[2013] VCAT 691
Victorian Civil and Administrative Tribunal
2013-05-02
Original judgment source is linked above.
Do site context and planning policy support a development of the scale proposed on this site?
Existing residential areas will retain their spacious and leafy character, which is highly valued by the local community. New housing will integrate with the existing streetscape and provide additional opportunities for people to live near the Centre.
...that the DDO11 has an important role to play in this application and must mean something; or there is no point to its existence.
Is the height, boundary setbacks and scale an acceptable response to the site context?
To ensure that the site coverage respects the existing or preferred neighbourhood character and responds to the features of the site.
Construction of a three storey building containing 27 dwellings over a basement car park, front fencing exceeding 1.2 metres in height and buildings and works in a Special Building Overlay in accordance with the endorsed plans.
All species selected must be to the satisfaction of the Responsible Authority.
If the Green Wall/Hanging Gardens fail, details of an alternative treatment must be submitted to, and approved by, the Responsible Authority. The alternative treatment must be implemented within three months of approval at no cost to Council and to the satisfaction of the Responsible Authority.
These plans must be accompanied by a report from an industry accepted performance measurement tool, which details the treatment performance achieved and demonstrates the level of compliance with the Urban Stormwater Best Practice Environmental Management Guidelines, CSIRO 1999.
The water sensitive urban design stormwater treatment system as shown on the endorsed plan must be retained and maintained at all times in accordance with the Urban Stormwater - Best Practice Environmental Management Guidelines, CSIRO 1999, to the satisfaction of the Responsible Authority.
Environmental Assessment (Audit may not be required)
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires, or within three months afterwards.
[1] In accordance with Section 4 (2) (d) of the Victorian Civil and Administrative Tribunal Act 1998 a failure to make a decision is deemed to be a decision to refuse the application.
[2] Slightly different figures are given in the Council report and in the witness statements of Ms Ring and Mr Sheppard and I have calculated them slightly differently again.
Radela Nominees Pty Ltd
Bayside CC [2013] VCAT 691