[2014] VCAT 1325
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2014-10-21
Original judgment source is linked above.
Building and Property List; Claim by householder for damages caused by flows of water from burst water main; Water Act 1989 section 157; whether respondent authority has established that flow of water did not result from negligent conduct on its part.
Lower Murray Urban and Rural Water Corporation T/As Lower Murray Water
Quigley v Lower Murray Urban and Rural Water Corporation trading as Lower Murray Water (Building and Property) [2014] VCAT 1325
Dr R.J. Sadler of Counsel, instructed by Holman Webb Lawyers
Mr M. Black of Counsel, instructed by Ligeti Partners Lawyers
a 12 inch [water] main from the corner of Pye Street and Stradbroke Avenue northwards along Stradbroke Avenue ...
Plans for the construction of this main were drawn up by B.A. & D.B. Smith Consulting Engineers of Queen Street, Melbourne and their plans, dated 18 March 1955, were put into evidence. Under the metric system, this main is now designated as 300mm.
and had an estimated service life of 60 years. It had not exceeded its estimated service life at the time of the incident.
Also, that the relevant water main `had a good performance history' and that the Authority
had adopted a comprehensive system for the maintenance and replacement of its assets [whereby] water mains are prioritised for replacement having regard to, inter alia, their condition, performance history, estimated remaining life, the cost of replacement and allocation of budget. The subject water main was not prioritised for replacement prior to the incident given the low frequency of faults compared to other assets.
were limited by the financial and other resources reasonably available to [it] for the purpose of carrying out those functions pursuant to section 83 of the Wrongs Act 1958.
SECTION 157 OF THE WATER ACT 1989
(ii) damage to the property (whether real or personal) of any other person; or
the Authority is liable to pay damages to that other person in respect of that injury, damage or loss.
(2) If it is proved in a proceeding brought under subsection (1) that water has flowed from the works of an Authority onto any land, it must be presumed that the flow occurred as a result of intentional or negligent conduct on the part of the Authority unless the Authority proves on the balance of probabilities that it did not so occur.
(3) For the purposes of a proceeding brought under subsection (1) -
(a) a flow of water is to be taken to have occurred as a result of intentional conduct on the part of an Authority if the flow -
(ii) inevitably and without intervening cause resulted from the exercise of a power by the Authority; and
(b) in determining whether or not a flow of water occurred as a result of negligent conduct on the part of an Authority, account must be taken of all the circumstances including any omission or failure, in the planning, design, construction, maintenance or operation of the works, to provide reasonable standards of capacity or efficiency or exercise reasonable care or skill having regard to the following matters -
(i) the state of scientific knowledge and knowledge of local conditions at any relevant time;
(B) the maintenance and operation of the works; and
(C) works which it would have been necessary to construct to avoid the occurrence of any relevant injury, damage or loss.
(4) The following provisions apply with respect to a proceeding brought under subsection (1) -
(b) the proportion (if any) of the responsibility of the Authority for the injury, damage or loss must be assessed and only that proportion of the assessed damages must be awarded against the Authority;
(c) in assessing damages in respect of damage to property or economic loss the measure of damages is the direct pecuniary injury to the person bringing the proceeding by the loss of something of substantial benefit accrued or accruing and does not include remote, indirect or speculative damage;
(d) if damages are assessed in the proceeding in respect of any continuing cause of action, they may, in addition to being assessed down to the time of assessment, be assessed in respect of all future injury, damage or loss and, if so, the Authority is not liable to pay any further damages in respect of that injury, damage or loss;
(h) a person, not being a party, in whose favour a determination is made may enforce the determination by the same means as if the person were a party.
must apply to the questions of causation and remoteness of damage, the same tests as a Court would apply to those questions in an action based on negligence.
section 19(9) of the Water Act.
In these circumstances it is tempting to see the reference to "negligent conduct" in s 74 as broadly corresponding to the "breach" element of the tort of negligence, as the Tribunal itself may have done in this case, judging by its language. There may be no harm in that, as long as the Tribunal bears steadily in mind that this is a freestanding, statutory cause of action, to be assessed according to the provisions of the WIA and the provisions of any other applicable statute, not according to common law principles save to the extent that the legislation itself indicates otherwise.
(2010) 27 VR 387, 412 [45]
with its references to "all the circumstances" and to planning and design - for the operation of considerations of forseeability similar to those relevant at the "breach" stage of common law negligence.
(2010) 27 VR 387, 413 [48]
THE WRONGS ACT
In determining whether a public authority has a duty of care or has breached a duty of care, a court is to consider the following principles (amongst other relevant things) -
(a) the functions required to be exercised by the authority are limited by the financial and other resources that are reasonably available to the authority for the purpose of exercising those functions;
(b) the functions required to be exercised by the authority are to be determined by reference to the broad range of its activities (and not merely by reference to the matter to which the proceeding relates);
(c) the authority may rely on evidence of its compliance with the general procedures and applicable standards for the exercise of its functions as evidence of the proper exercise of its functions in the matter to which the proceeding relates.
(1) This section applies to a proceeding for damages for an alleged breach of statutory duty by a public authority in connection with the exercise of or a failure to exercise a function of the authority.
(2) For the purpose of the proceeding, an act or omission of the public authority relating to a function conferred on the public authority specifically in its capacity as a public authority does not constitute a breach of statutory duty unless the act or omission was in the circumstances so unreasonable that no public authority having the functions of the authority in question could properly consider the act or omission to be a reasonable exercise of its functions.
(3) For the purpose of the proceeding the public authority is not liable for damages caused by the wrongful exercise of or failure to exercise a function of the authority unless the provisions and policy of the enactment in which the duty to exercise the function is created are compatible with the existence of that liability.
