[2002] VSC 524
Supreme Court of Victoria
2002-11-29
Byrne J
Original judgment source is linked above.
[2002] VSC 524
ARBITRATION - misconduct - procedural fairness - whether arbitrator determined issue on basis not presented - whether arbitrator determined all questions argued.
"(a) deciding what industry quality standards were, on a basis that was never put by Mobil nor raised by the arbitrator, and on which Qenos had the opportunity to lead evidence or address argument; and (b) deciding that there had been a change to industry quality standards on a basis that was never put by Mobil nor raised by the arbitrator in argument and in respect of which Qenos had no opportunity to lead evidence or address argument; and (c) stating that Mobil's position was not that industry quality standards were the product exchange specifications, when in fact it was the position that Mobil had argued and maintained throughout the arbitration proceedings."
"22. The Arbitrator breached his obligation to accord procedural fairness to Qenos in that he made a finding that a change to industry quality standards under Section 4.02 of the Agreement had occurred not in June 2000 but `earlier in the year, probably in February, certainly by March' 2000 but without: (a) drawing to either party's attention at the arbitration hearing that the change to industry quality standards - Mobil's case and Qenos' response thereto notwithstanding, may be earlier than that as alleged by Mobil; (b) affording to Qenos an opportunity at the arbitration hearing of dealing with this possible finding or point either by way of addressing argument on the facts or the law, calling evidence, recalling Mobil's witnesses for cross-examination or alternatively further cross-examination. ... 25. Further, in finding that Mobil had made on 23 June 2000 an `effective' nomination under Section 4.02 of the Agreement, the Arbitrator mishandled the arbitration in that he did not decide all the issues addressed by the parties - (a) in their pleadings; (b) in Final Submissions which were worthy of serious consideration and seriously advanced.
Particulars
The Arbitrator failed to address in the Award and the Reasons therein: (i) whether there were any and if so what industry quality standards dealing with the blending of untreated SCN in petrol at the date of the Agreement notwithstanding it was addressed by Qenos in its Points of Defence (para. 26) and its Outline Submissions 1 March 2002 and noted by the Arbitrator at the hearing as a critical issue for determination (Transcript 749, 759, 761, 773 and 781); (ii) what were the industry quality standards dealing with the blending of untreated SCN in petrol immediately prior to the date of the change to same in June 2000 as alleged by Mobil notwithstanding the issue was addressed by Qenos in its Points of Defence (para. 26), its Outline Submissions dated 1 March 2002 and noted by the Arbitrator at the hearing as an issue for his determination (Transcript 761, 809-810);"
I have had regard only to those parts of these affidavits and exhibits to which my attention has been drawn.
"'Coproduct' shall mean those products manufactured from Feedstocks in the Petrochemical Plant which are neither Petrochemical Products, consumed in the operations of the Petrochemical Plant, or disposed of as waste. For the purpose of this Agreement, such Coproducts shall be referred to as `Kemcor Naphtha Returns', `Spent Quench Oil', and `Gasoil Tar' and shall conform to the specifications as contained in Schedules 1(c), 1(d), and 1(e) respectively."[6]
"Section 4.01 [Qenos] agrees to sell to Mobil, and Mobil agrees to purchase from [Qenos], those Coproducts derived from the manufacture of Petrochemical Products in [Qenos]'s Petrochemical Plant from Feedstocks supplied by Mobil providing that such Coproducts conform to the applicable quality specifications as contained in Schedules 1(c), 1(d), and 1(e). In the case of Naphtha Returns and Spent Quench Oil, [Qenos] shall supply and Mobil shall purchase the full quantity of such streams produced by [Qenos]. In the case of Gasoil Tar, [Qenos] shall endeavour to maximise sales of this material to other parties with Mobil purchasing any excess material that is surplus to [Qenos]'s third party sales. Section 4.02 Mobil shall apply all reasonable endeavours to encourage the retention of Government legislation or industry quality standards which enable the Altona Refinery to accept Coproducts from [Qenos] for use in finished product blending without adverse impact to Mobil. Notwithstanding such endeavours, if changes to Government legislation or industry quality standards are introduced which adversely affect the Refinery's acceptance of such streams, then Mobil shall have the option to nominate revised Coproduct quality specifications to [Qenos]."
(i) whether there were any and if so what industry quality standards dealing with the blending of untreated SCN in petrol at the date of the [supply agreement] notwithstanding it was addressed by Qenos in its Points of Defence (para. 26) and its Outline Submissions 1 March 2002 and noted by the Arbitrator at the hearing as a critical issue for determination (Transcript 749, 759, 761, 773 and 781); (ii) what were the industry quality standards dealing with the blending of untreated SCN in petrol immediately prior to the date of the change to same in June 2000 as alleged by Mobil notwithstanding the issue was addressed by Qenos in its Points of Defence (para. 26), its Outline Submissions dated 1 March 2002 and noted by the Arbitrator at the hearing as an issue for his determination (Transcript 761, 809-810);"
"Industry quality standards include the [PESs] which are set and maintained by the Major Oil Companies to establish minimum quality standards for the purchase, sale and exchange of petrol between one another in the Australian market."
"The industry quality standards in existence immediately prior to the change are in writing and are constituted by [PESs]."[7]
"I am satisfied that a change had occurred subsequent to the identification of the causes of the engine sludging problem. Once it was recognised that the blending of untreated SCN into petrol was no longer acceptable, there was a change to the industry quality standard so far as that matter was concerned. I am satisfied that a change had occurred by the time Mobil ceased blending untreated SCN. That change had occurred well before it was incorporated into the various PESs."
The reference to the incorporation of the change in the PESs means that the industry quality standards had changed before the draft PESs were being passed between the major oil companies in June 2000. Formal changes to the PESs occurred some months later.
[1] Commercial Arbitration Act 1984 s. 4(1) definition of misconduct.
[2] Interbulk Ltd v Aiden Shipping Co Ltd, The "Vimeira" [1984] 2 Lloyd's Rep 66; Parol Ltd v Joint Stock Co Rossakhar [2000] 1 Lloyd's Rep 109 at 114, per Colman J.
[3] The Melbourne Harbour Trust Commissioners v Hancock [1927] HCA 26; (1927) 39 CLR 570 at 588, per Issacs J, "unjustly prejudiced a party"; Gas and Fuel Corporation of Victoria v Wood Hall Ltd [1978] VicRp 41; [1978] VR 385 at 392, per Marks J; Doran Constructions Pty Ltd v Health Administration Corporation of New South Wales (1994) 12 BCL 59 (CA-NSW).
[4] Interbulk Ltd v Aiden Shipping Co Ltd, "The Vimeira" [1984] 2 Lloyd's Rep 66 at 75, per Robert Goff J.
[7] Further and better particulars paragraphs 2, 3 and 7.
[9] See, for example, submission para 2.1.
Qenos Pty Ltd
Mobil Oil Australia Pty Ltd
(1927) 39 CLR 570