austlii:vic/PPV/2025/54
General information, not legal advice.
PPV
2025-12-05
Original judgment source is linked above.
The applicant should meet all costs associated with drafting and executing the agreement. The Committee agrees with the Proponent that the section 173 agreement should be executed on title without referencing timing to avoid any unforeseeable procedural issues.
Amend Development Plan Overlay Schedule 16, as shown in Appendix D, to:
a) revise Clause 2.0 to clarify that contamination of land includes landfill gas
b) require the Environmental Management Plan to include provisions for workers operating in any area at risk of landfill gas
c) replace the Environmental Assessments requirements with Landfill Gas Protection Measures
d) introduce requirements for Landfill Gas Protection Measures for buildings and works in confined spaces
e) revise the Environmental Audit Implementation to require a section 173 agreement if the environmental audit recommends requiring ongoing maintenance and/or monitoring.
The issue is whether the Amendment has appropriately considered and responded to odour impact on the subject land from the Knox Materials Recovery Centre.
The Knox Materials Recovery Centre is located at 251 George Street, Wantirna South.

BAO1 requires an assessment of potential odour amenity impacts and seeks:
The Proponent provided Buffer Area Overlay Schedule 1 (Version 1) which deleted the decision guideline seeking the views of the Environment Protection Authority.
The Committee has critically reviewed the approach to odour impact to determine whether it is based on relevant guidance, a sound methodology and will achieve the outcomes sought by EPA.
The Amendment is supported by a sound approach for investigating and responding to the odour issues, including the Odour Assessment. The Assessment's risk assessment methodology and matrix helped to determine that any sensitive land use within 350 metres of the odour source is likely to experience an offensive odour. The data observed over three years (2020-2022) resulted in a generally consistent 350-metre contour. This provides confidence, consistent with Mr Dawson's view, that further modelling is not needed to account for meteorological conditions since this data was collected.
The Odour Assessment shows most of the 350-metre moderate risk area outside of the subject land with a smaller portion in the north-east corner of the subject land. Buffer Area Overlay Schedule 1 has been mapped to conservatively follow the associated contour. This approach justifies the overlay's proposed mapping. While this may not follow the methodology sought by EPA, the Committee considers it will achieve the intended outcomes regarding compatibility between land uses.
The Committee acknowledges EPA's submission that Buffer Area Overlay Schedule 1 does not prohibit sensitive land uses. As acknowledged in the overlay's Statement of Risk, permitting a sensitive land use within 350 metres of the odour source may have a moderate impact on amenity. While this may not impact safety or human health, it may affect the ability to meet the overlay's objective to "ensure that new land uses are compatible with the potential off-site odour impacts of the Materials Recovery Centre".
However, Buffer Area Overlay Schedule 1 should be flexible enough to consider changing circumstances. For example, the Materials Recovery Centre may be redesigned or introduce new technology which reduces lowers the risk in parts of the odour buffer area.
In current circumstances, Buffer Area Overlay Schedule 1 includes suitable provisions to ensure that potential odour impacts are assessed before deciding whether it is appropriate to enable a certain sensitive land use within 350 metres of the odour buffer area.
The Committee agrees with EPA's request to remove the decision guideline "The views of the Environment Protection Authority". Of note, the Practitioner's Guide states:
Decision guidelines must not include informal referral requirements. Only referral comments required under section 55 of the Act may be included as a decision guideline.
The Amendment does not propose to revise Clause 66.04 Schedule to specify EPA as a referral authority for BAO1.
Amend Buffer Area Overlay Schedule 1 to not require the views of the Environment Protection Authority in the decision guidelines (Clause 8.0).
The issue is whether the Amendment has appropriately considered and responded to geotechnical issues.
The subject land includes two quarry pits. The quarrying activities have been completed in the north-west pit and is 90 per cent remediated with fill for the proposed development. Quarrying is still occurring in the south-east pit under a lease which enables the subject land to be used as a quarry for brick production until 2027.
The Amendment was informed by the Geotechnical Strategy. DPO16 requires the following condition be applied to any permit:
A Geotechnical Assessment prepared by a suitably qualified professional to the satisfaction of the responsible authority. The assessment must be endorsed prior to the commencement of works.
Mr Colls provided further advice in a memorandum dated 10 October 2025 stating:
The DPO16 requirements for the Geotechnical Assessment to confirm the suitability of the filled area for the anticipated uses are appropriate and sufficient. They will ensure that the appropriate technical assessment occurs so that the subject land is filled to the appropriate standard for the intended use of those areas.
Amend Development Plan Overlay Schedule 16, as shown in Appendix D to:
a) require a Geotechnical Assessment in Clause 3.0 for any areas that have previously been filled to confirm suitability for the anticipated uses
b) include new 'Geotechnical works and Council infrastructure' requirements in Clause 3.0.
The issue is whether the Amendment has appropriately considered and responded to fire risk.
The subject land is in a declared Bushfire Prone Area. The Bushfire Management Overlay does not apply to the subject land. Planning Scheme Clause 13.02-1S (Bushfire planning) seeks:
To strengthen the resilience of settlements and communities to bushfire through risk-based planning that prioritises the protection of human life.
DEECA submission - the Development Plan Stage 1 should ensure defendable space is located outside future Crown land through bushfire management updates in section 5.
A permit for residential subdivision or buildings and works must contain a permit condition that, prior to the commencement of the subdivision or buildings and works, the landowner must prepare and submit for the responsible authority's approval a bushfire management plan. The bushfire management plan must contain the following requirements to the satisfaction of the responsible authority:
The Proponent relied on Mr Potter's evidence. It provided DPO16 (Version 2) which revised the Landscape Masterplan requirements so that details on how landscaping responds to bushfire management include using the vegetation descriptions set out in Australian Standard AS3959: 2018.
The declared Bushfire Prone Area applies to most of Victoria including the subject land. At the strategic planning phase, there needs to be assurance through risk-based planning that the Amendment will enable development that prioritises human life when new residents arrive. More detailed considerations will be relevant during the permit application stage.
Future development needs to respond to the subject land's context - its location next to the Dandenong Valley Parklands and its limited access points.
The Committee accepts Mr Potter's evidence on this matter. The Bushfire Report has effectively assessed strategies in Clause 13.02-1S to demonstrate that a Bushfire Attack Level Low rating (12.5 kW/m2) can be achieved in the future settlement area. The report's findings and direction have been faithfully translated into DPO16 and the Development Plan to help guide future applications and decisions regarding bushfire management. For example, Figures 31 and 32 in the Development Plan identify vegetation such as forest, woodland, scrub and grassland to be avoided at different distances within the setbacks. The ultimate perimeter road alignment and widths can be determined during the detailed design stage of the process.
