[2003] VSC 120
Supreme Court of Victoria
2003-04-24
HABERSBERGER J.
Original judgment source is linked above.
[2003] VSC 120
CONTRACT - Agreement to make airship available for use at the Sydney Olympic Games - Whether contract repudiated - Whether non-refundable deposit recoverable by innocent party - Total failure of consideration. TRADE PRACTICES - Misleading and deceptive conduct - Accessorial liability - Sections 51A, 52, 58 and 75B of the Trade Practices Act 1974 (Cth).
"This will have a great impact on the public, considering the huge television audience at the Olympic Games and other sporting events."
Palmer also provided Bhatia with some information about CCP. It was said in the letter that CCP was incorporated in 1998 "as a single purpose management company for this venture" and that it was proposed "to change its structure and become a limited company in the immediate future". The following information was also given about the three current directors of CCP:
50 years. Doug Cahill, Partner, Cahills Solicitors, Bendigo, one of the oldest and largest country Victorian legal practices. Cahill holds an unrestricted pilots licence and is a Major in the Army Reserve (Legal Corps). He is and has been a prominent director of many companies including a number listed on the ASX. He brings a vast amount of Corporate experience with him.
58 years. Robert Palmer is a public servant with the Australian Securities Investments Commission ('ASIC') and previously with the Corporate Affairs Office, Victoria. Prior to these positions he was employed by ACMIL-ACI as a contracts manager. Palmer has been self-employed as a consultant, assisting ailing businesses. He is an inventor and one of the pioneers involved in fibreglass reinforced plastics for industrial and commercial use, researching, developing, building and promoting plastic swimming pools in Victoria in the 1960s and 70s. This was one of many plastic applications he has been involved with.
32 years. Gary Walsh graduated at RMIT and has extensive experience in the automotive industry. Gary has been a company director of two successful companies in the food and building industries. With seven years experience in the Army in the area of maintenance and logistics in aircraft, Gary brings a vast amount of knowledge, experience and enthusiasm with him. Gary will commence with CCP in January 2000."
"I have stressed to him the need for quick decisions in relation to the Olympics and he understands the need for a decision within a few days." [Underlining in original]
In a facsimile dated 7 October 1999, Palmer and Walsh wrote to Olma stating that a potential advertiser had "now missed the Olympic Games window". [Underlining in original]
"I have advised all that Christmas is the deadline. All paperwork an[d] order for an airship placed and a deposit paid if we are going to the Games."
Olma faxed a handwritten response on the same day, part of which read as follows:
"We will not commit to a delivery for the Olympics, or even try, for an order as late as you describe above." [Underlining in original]
At first Palmer denied receiving the response and became very indignant when this denial was challenged. He was then taken to an email from him to Taylor and his associate Al Gross, dated 25 November 1999, in which he quoted the above passage from Olma's response. (Apparently the response had been sent to Cahill because Palmer's machine had been turned off, but obviously Palmer did read it on or before 25 November.) In the email to Taylor and Gross, Palmer said that Olma believed he could deliver in time for the Olympic Games if the order was placed by 9 December.
"$1,500,000 has already been invested by Ray Olma of Canada."
On any view, this was not a correct statement - nothing had actually been invested by Olma. When Palmer was pressed about this statement, he explained that Olma agreed to reduce the price of the airship by $1.5 million. Walsh said much the same thing. When it was put to Palmer that this was a promise rather than an actual investment by Olma, he said:
"Well, I took it to be an actual investment ... . He assured me that he would invest in the company and I took him at his word."
This business plan sought an investment of $2.7 million in return for a 54% equity in the venture.
"held discussions with Bhatia, Greg Wilson, the Chief Financial Officer of Primus and Mathew Nichols [sic], Primus' General Counsel about the airship. It was agreed that I should explore and negotiate a deal with CCP as it represented an opportunity to build Primus brand awareness, particularly in the Sydney market. I was aware that Telstra was involved as a sponsor of the Sydney Olympic Games. The airship proposal enabled Primus to potentially negate the dominance of Telstra in marketing and advertising in Sydney during the Sydney Olympic Games."
"· A SPECIAL GRANT OF $3.5 million from the USA - Incremental to our above-the-line advertising budget. NOTE: We cannot fund this from our current budget. ... · A response by Close of business 15.2.00. This will ensure arrival for the Sydney Olympics."
Barbagallo continued to negotiate the airship proposal with Stefanou. He said that he was told that the airship would be sourced from US-LTA in the United States, but that he was not told any information concerning the funding of the airship.
"It looks like we have a deal even though we have not got their signature on the bottom line. They know our price they have accepted our price. They want the airship for the Olympics. We told them the tight timeframe and told them flatly they had a week only. All care only no promises." [Emphasis added]
At first when he was challenged about this letter, Palmer queried whether the date on the photocopy of the document was something later than 1 February. He subsequently agreed that it was the correct date, because the facsimile referred to "their" (Primus') solicitors currently drafting a confidentiality agreement, which was finalised on 2 February and signed by the parties on 4 February 2000. It should also be noted that in this facsimile Palmer asked Olma how much stock he wanted "put aside" from the $6 million float which he and Cahill were discussing.
"USLTA Ray Olma ('Olma') the president of USLTA has stated today it is essential for Primus to decide as soon as possible (days) if they want delivery for the Olympics. The airship livery (painting and colour) is to be completed in the USA. The airship is then to be inflated, tested, deflated, packed, containerised and shipped to Australia, and then reassembled inflated and tested and approved by CASA. Olma states every endeavour will be made to have it here in time for the Olympics but he is hamstrung until a decision is made, every day is critical. SUMMARY Whilst the games are in progress, the Primus Airship will be seen flying all over Sydney by millions and it will be a wonderful vehicle for any Primus product launch. In the coming weeks flight paths and maps will be made available to Primus and they can be altered if required."
