bay Resort [2022] QBCCMCmr 249, Rainbow Bay Resort [2022] QBCCMCmr 307, Rainbow Bay Resort [2023] QBCCMCmr 504; Rainbow Bay Resort [2024] QBCCMCmr 189; Rainbow Bay Resort [2024] QBCCMCmr 287
[6] Section 50(3)(a), Accommodation Module
[7] Section 50(3)(b), Accommodation Module
[9] Section 50(7)(a), Accommodation Module
[12] Rainbow Bay Resort [2024] 287@ [153]
[13] Rainbow Bay Resort [2024] 287@ [166]
[14] Section 76(1), Accommodation Module
[15] Section 76(5), Accommodation Module
[16] Section 76(6), Accommodation Module
[17] Section 78(6)(a), Accommodation Module
[18] Section 79(1)(2), Accommodation Module