The Bushfire Report and Mr Potter's evidence did not identify scenarios that resembled those raised in submissions from members of the community. Scenarios raised in submissions were more akin to a major industrial explosion or conditions in areas during Black Saturday which do not exist here. The suite of existing and proposed bushfire provisions and assessments will ensure that matters such as evacuation, setback and vegetation are appropriately considered, planned and implemented. It is more likely:
The Committee prefers Council's wording for the Bushfire Management Plan requirements in DPO16 Clause 3.0. This clause is for specifying conditions and requirements for permits. The exhibited and subsequent versions of DPO16 includes permit application requirements which are not enabled by the parent DPO provisions. Council's drafting enables the bushfire requirements to be retained as a permit condition rather than deleting them from DPO16.
Requiring the Landscape Masterplan to include vegetation descriptions set out in Australian Standard AS3959:2018 would help simply future processes. As advised in Planning Practice Note 64, this standard "uses vegetation type and the slope of the land to determine minimum distances between a bushfire hazard and new development".
In line with the Proponent's submission, the Committee considers that bushfire risk can be adequately managed when developing the subject land.
Amend Development Plan Overlay Schedule 16, as shown in Appendix D, to:
a) revise 'Bushfire Management Plan' in Clause 3.0 to translate the application requirement into a permit condition requirement
b) require the Landscape Masterplan in Clause 4.0 to refer to vegetation descriptions set out in Australian Standard AS3959:2018.
The issue is whether the exhibited Integrated Water Management Plan requirements proposed for DPO16 are appropriate.
The Committee considers that the requirements for the Integrated Water Management Plan in DPO16 appropriately provide for an assessment of the impact of the development on waterway health. No party submitted that the development with its planned wetlands and waterway improvements is likely to adversely impact on waterway health.
The Committee concludes that the requirements for the Integrated Water Management Plan in Development Plan Overlay Schedule 16 are appropriate.
The issue is whether the Amendment has appropriately considered and responded to flooding risk.
The Amendment was informed by the Floodplain Assessment. DPO16 requires an integrated water management plan.
Pedestrian bridges unable to be located above the 10 per cent annual exceedance probability (AEP) level must have safety measures, such as a flood response plan, boom gates and signage.
The Committee is satisfied that drainage and flooding issues have been appropriately resolved and that Melbourne Water's issues can be adequately resolved at detailed planning and approvals stages. The Committee supports reference in DPO16 that Melbourne Water's views be sought on the Construction Management Plan and for the Integrated Transport Management Plan and to require road, pedestrian and cycle shared paths that cross over Blind Creek to comply with the relevant Melbourne Water Guidelines. The Committee accepts the Proponent's submission that there is no need to include reference to the Guidelines for areas that are not included in DPO16.
The Committee concludes the Amendment, including requirements for the Integrated Water Management Plan in Development Plan Overlay Schedule 16 appropriately consider and respond to drainage and flooding issues.
Amend Development Plan Overlay Schedule 16, as shown in Appendix D, to:
a) include in the Construction Management Plan requirements in Clause 3.0 that in preparing the Construction Management Plan the views of Melbourne Water must be sought
b) require the Construction Management Plan to include the anticipated location of:
- all internal access tracks and machinery/plant locations including distances from any waterway
- spoil stockpiling and laydown areas including distances from any waterway
The Amendment was informed by the Traffic Assessment.
The issue is whether the modelling for the High Street Road and Nortons Lane intersection signalisation is appropriate.
An assessment of the expected impact of traffic generated by the development on the existing and future road network and any reasonable mitigation measures required to address identified issues, any traffic implications of staging of development as contemplated in the Development Plan, including triggers of provision of connections to the arterial network and local road network and implementation of any mitigation works to the satisfaction of the road authority and the responsible authority.
traffic linked/network modelling using industry recognised traffic modelling software to the satisfaction of the responsible authority and the Head Transport for Victoria.
Like the traffic experts, the Committee agrees that the traffic generation and distribution assumptions are reasonable, that SIDRA network modelling is an appropriate tool and that Head, TfV will decide on the appropriate tool at the time the modelling is done. There is the opportunity for the distribution of traffic and traffic distribution assumptions on High Street Road to be explored further through the proposed Development Plan provisions. This detailed modelling is appropriate to be done at the Development Plan stage.
The Committee agrees with the traffic experts that Nortons Lane/High Street Road intersection can be modelled as a 'stand-alone' intersection and does not need to be included in the network model relating to the George Street/High Street Road intersection and the High Street Road/EastLink Interchange. As a minimum, the network modelling should include George Street / High Street Road intersection and the EastLink / High Street Road Interchange. Whether Cathies Lane / High Street Road intersection is to be included in the network model is a matter to be determined by Head, TfV. The Committee accepts the drafting of DPO16 to include "any other intersections reasonably required to the satisfaction of the responsible authority and the Head, Transport for Victoria."
Amend Development Plan Overlay Schedule 16, as shown in Appendix D, to:
a) revise the traffic assessment requirements for the North-West Development Area and other development areas in Clause 3.0
b) revise the Integrated Transport Management Plan requirements in Clause 4.0
c) require any other intersections to the satisfaction of the responsible authority and the Head, Transport for Victoria.
5.3 EastLink/High Street Road interchange and George Street intersection
The issue is whether the extent and timing of the modelling for the George Street/High Street Road intersection and the EastLink/High Street Road interchange (the Interchange) is appropriate.
Modelling of the George Street / High Street Road intersection and the Interchange is necessary to assess the impact of the development on these intersections. It is appropriate for the Head, TfV to determine the appropriate modelling tool and the scope of the modelling at the time of the assessment, based on the Transport Modelling Guidelines applicable at the time.
It is reasonable that network modelling is not required until a specific development plan is proposing access to a particular intersection.
The George Street / High Street Road intersection is to be upgraded as part of the State Basketball Centre and the Jenkins Orchard development north of High Street Road. The extent of works required by the proposed development needs to be assessed after the current planned upgrades of the intersection are complete. Access from the development to George Street is not proposed until development of the South East Development Area starts.
Amend the Development Plan Overlay Schedule 16, as shown in Appendix D, to revise the 'Integrated Transport Management Plan' requirements in Clause 4.0.
5.4 Nortons Lane and High Street Road intersection
The issue is whether the Nortons Lane and High Street Road intersection is appropriately planned for the traffic projected to be generated by the proposed development.
ConnectEast relied on Mr Sellars' evidence in which he queried the 100 per cent use of the third westbound (through and left turn) lane and expressed concerns that the original ITMP removed the pedestrian crossing.
The Committee agrees with the traffic experts that the Nortons Lane/High Street Road intersection does not need to be included in the network model relating to the George Street/High Street Road intersection and the High Street Road/EastLink Interchange as it is sufficiently distant to not depend on the operation of these intersections to the east.
