CITATION: Raff Angus Pty Ltd v Resource Management and Planning Appeal
Tribunal [2018] TASSC 60
APPEALED FROM: Raff Angus Pty Ltd v King Island Council and Ors
Environment and Planning - Environmental planning - Planning schemes and instruments - Tasmania - Other matters - Interpretation of performance-based planning scheme - Proposal to locate an abattoir within the Rural Resource Zone - Construction of the relevant performance criteria.
Project Blue Sky Inc v Australian Broadcasting Authority [1998] HCA 28; (1998) 194 CLR 355; Taylor v The Owners - Strata Plan No 11564 [2014] HCA 9, 253 CLR 531, followed.
Second Respondent: Tremayne Fay Rheinberger Lawyers
Judgment Number: [2018] TASSC 60
AND PLANNING APPEAL TRIBUNAL, KING ISLAND COUNCIL,
"26.1.1.1 To provide for the sustainable use or development of resources for agriculture, aquaculture, forestry, mining and other primary industries, including opportunities for resource processing."
"use of land for treating, processing or packing land or animal resources. Examples include an abattoir, animal saleyard, cheese factory, fish processing, milk processing, winery and sawmilling."
Other than for residential use, discretionary permit use must -
(b) be consistent with any applicable desired future character statement;
(c) be required to locate on rural resource land for operational efficiency -
(i) to access a specific naturally occurring resource on the site or on adjacent land in the zone;
(ii) to access infrastructure only available on the site or on adjacent land in the zone;
(iii) to access a product of primary industry from a use on the site or on adjacent land in the zone;
(iv) to service or support a primary industry or other permitted use on the site or on adjacent land in the zone;
(vi) to provide opportunity for diversification, innovation, and value-adding to secure existing or potential primary industry use of the site or of adjacent land;
(vii) to provide an essential utility or community service infrastructure for the municipal or regional community or that is of significance for Tasmania; or
(viii) if a cost-benefit analysis in economic, environmental, and social terms indicates significant benefits to the region; and
(i) permanent loss of land for existing and potential primary industry use;
(ii) constraint or interference to existing and potential primary industry use on the site and on adjacent land; and
(iii) loss of land within a proclaimed irrigation district under Part 9 Water Management Act 1999 or land that may benefit from the application of broad-scale irrigation development."
"95 The opening words of Subparagraph (c) do not mesh well with part (viii) when read together as follows.
'The Proposal must "be required to locate on Rural Resource land for operational efficiency if a cost-benefit analysis in economic, environmental and social terms indicates significant benefits to the region".'
"59 The Tribunal must consider whether the location of the Proposal is suitable having regard to the performance standards in Clause 26.3.1. The Tribunal is not required to consider whether other specific sites may offer a preferable alternative. Specific considerations involving a detailed assessment of alternative sites would not be appropriate as only the site of the Proposal has been subject to an opportunity for persons who might be affected to make a representation to Council. While the Tribunal accepts that the performance criteria requires a consideration of the requirement to locate on rural resource land for operational efficiency, such a consideration, in the Tribunal's view, does not require the Second Respondent to identify and demonstrate the operational efficiencies of such a proposal in different zones for the purposes of comparison. Nor a comparative analysis of alternative sites within the Rural Resource Zone.
(a) At [97], the Tribunal opted for an interpretation whereby "... if a cost-benefit analysis in economic, environmental and social terms indicates significant benefits to the region, then the proposal must locate on rural resource land for operational efficiency". Under that interpretation, the only requirement was a demonstration of significant benefit to the region, irrespective of the location of the proposal. It is submitted that this interpretation ignores the linkage required between the location of the proposal in the zone and the regional benefits.
(b) Although it was conceded that the Tribunal had earlier determined that "the proposal was required to locate on Rural Resource land for operational efficiency reasons in a general sense", the Tribunal had not assessed this question against a test which required a link between the regional benefits arising from the cost benefit analysis and the location of the proposal on Rural Resource land. Mr McElwaine submits that the Tribunal had erroneously only considered general reasons relevant to the operation itself as to why there might be some benefit from locating on Rural Resource land.
(c) At [103] the Tribunal stated that even if the test set out in [97] was incorrect, it was satisfied that the evidence supported a finding that the performance criteria had been met. Mr McElwaine criticises this alternative position on the basis that it is not supported by reasons and, in any event, does not specify the alternative interpretation against which the compliance with the performance criteria has been tested.
(a) that the proposal must be required to locate on Rural Resource land for operational efficiency; and
(b) that a cost benefit analysis in economic environmental and social terms indicates significant benefits to the region from the proposal.
"[65] Statutory construction involves attribution of legal meaning to statutory text, read in context. 'Ordinarily, that meaning (the legal meaning) will correspond with the grammatical meaning ... But not always.' Context sometimes favours an ungrammatical legal meaning. Ungrammatical legal meaning sometimes involves reading statutory text as containing implicit words. Implicit words are sometimes words of limitation. They are sometimes words of extension. But they are always words of explanation. The constructional task remains throughout to expound the meaning of the statutory text, not to divine unexpressed legislative intention or to remedy perceived legislative inattention. Construction is not speculation, and it is not repair.
[66] Context more often reveals statutory text to be capable of a range of potential meanings, some of which may be less immediately obvious or more awkward than others, but none of which is wholly ungrammatical or unnatural. The choice between alternative meanings then turns less on linguistic fit than on evaluation of the relative coherence of the alternatives with identified statutory objects or policies. [Footnotes omitted.]
"be required to locate on rural resource land for operational efficiency, to access a specific naturally occurring resource on the site or on adjacent land in the zone."
"be required to locate on rural resource land for operational efficiency, if a cost-benefit analysis in economic, environmental, and social terms indicates significant benefits to the region."
"99 Ms Witte was the only expert to give evidence on the economic impact of the Proposal. Her evidence was that significant economic benefits would flow to the industry with respect to efficiencies and cost reduction and the island itself. No other evidence with respect to cost-benefit analysis was before the Tribunal. Ms Witte was subject to very little cross examination. Whilst Ms Witte did concede in cross examination that an abattoir of this scale located anywhere on King Island would produce benefits as contemplated by part (viii). It is apparent from the cost-benefit analysis undertaken by Ms Witte that her analysis was specific to the Proposal which is the subject of this appeal. The cost-benefit analysis considered the cost of construction on site, the operational costs (which include freight), and the cost of the design and construction phase (which would be approximately $53.5 million over a period of 18 months). Further, her analysis considers direct operational costs based on the 10,000 tonnes regulatory limit for the abattoir, as approximately $9.5 million per annum, with this figure including, processing, packaging, plant, equipment, maintenance, sea freight, utilities, staff wages, waste management and other expenses. Whilst it is apparent that some of those expenses would be relevant to any abattoir proposed on King Island, many of these costs must be specific to the Proposal on this site. In the Tribunal's view, it is reasonable to conclude that the cost benefit analysis undertaken as required by the Scheme, can only be specific to the site. An alternative site might have a different design and structure, construction costs, require a different waste management regime, air quality controls, and different transport needs. All these variables would or could be impacted by such factors such as location, topography and environmental factors.
'a) The proposed project generates significant net benefits to the community:
Raff Angus Pty Ltd
Resource Management and Planning Appeal [2018] TASSC 60
(1998) 194 CLR 355