austlii:qld/QBCCMCmr/2025/188
General information, not legal advice.
QBCCMCmr
2025-06-03
Original judgment source is linked above.
The Body Corporate for Quarterdeck Hervey Bay (respondent)
Body Corporate and Community Management Act 1997 (Qld) (Act), and (3)(a)
Body Corporate and Community Management (Accommodation Module) Regulation 2020 (Accommodation Module)
MAINTENANCE - where the body corporate acknowledges that pillars on common property and surrounding stormwater infrastructure require repair, but wishes to postpone it because it considers other maintenance more important; whether the body corporate must carry out the repairs.
Act, ss 152; 180(1); Accommodation Module, ss 152(2)(a), 170; Land Title Act 1994, ss 48C, 49C(4).
Within six months, the respondent must carry out all works necessary to return the external pillars and surrounding stormwater infrastructure before lots 41 and 42 to good condition, including replacing the rusted downpipe clips.
Water has got into both these cracks and into the pillar from the rain and storms. This has done extensive damage in which steel supporting rods that support the structure have been compromised and rusted out, along with other damage to wood and plastered areas.
There is movement to the front pillar section as a result of ground movement that is most likely being exacerbated by storm water leakage due to incorrect plumbing fittings below ground. This then allowing the expansion joint to open up with water entering to the structure behind causing rot and possibly the connection between pillar and timber structure being compromised.
[3] Seiwa Pty Ltd v The Owner's Strata Plan 35042 [2006] NSWSC 1157, cited by Newton DCJ in MAGOG (NO. 15) Pty Ltd v The Body Corporate for the Moroccan [2010] QDC 70 at [84].