The Committee agrees with the Proponent that the Nortons Road/High Street Road intersection should be constructed before the first dwelling in the North West Development Area is occupied. This is because there can be considerable time (up to 18 months) between when the statement of compliance for the subdivision is issued and when the first dwelling is occupied. It would be unreasonable to require the intersection to be constructed so far in advance of it being required.
The Committee concludes the Nortons Lane/High Street Road intersection:
Amend Development Plan Overlay Schedule 16, as shown in Appendix D, to include the following Integrated Transport Management Plan requirement in Clause 4.0:
For any development plan in the North-West Development Area as shown on Figure 1 to this Schedule, the upgrade of the intersection of Nortons Lane and High Street Road before the first dwelling in the North-West Development Area in occupied.
Nortons Lane is shown on the Development Plan as providing the sole access to the North West Development Area until there is a connection to the South East Development Area.
Nortons Lane is currently a formed unsealed road providing access to Nortons Park which is part of the Dandenong Valley Parklands, St Pauls Retreat, Riding for Disabled, rural and rural residential properties.
The Traffic Assessment states the Nortons Lane road reserve:
Mr Sellars did not comment on the Norton Road design.
The Committee used functional layout plans for discussion purposes noting they do not form part of the Amendment. While the two-dimensional functional layout plans do not show the likely impact of excavation and other impacts of constructing Nortons Lane, the Committee is satisfied that they are sufficient to determine whether provisions proposed by the Amendment are robust enough to inform future planning decisions.
The full impact of road alignment in response to things such as vegetation protection, paths, sightlines will be determined at the detail design stage. Road design including safety form part of road standards that future designs need to align with so are not needed to be duplicated in DPO16.
A connector road of this nature should include a shared pedestrian/cycle path based on the Victorian Planning Authority guidelines. Both Mr Walsh and Mr Walley agreed that in an ideal situation, Nortons Lane would be constructed as a straight connector road with a 2.5-metre-wide shared path. The road reserve width of 20 metres rather than the standard 25 metres and the need to preserve vegetation make a 2.5-metre-wide shared path difficult to achieve.
It is not mandatory to provide a shared path on a connector road, however it is good planning practice to provide one that connects to existing and future paths and to Nortons Park. The design work to date demonstrates there may be an opportunity to accommodate a seven-metre-wide carriageway and a 2.5-metre shared path within the 20-metre-wide Nortons Lane road reserve when considering the vegetation constraints.
The Committee does not agree with the Proponent that it provide a 1.5-metre-wide pedestrian path and that Council widen it to a 2.5-metre shared path if it so desires in the future. Further, it does not agree that a shared path should not be built simply because it does not presently connect to an existing cycle network. A network connection may occur in the future and surrounding land may be developed to create new destinations.
The current Overall Development Plan shows Nortons Lane as the only access to the external road network for the North West Development Area until the South East Development Area is developed. The Committee agrees with Ms Ring that when considering whether a Development Plan is generally in accordance with an Overall Development Plan that shows Nortons Lane as the access road to the site from the north, a Development Plan that shows an alternative access arrangement would:
If Nortons Lane is not approved as the northern access point, requiring a further planning scheme amendment to enable alternative access would result in process delays and unnecessary resources. It would be prudent to provide some flexibility by showing at least one alternative alignment on the Overall Development Plan.
Amend Development Plan Overlay Schedule 16, as shown in Appendix D, to show an alternative access through part of Crown Allotment 13D Parish of Scoresby in addition to Nortons Lane between High Street Road and the Blind Creek Trail for the North Western Development Area.
The issue is whether the internal road layout for the North West Development Residential Development Area is appropriate.
Council and the Proponent did not make submissions regarding the internal road layout.
The Stage 1 Development Plan includes the internal road layout and typical road cross-sections. The details of the internal road layout are outside the matters referred to the Committee for its advice to the Minister for Planning. The Committee makes no recommendation on the internal road layout, however the Planning Authority should consider:
The Committee concludes that the internal road layout is appropriate but would benefit from:
The Amendment is supported by the Existing Ecological Conditions: Planning Scheme Amendment - 191 George Street, Wantirna South, Victoria prepared by Ecology Heritage Partners, September 2024 (Ecology Report).
To ensure that there is no net loss to biodiversity as a result of the removal, destruction or lopping of native vegetation. This is achieved by applying the following three step approach in accordance with the Guidelines for the removal, destruction or lopping of native vegetation (Department of Energy, Environment and Climate Action, 2025) (the Guidelines):
To manage the removal, destruction or lopping of native vegetation to minimise land and water degradation.
At the Hearing, the Proponent provided a supplementary memorandum of native vegetation implications prepared by Shannon LeBel of Ecology & Heritage Partners. The Proponent submitted the memorandum advises:
Ecology experts, Dr Lorimer and Mr Gibson met to determine points of agreement or disagreement. In their joint expert report, they agreed:
Dr Lorimer's evidence appended his peer review which states:
Dr Lorimer and Mr Gibson agreed that Latham's Snipe habitat exist on the subject land.
Mr Gibson's evidence regarding 'significance' assessment:
Mr Gibson's evidence regarding ESO2 - The following information is required for the ESO2 area to be deleted and for the ESO2 area impacted along Nortons Lane:
Dr Lorimer and Mr Gibson agreed the southeast patch including trees B89-B94 should be protected from removal. Mr Gibson agreed, while noting if it is possible.
The Proponent proposed the following requirement in DPO16 Clause 4.0:
A detailed assessment of trees B89-94 and associated Valley Heathy Forest within the south-east corner of the DPO16 area and whether any of these trees can be retained.
DEECA subsequently advised the Biological Sites Criteria is not relied on by DEECA for current planning scheme, planning permit or biodiversity decision making.
Dr Lorimer and Mr Gibson agreed the alternative route through part Crown Allotment 13D/ PP 3478 (1180 High Street Road Wantirna South) would have a significantly lower ecological impact than the Nortons Lane route. Mr Gibson was not sure it would be feasible.
Council requested the Site Context Analysis and Design Response Report in DPO16 Clause 4.0 include:
If it is proposed to utilise Nortons Lane for access to the North-West Development Area shown on Figure 1 to this Schedule, a flora and fauna inventory and biodiversity values assessment of the Nortons Lane road reserve, how it is proposed to maintain the inventory and biodiversity values and, if not possible to maintain the inventory and biodiversity values, how it is proposed to minimise the loss of the flora and fauna and biodiversity values.