(4) Despite subsection (1), subsection (2) does not apply to a statutory duty that is imposed as an absolute duty on the public authority to do or not to do a particular thing.
In a proceeding, the fact that a public authority exercises or decides to exercise a function does not of itself indicate that the authority is under a duty to exercise the function or that the function should be exercised in particular circumstances or in a particular way.
Section 84 deals with claims based on breach of statutory duty. This tort describes not statutory rights to damages but rather as Dr Balkin and Mr Davis in their work Law of Torts (3rd Ed.) 524 [16.1] but rather instances where courts have implied a civil remedy in damages from statutes imposing criminal or quasi criminal penalties.
to proceedings to which this part applies to the extent that the liability is based on a public or other authority's exercise of, or failure to exercise, a special statutory power conferred on the authority.
Criticality defines the relative consequences of failure and is therefore a measure of the importance to the organisation of preventing, or minimising the unplanned failure of assets.
Failure Probability is assumed to be directly related to pipeline age. The remaining life of each pipe is calculated based on the original date of installation and the theoretical life of the pipe.
A very high importance has been placed on public safety and damages (26% and 13% of the total score) although in practice few pipe failures lead to significant risks in these areas.
In summary the most reliable method of determining the remaining life of a pressure pipe is by examining its failure history.
According to paragraph 5.2, the economic life of a water main
is generally considered to be at the point when 5% of the replacement cost is being spent on annual maintenance.
The practical life of a water main was said to be 'the point at which failures lead to an unacceptable level of service' (paragraph 5.3). Paragraph 6.2 said
In order to predict failure over future years, the average actual life at replacement needs to be calculated. The system of recording installation dates should be maintained to assist in the process of recording this data.
The methodology postulated in the report was described at paragraph 8.1 as follows:
All the criticality attributes should be analysed based on their total score. The assets with a high total score or a ranking of 5 in any category should be reviewed to consider if any failure is acceptable.
If failures are unacceptable steps will need to be taken to prevent failure. This can either be by duplication, alternative supply or higher levels of maintenance.
A suggested cut off point where no review is required is pipes with a total criticality score below 21 with no attribute ranking 5 on criticality.
The rankings for Condition/Remaining Life are as follows:
No recorded failures in last 10 years (Equivalent to Class D)
Single failure in last 10 years (Equivalent to Class C)
More than one failure in last five years (Equivalent to Class B).
More than one failure in last two years (Equivalent to Class A)
More than one failure per year (to be scheduled for replacement regardless of criticality)
These are the costs of the failure in addition to repair costs.
What are the Third Party cost implications of failure?
Applies to Water Mains, Sewers and Sewer Rising Mains
Applies to Water Mains, Sewers and Sewer Rising Mains
(a) it is in an urban area and property is likely to be damaged if it failed;
(d) it was either past or at the end of its service life; and
(e) it would not have been expensive to have replaced the main.
LMW should not just slavishly adhere to a quantitative evaluation of risk without adjustment. The GHD model is vague and `loose'. Its inputs are vague and/or loose eg pipe installation date, estimated life, 'failure history' and its broad risk allocation methodology. As a result its quantitative output is less than precise. This may be useful for general management purposes, but not for assessing forseeability.
to prove that it took every step open to it to make sure the risk was minimised. This means doing more than desk top analysis and model building. It means proactive maintenance and monitoring and inspecting and testing when it can. It did none of this.
We are informed by Mr Henry (and Mr Girdwood agreed) (although no evidence from other authorities has been called) that there are many other ageing AC pipes all over Victoria. They are being run to failure. There will be bursts. Only after those bursts occurred will the Authority then be able to say there is a problem.
(a) Omission or failure in planning, design or construction of the pipe in question;
(b) Omission or failure in maintenance or operation of the pipe in question;
(c) Omission or failure to provide reasonable standards of capacity or efficiency;
(d) Omission or failure to exercise reasonable care or skill.
He said, `The matters set out in sub-paragraphs (i) to (iv) of the sub-section 'are to be taken into account in assessing whether or not each of the identified omissions or failures have not occurred'. As to the state of scientific knowledge, he mentioned the history of AC pipes and that they had a typical life span of 60 years and a maximum working pressure of 920 kPa. In fact, the operating pressure, having regard to the height of the water towers in Swan Hill, was 320 kpa. He noted the history of the main. He said it was installed in reactive clay. He submitted, 'Over the history of this section of pipe there have been few failures and the water main had an excellent performance history'. He turned to the statement of Mr Girdwood. According to Mr Black, the location of the nearby secondary college was not significant as there was no suggestion that the school was at risk of flooding. He said:
The risk of property damage did exist but was not significant. Particularly, there had been two previous failures of the main but they occurred in 1997 and 2008, both with no property damage. The 2009 incident resulted in a lifting of the asphalt of Stradbroke Avenue but did not involve water shooting into the air. It appeared that the Applicants' property bore the entirety of the flow in the 2009 incident.
Works necessary to avoid the flooding of the Applicants' property would have been replacement of the entire length of pipe along the section of Stradbroke Avenue between Chapman and Pye Street before the flood occurred. The cost of those works when ultimately carried out in 2010 was $104,000.00.
all water mains be replaced on a rolling basis well before the end of their expected life span so as to ensure there was never a failure of a water main. That approach would be incredibly costly and incredibly wasteful.
The Respondent's procedures seek to prioritise the replacement of AC mains with the greatest risk and consequence of failure. As AC mains age they become more prone to failure. But their expected useful life is not a guarantee that they will fail on the day they reach that expected useful life.
Quigley
Lower Murray Urban and Rural Water Corporation trading as Lower Murray Water
(2010) 27 VR 387