The Proponent agreed to this change and included it in DPO16 (Version 3). The Proponent also proposed to include the following Masterplan requirement in Clause 4.0:
In relation to the North-West Development Area as shown on Figure 1 to this Schedule, any proposed upgrade of the road within the Nortons Lane road reserve must preserve Trees 45 and 46 (as shown at Figure 3a, Supplementary Memorandum of Native Vegetation Implications for Planning Scheme Amendment C194 to the Knox Planning Scheme prepared by Ecology & Heritage Partners Pty Ltd dated 9 October 2025).
The Committee is considering draft documents that will form part of a future Amendment. This includes whether existing and future Planning Scheme provisions such as DPO16 will create an appropriate planning framework to ensure flora and fauna issues have been appropriately considered and that responsible fit-for-purpose measures are in place. Where flora and fauna matters have to be resolved at this stage of the process, there should be provisions in place to ensure certain use and development does not start until they are.
Among other relevant Planning Scheme planning provisions, Clause 51.17 requires a planning permit for any proposal seeking to remove native vegetation from the subject land. The purpose of this clause refers to the three step approach (avoid, minimise, offset) in accordance with the Guidelines for the removal, destruction or lopping of native vegetation (Department of Environment, Land, Water and Planning, 2017).
The continuous changing information regarding vegetation along Nortons Lane demonstrated two things. Firstly, it supported Council's view that the extent of native vegetation to be removed was unclear when the Amendment and development plan were prepared. Secondly, it would be premature to identify many of the trees for retention at this stage of the process. This does not mean that native vegetation will not be appropriately considered before substantive permits are granted.
The exhibited DPO16 broadly referenced protection measures for flora and fauna in the Environmental Management Plan requirements. However, this plan is a requirement for a planning permit (not the development plan) and is intended to manage issues during construction.
What was notably absent is the requirement for a flora and fauna assessment, as requested by DEECA. There should be some guiding provisions based on known information rather than the broad provision proposed in DPO16 (Version 1).
The Committee prefers the flora and fauna provisions in DPO16 (Version 3) that:
The flora and fauna assessment will identify relevant species including Lathan's Snipe that both ecology experts agreed had a habitat on the subject land.
The DPO16 (Version 3) provisions combined with existing Planning Scheme provisions will provide an appropriate planning framework to ensure that flora and fauna are appropriately considered before substantive permits are granted.
For clarity, the relevant Victorian and federal legislation should be relied on when assigning significance without referencing the redundant Biodiversity Sites Criteria.
Amend Development Plan Overlay Schedule 16, as shown in Appendix D, to:
a) expand flora and fauna considerations as part of the Environmental Management Plan in Clause 3.0
b) require a flora and fauna assessment in Clause 4.0
c) require the Site Context Analysis and Design Response Report to include a flora and fauna inventory and biodiversity values assessment and associated requirements if the Nortons Lane road reserve is used to access the North-West Development Area
d) require the Masterplan to preserve the Yarra Gums (Trees 45 and 46) in the Nortons Lane road reserve.
The issue is whether DPO16 should include requirements to manage kangaroos.
The Proponent agreed with DEECA that staging should consider kangaroo movements across the subject land. Council preferred the Kangaroo Management Plan be prepared as part of the Development Plan process and implemented through permit conditions rather than deferring to the planning permit stage.
DEECA, Council and the Proponent proposed kangaroo management provisions for DPO16 Clauses 3.0 (Conditions and requirements for permits) and 4.0 (Requirements for development plan).
Table 7 Preferred DPO16 kangaroo management provisions
A permit to subdivide land must include a condition for the preparation of a Kangaroo Management Plan, in accordance with the Guidance Note for managing kangaroos in Victoria's growth areas (DEECA September 2024), to be submitted to and approved by the responsible authority. Once approved the Kangaroo Management Plan will form part of the permit and must be implemented to the satisfaction of the responsible authority.
A permit granted for buildings and works or subdivision of land must include such permit conditions as required to implement the Kangaroo Management Plan approved and endorsed by the responsible authority in accordance with this schedule.
A Kangaroo Management Plan must be prepared to the satisfaction of and approved by the Secretary to the Department of Energy, Environment, and Climate Action Once approved by the Secretary to the Department of Energy, Environment, and Climate Action, the Kangaroo Management Plan be endorsed by the responsible authority to form part of the development plan.
A permit granted for buildings and works or subdivision of land must include a condition requiring, as appropriate:
The Committee considers it appropriate to include kangaroo management provisions in DPO16. DEECA, Council and the Proponent all agreed to them, though they originally had different perspectives on how they should be drafted and implemented. All three parties ultimately agreed to the drafting of the Clauses 3.0 and 4.0 provisions. The Committee has no issue with these provisions.
Amend Development Plan Overlay Schedule 16, as shown in Appendix D, to:
a) revise the Kangaroo Management Plan requirements in Clause 3.0
b) revise the Masterplan requirements to require details of the likely staging of land use and development to avoid landlocking kangaroos.
The issue is whether the exhibited Environmental Management Plan requirements proposed for DPO16 are appropriate.
A permit granted for subdivision of land or buildings and works must include conditions requiring that an Environmental Management Plan addressing the construction activities proposed on the land be prepared to the satisfaction of the responsible authority and approved and endorsed by the responsible authority prior to the commencement of works or the certification of the first stage of subdivision (as the case may be). In preparing the Environment Management Plan, the views of the relevant authorities (Melbourne Water, Parks Victoria, Department of Transport and Planning, and Department of Energy, Environment, and Climate Change) must be sought:
Once endorsed, the Environment Management Plan shall form part of the permit.
DPO16 (Version 1) included changes sought by DEECA and Council, except for the reference to noise. Council maintained that referencing both noise and dust emissions would protect the amenity of the surrounds during construction activities. DPO16 (Version 2) included reference to noise.
DPO16 (Version 2) includes Environmental Management Plan provisions, generally agreed to by DEECA, Council and the Proponent. The plan should be to the satisfaction of the responsible authority, consistent with other plans that will be required through planning permit conditions.
The Environmental Management Plan should include measures to supress noise and dust during works to minimise impact. The Committee agrees with Council that the plan should include measures which seek to protect the amenity of the surrounding area during construction. This includes supressing noise and dust during works.
The provisions relating to soil erosion and sediment control should be extended to apply also to the construction of buildings.
The Committee concludes that the Environmental Management Plan requirements in Clause 3.0 of Development Plan Overlay Schedule 16 should:
Amend Development Plan Overlay Schedule 16, as shown in Appendix D, to revise the Environmental Management Plan requirements in Clause 3.0.
6.5 Environmental Significance Overlay Schedule 2
The issue is whether it is appropriate and justified for the Amendment to remove the proposed extent of ESO2.
ESO2 (Sites of biological significance) applies to a notable proportion of the subject land including areas which have had years of quarrying. Its statement of environmental significance states:
The area covered by this schedule includes a range of sites of biological significance identified in Sites of Biological Significance in Knox - 2nd Edition, 2010. Their protection and appropriate management is of particular importance for the maintenance of both Knox's and Victoria's biodiversity, as well as for liveability and the health and wellbeing of the community. The area covered by this overlay is 26.42 square kilometres or 23.12 per cent of the Knox municipality.
Figure 5 Areas where the Amendment proposes to delete ESO2

The purpose of ESO is to identify areas where the development of land may be affected by environmental constraints, and to ensure that development is compatible with identified environmental values.
It is acknowledged that ESO2 has been applied throughout Knox to identify shared biodiversity values. This includes smaller open spaces such as the one sought to accommodate Trees B89-94.
It would not be appropriate to retain ESO2 within the developable area.
The absence of ESO2 on the south-east corner of the subject land does not mean that other planning provisions should not be applied if further investigation finds this vegetation should be protected. The DPO16 provisions and other Planning Scheme provisions such as Clause 52.17 can appropriately guide planning around Trees B89-B94. Specific DPO16 provisions regarding these trees and whether they should be accommodated on open space are discussed in Chapter 6.6.
The Committee concludes that it is appropriate and justified for the Amendment to remove the proposed extent of Environmental Significance Overlay Schedule 2.
The issue is whether a local pocket pack should be established in the south-east corner of the DPO16 area to retain Trees B89-B94 and associated Valley Heathy Forest.
DEECA submission - The establishment of a local pocket park in the south-east corner of DPO16 should be investigated to retain Trees B89-B94 and associated Valley Heathy Forest.
DEECA agreed with the Proponent's change subject to identifying a pocket park in the south-east corner of DPO16.
The Committee agrees with Dr Lorimer that Trees B89-B94 should be considered collectively as part of the Valley Heathy Forest. This can be achieved through the Proponent's proposed Masterplan requirement for a detailed assessment of these trees and consideration of whether they can be integrated into a future council reserve.
The Committee concludes Development Plan Overlay Schedule 16 should require through the Masterplan process, a detailed assessment of Trees B89-B94 and associated Valley Heathy Forest and consideration of a council reserve to accommodate them.
Amend Development Plan Overlay Schedule 16, as shown in Appendix D, to require the Development Plan in Clause 4.0 to be supported by a flora and fauna assessment that must assess Trees B89-B94 consider whether any should be retained.
The issue is whether the affordable housing contribution requirements proposed in DPO16 are appropriate.
The Development Facilitation Program webpage refers to the Victorian government seeking 10 percent of affordable housing delivered by one of three options. Regarding Option 1, it advises:
The Knox Affordable Housing Action Plan (2015) recommends that 5 per cent of all new dwellings be provided as affordable housing.
DPO16 includes a development plan requirement for a section 173 agreement for affordable housing contribution in the form of:
Council included a version of DPO16 which tracked its requested changes.
The Proponent provided DPO16 (Version 1) which included a new set of 'Section 173 Agreement for Affordable Housing Contribution' requirements which, among other things:
The Proponent revised DPO16 (Versions 2 and 3) so that the 'Section 173 agreement for Affordable Housing Contribution' requirements required the section 173 agreement for affordable housing contribution to be registered on title before the first statement of compliance in the North-West Development Area is issued rather than when development starts. Council agreed to this change.
There is general agreement between the Proponent and Council on the affording housing provisions in DPO16 (Version 3) and are more practical and suitable than the exhibited version. The Committee agrees with Ms Ring that these are suitable provisions for delivering affordable housing because they:
The Committee concludes the affordable housing contribution requirements proposed in Development Plan Overlay Schedule 16 (Version 3) are appropriate.
Amend Development Plan Overlay Schedule 16, as shown in Appendix D, to revise the 'Section 173 Agreement for Affordable Housing Contribution' requirements.
The issue relates to the impact the future population enabled by the Amendment will have on existing recreational uses and facilities including Saint Paul's Retreat Centre.
Saint Paul's Retreat Centre is at Nortons Lane, Wantirna South, west of the subject land, east of the Dandenong Valley Parklands, and south of Nortons Park.
The Proponent relied on Ms Ring's evidence regarding this issue.
The Committee agrees with Ms Ring's evidence on the issue of recreational uses and facilities.
The public and private recreational uses and facilities need to be understood within their different contexts. The private land including St Paul's Retreat Centre, Riding for the Disabled facility, and private residents are on land in the Farming Zone.
The Farming Zone is anomalous because it is a rural zone that should only be applied outside Melbourne's Urban Growth Boundary. This zone may have been applied because this land is almost entirely surrounded by the Public Park and Recreation Zone which forms part of the regionally-scaled Dandenong Valley Parklands. The Parklands north of the subject land towards the Knox Regional Sports Park along George Street.
Nortons Lane which binds these properties has an unmade road surface except for the first 100 metres south of High Street Road. It terminates next to the St Paul's Retreat Centre, resulting in few vehicles needing to use the road. These factors collectively present the Nortons Lane surrounds in a rural setting. One could forget they are in an urban area about 20 kilometres southeast of Melbourne's Central City and about three kilometres from the Glen Waverley and Knox activity centres.
The existing recreational uses and facilities have benefitted from this rural style setting. They will continue to benefit from their properties being mostly surrounded by Dandenong Valley Parklands. The question is whether the proposed Nortons Lane upgrade, increased traffic volumes and new urban interface will result in an acceptable impact on existing recreational uses and facilities.
The Committee was not presented with information to demonstrate there would be an unacceptable impact on existing recreational uses and facilities. No indicative or concept plan proposed to block access to any property. The Committee has already found the expected peak period traffic volumes will be relatively low.
The proposal seeks to transform a former industrial use (quarry and brickworks) into a new residential area. A dwelling is considered to be a sensitive land use that emits little noise. The General Residential Zone proposed to be applied to the subject land is one of the most harmonious zones to interface with the parklands and lower density properties around Nortons Lane.
The Committee agrees with Ms Ring that the existing recreational uses and facilities are on large scale sites that can help buffer them from the future nearby houses. From a reverse amenity perspective, the large sites enable these uses and facilities to accommodate their activities on-site without the need to encroach beyond their property boundary.
Nortons Lane area will evolve when the road is upgraded and the proposed development is completed. There was no information or policy objectives that sought to retain Nortons Lane as an unmade road. Its existing condition is most likely due to insufficient demand to justify its upgrade. Even after its upgrade, it will retain a proportion of its character because it will continue to be surrounded by mostly parklands and recreational uses and facilities in the Public Park and Recreation Zone and Farming Zone. Only a small portion to its southern end will interface with the General Residential Zone.
If current residents, members and visitors to the area currently enjoy a peaceful environment, then it agrees with Ms Ring that increased activity will impact them, though it will be an acceptable impact. However, no submission clearly explained what they currently experience because they did not refer to previous and current impacts resulting from an active quarry, and subsequent works to fill the land since its operations ended. Both instances involve heavy machinery and truck movements.
This information would have enabled the Committee to compare the difference between future activity comprising relatively quiet light vehicles, cyclists and pedestrians with years of noise and activity associated with the neighbouring quarrying and brick manufacturing uses. The Committee is therefore unable to conclusively conclude the future activity will be a disbenefit when compared to existing and historic circumstances.
When considering future activity alone, the Nortons Lane upgrade and future development on the subject land will result in an acceptable outcome on existing recreational uses and facilities.
In either case, the Committee agrees with Ms Ring that the net community benefit of achieving state and local policy objectives related to housing and urban consolidation outweigh any disbenefit to the existing recreational uses and facilities.
The Committee concludes the proposed planning provisions will establish an appropriate planning framework to guide future development on the subject land so that potential impact on existing surrounding recreational uses and facilities including Saint Paul's Retreat Centre can be managed or mitigated.
7.3 Drafting matters associated with the referred issues
Throughout the Hearing process, parties proposed drafting changes to DPO16 planning provisions which related to referred issues and issues outside the scope of the Committee's consideration. The Committee has:
The purpose of the Committee recommended DPO16 in Appendix D is to show the Committee's tracked recommended changes within the context of other provisions in that schedule.
Amend Development Plan Overlay Schedule 16, as shown in Appendix D, to make drafting changes that will improve the clarity and operation of planning provisions related to referred issues.
Amend the Development Plan to make it consistent with changes recommended for Development Plan Overlay Schedule 16.
REFERRAL OF DRAFT PLANNING SCHEME AMENDMENT C194knox TO THE PRIORITY PROJECTS STANDING ADVISORY COMMITTEE - 191 GEORGE STREET, WANTIRNA SOUTH
I refer to draft Knox Planning Scheme Amendment C194knox. I am considering whether to prepare, adopt and approve the draft amendment and the draft Wantirna South North-West Residential Area Development Plan (Stage 1 Development Plan).
The draft amendment seeks to enable redevelopment of the 171-hectare Boral Quarry site at 191 George Street, Wantirna South, and 1257 Ferntree Gully Road, Scoresby. The land was previously used for clay extraction and brick manufacturing. The redevelopment will facilitate a new residential and mixed-use community with a projected yield of 1,750 dwellings including areas of public open space, community infrastructure, a network of paths and trails and a 10 per cent affordable housing contribution. It is also proposed as part of the draft amendment to transfer 68 hectares of future parkland to the state as an extension to the adjoining Dandenong Valley Parklands.
The request also seeks approval for the Draft North-West Residential Area Development Plan (Stage 1). Stage 1 is located in the north-west of the site, proposing approximately 320 residences and the provision of a large active open space reserve with a pavilion and playground, a series of smaller open spaces and a network of paths and trails. It will also establish a primary, direct access route to High Street Road through Nortons Lane (located outside of the development site), requiring upgrades to Nortons Lane.
Consultation under section 20(5) of the Planning and Environment Act 1987 was undertaken between in May and June 2025. There were 98 public submissions to the draft amendment, as well as submissions from Knox City Council and several government agencies.
I have decided to refer all submissions to the Priority Projects Standing Advisory Committee under section 151 of the Act for advice on the draft amendment and draft development plan.
The issues arising from submissions that I seek the advisory committee's advice on are:
I request that the advisory committee's advice be confined to the matters outlined above. To the extent that the referred submissions raise issues beyond the matters outlined above, the committee is not required to consider or report on those issues.
The draft amendment and development plan documentation, including the supporting documents, and the submissions will be provided to the committee. The cost of the committee process will be met by the proponent, Mirvac.
a) Strategic Assessment Planning Report
b) 53V Environmental Audit 191 George Street, Wantirna South
c) 53V Environmental Audit 191 George Street, Wantirna South - Appendix B
d) 53V Environmental Audit 191 George Street, Wantirna South - Appendix C
e) Approved Cultural Heritage Management Plan (No 16890) - Part 1
f) Approved Cultural Heritage Management Plan (No 16890) - Part 2
g) Bushfire Development Report
h) Community Infrastructure Assessment
j) Ecology Report
k) Engineering Services Report
m) Floodplain Assessment Report with Appendix
n) Geotechnical Strategy Report
o) Non-Residential Land Use Opportunities Assessment
p) Odour Report
q) Preliminary Site Investigation
r) Section 173 Draft Agreement - Dandenong Valley Parklands
s) Separation Distance Assessment
t) Traffic Assessment
u) Traffic Noise Assessment
y) Stage 1 Development Plan (Wantirna South Development Plan - North-West Residential Area)
z) Stage 1 Development Plan Appendices Part 1
aa) Stage 1 Development Plan Appendices Part 2
Summary of intended amendments to the exhibited documents
a) Preliminary advice potentially contaminated land 5 June 2020
b) Further advice potentially contaminated land and separation distance assessment, 24 July 2020
c) Advice on noise, dust and odour, 2 July 2021
d) Advice on draft provisions, 24 March 2024
e) Response to odour risk, 11 August 2022
f) Assessment of previous advice and current views, 1 July 2024
g) Advice on potentially contaminated land and odour, 30 June 2025
Expert report - Jason Sellars (traffic and transport engineering)
Expert report - Aaron Walley (traffic and transport)
Version 1 - Development Plan Overlay Schedule 16 (DPO16)
Version 1 - Proposed drafting changes to provisions
Version 1 - North West Residential Area Development Plan
North West Residential Area Development Plan Statement of Changes
Supplementary memorandum - Stuart Colls (geotechnical)
Supplementary memorandum - Matthew Gibson (ecology)
Supplementary memorandum - Rob Galbraith (arboriculture)
Draft Flora and Fauna Assessment (Biosis, 12 October 2025)
Draft Nortons Lane Assessment (Biosis, 12 October 2025)
Signed statement of agreed opinions and fact (ecology)
a) Yarra Ranges Planning Scheme Comprehensive Development Zone Schedule 1
b) Sites of biological significance in Knox (Second edition)
c) Sites of biological significance in Knox (Third edition)
d) Standard criteria for sites of biological significance
e) Whittlesea Planning Scheme Development Plan Overlay Schedule 40
Email to the EPA - invitation to participate at the Hearing
a) Blind Creek-Lewis Park improvements webpage
b) Constructing waterway crossings - A guide on building road crossings across Melbourne Water's waterways and drains
c) Healthy Waterways - Dandenong Catchment
d) Ministerial Direction 1 - Potentially contaminated land
e) DPO16 (Melbourne Water version)
f) Planning Practice Note 11 (Applying for a planning permit)
g) Planning Practice Note 12 (Applying the Flood Provisions)
h) Planning Practice Note 30 (Potentially contaminated land)
a) DEECA response letter dated 16 June 2025
b) Summary table - DEECA position and response to Proponent
Council meeting agenda - 26 August 2024 regarding Knox Cycling Action Plan
Council meeting minutes - 26 August 2024 regarding Knox Cycling Action Plan
a) Draft DPO16
b) Letter to DTP, 26 June 2025
c) Land titles of land adjacent to 191 George Street
Planning Permit P/2024/6360 for 1166 High Street Road, Wantirna South
Supporting documents for permit P/2024/6360 Badminton centre plans
Supporting document for permit P/2024/6360 - Arboriculture Report
Exhibited DPO16 and Proponent's DPO16 Version 2 (Comparison)
Exhibited DPO16 and Proponent's DPO16 (Version 3) - (comparison)
Letter - comments on Proponent's DPO16 version 3 and outstanding matters
Appendix D Panel recommended version of Development Plan Overlay Schedule 16
The Committee recommended changes are based on the exhibited version of the provisions and are shown as: Tracked Added Tracked Deleted
Only tracked changes within the scope of matters referred to the Committee are shown.
SCHEDULE 16 TO CLAUSE 43.04 DEVELOPMENT PLAN OVERLAY
To encourage sustainable development and high-quality urban design within the residential area which complements the future extension of the Dandenong Valley Parklands into the site.
To provide housing choice within Knox with the development of a variety of lot sizes and housing types.
To provide local amenity with the delivery of a variety of open spaces, including active open space, as well as community facilities and retail within a small Neighbourhood Activity Centre.
To establish open space networks, landscaping and walking/cycling trails which integrate the residential development with the future Dandenong Valley Parklands extension and connect to the wider transport network.
To provide for physical and social infrastructure and the orderly staging of the development.
A permit may be granted before a development plan has been prepared to the satisfaction of the responsible authority to:
A permit for the subdivision, use or development of land prior tobefore the development plan being prepared to the satisfaction of the responsible authority must ensure that any residual contamination of the land (including landfill gas) is managed by:
Any application for a permit lodged before a development plan has been approved must be accompanied by a report demonstrating that approval will not prejudice the long-term future of the land as set out in this schedule. This applies to an application under existing use provisions.
The following conditions and/or requirements apply to any permits, including a permit granted under this schedule:
The following conditions and/or requirements only apply to a permit granted after a development plan has been approved to give effect to the development plan to the satisfaction of the responsible authority:
A permit granted for subdivision that creates land to contain community infrastructure in former quarry pit areas, including open space, must include a condition that requires the owner to provide evidence that any Council infrastructure has been designed to accommodate the maximum anticipated ground movement established in the geotechnical remediation design and any adjustments based on actual settlement monitoring during and after the geotechnical remediation works.
Section 173 Agreement for Affordable Housing Contribution
The responsible authority must include the following condition in deciding to grant a permit:
Unless otherwise agreed to by the responsible authority, a permit for the first subdivision of the Subject Land that creates residential lots must include a condition requiring the landowner to enter into an agreement with the responsible authority under section 173 of the Planning and Environment Act 1987 to deliver affordable housing (as defined by the Planning and Environment Act 1987) in respect of the whole of the Subject Land. The agreement must be in a form to the satisfaction of the responsible authority and registered upon the title to the Subject Land before the first statement of compliance is issued in the North-West Development Area.
The agreement must provide for the provision of an affordable housing contribution equal to 3% of the Development Cost (Primary Obligation) or equivalent to be delivered as:
provided the total value of the affordable housing contribution is equivalent to the value determined as the Primary Obligation.
Development Cost means the estimated construction cost of the subdivision works for the delivery of the residential land allotments across the Subject Land, being the provision of roads, sewerage, drainage, water supply, power, telephone and National Broadband Network, but excluding any costs associated with the remediation of the land relating to former quarrying activities, to the satisfaction of the responsible authority.
Subject Land means that land identified as 'Residential Development Area' on Figure 1 of this schedule.
The agreement must specify the timing of the delivery of the affordable housing contribution and a mechanism for the reporting of the outcome to the responsible authority.
The landowner must pay the responsible authority's and Knox City Council's reasonablefor all costs of preparing, executing, amending, and registering the agreement on the certificate of title to the land.
Section 173 Agreement for Development Contributions
A planning permit granted for the subdivision of the land that creates residential lots, the use or development of the land, must if required by the responsible authority and Knox City Council,, include a condition that requires prior the issue of a statement of compliance or such other date agreed with the responsible authority and Knox City Council, to the commencement of development (excluding demolition, bulk excavation and site preparation works) or other date agreed to the responsible authority, the landowner to enter into an Agreement with the responsible authority and Knox City Council pursuant to Ssection 173 of the Planning and Environment Act 1987 which provides for the following matters:
all generally in accordance with Figure 1 of this Schedule.
The agreement must be in a form to the satisfaction of the responsible authority and Knox City Council.
The landowner must pay responsible authority's and Knox City Council's reasonablefor all costs of preparing, executing, amending, and registering the agreement on the certificate of title to the land.
A permit granted for use or development of the land must, if required by the responsible authority, include conditions, as appropriate, for the preparation and endorsement of plans, and the implementation of the endorsed plans related to:
A permit granted for buildings and works or subdivision of land must include a condition requiring that prior tobefore:
any restrictions on the plan of subdivision including relevant "Design Guidelines" and / or Memorandum of Common Provisions must be submitted to the responsible authority for approval and recorded on title for all relevant lots to the satisfaction of the responsible authority.
Prior to the certification ofBefore the Plan of Subdivision is certified for each stage of subdivision, a building envelope plan for each lot (between 250-500smq) must be submitted to and endorsed by the Responsible Authority. The approved building envelopes must be applied as a restriction on the plan of subdivision or be applied through an agreement with the responsible authority under Ssection 173 of the Planning and Environment Act 1987 that is recorded on the title to the land. The restriction or the agreement must provide for:
A permit granted for buildings and works or subdivision of land must include a condition requiring for, as appropriate:
A permit granted for subdivision of land or buildings and works must include conditions requiring that an Environmental Management Plan addressing the construction activities proposed on the land be prepared to the satisfaction of the responsible authority and approved and endorsed by the responsible authority prior tobefore the commencement of works or the certification of the first stage of subdivision. The (as the case may be). In preparing the Environment Management Plan, the views of the relevant authorities (Melbourne Water, Parks Victoria, Department of Transport and Planning, and Department of Energy, Environment, and Climate Change) must be sought.
Once and the Plan must be prepared to the satisfaction of the responsible authority and, once endorsed, the Environmental Management Plan shall form part of the permit.
endorsed, implemented prior to commencement of any works.
A permit granted for residential subdivision of land or buildings and works must include Conditions requiring that a Construction Management Plan be prepared to the satisfaction of the responsible authority prior tobefore the commencement of works start or the certification of the first stage of subdivision is certified, and, once endorsed, implemented prior to commencement ofbefore any startworks. In preparing the Construction Management Plan, the views of Melbourne Water must be sought.
The Construction Management Plan must include as relevant:
Unless otherwise agreed to by the responsible authority, a permit must not be granted to subdivide land, construct a building or construct or carry out works within the 'Protection
Measure Area' as identified on Figure 1 of this Schedule (except for a permit issued in accordance with Clause 2.0 of the Schedule) until an agreement under section 173 of the Planning and Environment Act 1987 has been entered into between the owner of the land and the responsible authority which provides for the following:
Unless otherwise agreed to by the responsible authority and Knox City Council (where Council is not otherwise the responsible authority), a permit to subdivide land, construct a building or construct or carry out works within the 'Protection Measure Area' as identified on Figure 1 of this Schedule (except for a permit issued in accordance with Clause 2.0 of the Schedule) must contain a condition that the landowner enter into an agreement under section 173 of the Planning and Environment Act 1987 which provides for the following:
Include a mechanism for the section 173 agreement to come to an end if an Environmental Auditor verifies that protection measures are no longer required as land within the 'Protection Measure Area' is no longer subject to risk from landfill gas migration.
The following requirements apply to all permits, as determined as appropriate to the application by the responsible authority:
Landfill Gas Protection Measures - Buildings and Works in Confined Spaces
Unless otherwise agreed to by the responsible authority and Knox City Council (where Council is not otherwise the responsible authority), a permit to subdivide land within the 'Protection Measure Area' as identified on Figure 1 of this Schedule (except for a permit issued in accordance with Clause 2.0 of the Schedule) must contain a condition that a statement of compliance is issued, the landowner must enter into an agreement under section 173 of the Planning and Environment Act 1987 which provides that all buildings or works containing confined spaces proposed within the landfill gas 'Protection Measure Area' must have gas protection measures designed and constructed, in accordance with the following:
A legal entity must have the ongoing responsibility and capability for the installation, operation and maintenance of the gas protection measure(s). Where this cannot be met, to protect low to medium density residential development, a boundary interception trench is acceptable. The design requires Auditor verification and construction quality assurance to be conducted.
Provide that where an Auditor identifies gas protection measures as having ongoing requirements for monitoring, reporting and/or maintenance, the owner of the lot or lots the subject of the gas protection measures is/are required to undertake the monitoring, reporting and maintenance (as the case may be) at the landowner's cost.
A permit for the subdivision, use or development of land must ensure that any contamination of the land (including landfill gas) is managed by:
Where recommendations of an Environmental Audit require ongoing maintenance and/or monitoring, the applicant must enter into an agreement with the responsible authority and Knox City Council (where Council is not otherwise the responsible authority) under section 173 of the Planning and Environment Act 1987. The section 173 agreement must identify the legal entity or entities that will be responsible for ensuring that any ongoing maintenance and/or monitoring measures are in place and implemented, and give effect to the ongoing maintenance and/or monitoring recommendations of the Environmental Audit. The section 173 agreement must be executed on the title of the relevant land. The applicant must meet all costs associated with the drafting and execution of the agreement, including those incurred by the responsible authority and Knox City Council.
An application for residential subdivision, use or development for a sensitive use within in the development area east of Blind Creek, must be accompanied by a plan to identify the location of the acoustic attenuation measures which considers the indicative location set out in the Traffic Noise Assessment (Marshall Day, June 2023) and designed to enable predicted compliance with the target noise objective at all ground floor locations within the development as set out in the Traffic Noise Assessment prepared by Marshall Day (June 2023).
The Plan should also outline any building design requirements for the housing (if required) to achieve compliance.
An application for residential subdivision or buildings and works must be accompanied by a bushfire management plan that achieves a bushfire resilient development during staging of the development and for the completed development by addressing the following requirements, which must demonstrate:
A permit for residential subdivision or buildings and works must contain a permit condition that, before the subdivision or buildings and works start, the landowner must prepare and submit for the responsible authority's approval a bushfire management plan. The bushfire management plan must contain the following requirements to the satisfaction of the responsible authority:
For land outside of the residential development area containing a permanent bushfire hazard adjoining the development:
Traffic Assessment - North-West Development Area
If required by the Responsible Authority and the Head Transport for Victoria, an application for residential subdivision within the North-West Development Area as shown on Figure 1 to this Schedule must include a traffic assessment of the expected impact of traffic generated by the development on Nortons Lane and the intersection of Nortons Lane and High Street Road. The traffic assessment must have regard to the Integrated Transport Management Plan included in the relevant development plan.
If required by the Responsible Authority and the Head Transport for Victoria, an application for residential subdivision (except for an application to subdivide land within the North-West Development Area as shown on Figure 1 to this Schedule) must include a traffic assessment of the expected impact of traffic generated by the development on the existing and future road network including the impact on nearby intersections (George Street and High Street Road, and EastLink and High Street Road). The traffic assessment must have regard to the Integrated Transport Management Plan included in the relevant development plan.
Unless otherwise agreed with the Responsible Authority an application for residential subdivision must include traffic linked / network modelling of future conditions predicated on a distribution analysis of generated traffic having regard to:
A development plan must be generally in accordance with the Overall Development Plan (Figure 1) of this schedule. A dDevelopment pPlan may be prepared in stages.
A development plan must include the following as relevant, all to the satisfaction of the responsible authority:
Preparation of an updated Flora and Fauna Assessment, including a native vegetation retention and removal plan in consultation with DEECA.
Any development plan relating to the South-East Development Area as shown on Figure 1 to this Schedule must include a detailed assessment of trees B89-94 and associated Valley Heathy Forest within the south-east corner of the DPO16 area and whether any of these trees may be retained.
Site Context Analysis and Design Response Report
An assessment of the site context and design response including:
The Integrated Transport Management Plan must include:
Construction and Environmental Management Concept Plan
A Construction and Environmental Management Concept Plan to address works in proximity to transmission lines, the landfill gas risk assessment, environmental audits and analysis of staging requirements of traffic works identified in the Integrated Transport Management Plan.


The costs of the Advisory Committee will be met by each relevant proponent.
[1] Mr Potter was not called to present at the Hearing after the Committee and parties indicated they had no questions