Barbagallo said that he regarded the ability to have the airship flying at the Sydney Olympics as "a big marketing opportunity". It made the proposal more attractive.
"We have been and are ready to go hard on getting the airship to you for your objective, the 'Olympic schedule'. But I need not elaborate on the delivery issue as that has been well covered in our past communications and conversations of the last (3) months or so. CCP Australian Airships financial commitment must be in whole or in part done to take it any further than it is. US LTA will not commit to the critical major components until then. We have done a great deal to be able to position the best scheduling possible anticipating this situation. The contract you signed of record will stand with our best efforts put forth to deliver the airship early and in doing so you realise CCP may incur additional costs in the program for airfreight, vendor overtime, US LTA overtime, but in any case I am sure they would be modest against the whole if this is what it takes. The ball is in your court." [Emphasis added].
A copy of this facsimile was sent to Cahill according to the note at its foot.
"Primus got the final draft of their contract tonight. They are going to respond to it in writing by 17 February, 2000 or earlier by agreement. Contract signed 18 February or earlier by agreement. Funds transferred week ending 27 February or earlier by agreement."
"The contract period will commence 1 August 2000 for 12 calendar months ceasing 31 July 2001."
Nicholls wrote on the right hand side the following:
"penalties & credits if airship not ready to commence operation by 1/8/2000."
The price stated in the February draft was $3.72 million for the 12 month period.
"CCP wanted security for Primus' performance of the contract and it also wanted to be protected from the risk that Primus would decide not to proceed with the transaction."
"We regarded this clause as highly important as a security for Primus' performance and commitment to the project. CCP would not agree to enter into any agreement which did not contain this clause. It was non-negotiable. If Primus had sought to exclude this clause from the contract CCP would not have agreed to enter into such an agreement."
Walsh agreed that it was important to CCP that the deposit was non-refundable. However, he went on to say in his witness statement that:
"CCP considered $400,000 would be a large enough deposit to give confidence to CCP, US-LTA and investors that Primus was committed to fulfilling its obligations under the contract. CCP also agreed the non-refundable aspect of the deposit was necessary to protect CCP and its agents in the event that Primus attempted to cancel the contract for any reason after the deposit funds had already been committed."
"it was my understanding that once a deposit was paid, the manufacturer could commence building of the airship."
He did not recall Palmer or Cahill using the words "every endeavour" in respect of the airship being ready for the Olympics. Although Barbagallo said that Cahill and Palmer told the meeting that they had plans to float the company, he denied that he was made aware that CCP was going to become a public company so that funds could be raised for the construction of the airship. He did not know that CCP needed "to get investors on board" in order to be able to fund the construction of the airship. He said that:
"the $400,000 deposit was the trigger for that." [T94]
Barbagallo said that he did not remember any discussions about stockbrokers or investors.
"No, I don't accept that, what was discussed was that the airship would be able to fly in Sydney during the Olympic Games, the CCP representatives said that they'd met with the Olympic authority, they understood what the requirements were, they told us that knew what the weather patterns in Sydney in September were likely to be, they made it very clear that they could and would fly in Sydney during the Olympic Games and that they were making arrangements accordingly."
It was then put to Nicholls that what became clause 3.1 of the Licence Agreement meant that the parties expressly contemplated that the airship might not be ready for the Olympics. He denied this. He said that he believed he had drafted this clause. It was intended to provide some sort of remedy or right to recompense to Primus if the airship was "slightly late by days, perhaps a week or so at the most". He said:
"What was contemplated by clause 3.1 was that with projects like this they may go over schedule by a few days or a week or what have you. It was endeavouring to address such as that. There was no contemplation that the airship wouldn't be able to fly, be ready and able to fly during the Olympics." Nicholls later said: "No, there was never any such discussion about the airship possibly not being, no, that there was a likelihood that it wouldn't be ready by that date. We knew the timeframe was tight, I knew that but no one was under any misconceptions about that but it was always clear in my mind that the airship would be ready to play at the commencement of September 2000, ready for the Olympics, it wasn't a best endeavours type contract, but it was very clear I thought in the contract that that was their common intention."
"Subj to CCP not being in breach of this agreement."
He agreed, in cross-examination, that this proviso was not made part of the final wording of the Agreement. However, he said that he understood this clause to mean:
"It was a deposit so it was part of the consideration of the contract. It was non-refundable so that if we withdrew or attempted to withdraw from the contract, we wouldn't get that money back."
"My understanding of the clause was that if Primus attempted to withdraw from the contract, they wouldn't get the deposit back and if that constitutes a commercial risk then, then so be it. Certainly I wouldn't have accepted the position that if the other side breached or withdrew from the contract, that Primus would forfeit the deposit."
There is no reference in his notes to no guarantee being given about the airship being available for the Olympic Games nor to CCP only agreeing to use its best endeavours to have it available. Nor is there any reference in Nicholls' notes to CCP being permitted to refer to Primus' involvement in CCP's discussions with prospective investors despite the confidentiality provision in the Heads of Agreement.
"We certainly were going to try for a delivery of 1 September but there was no guarantee of it."
"I don't believe best endeavours appear anywhere other than in the letter of the 8/2, and we said we would endeavour ... We certainly said we'd do our best - or words to that effect."
"I don't know if it was ever put in those terms."
"If Primus requires any contract changes Nicholls and Barbagallo will communicate with Cahill or Palmer."
(a) the airship usually required 6 to 7 months to be built; (b) CCP was currently seeking finance for the venture; (c) CCP would use its best endeavours to provide the airship in time for the Olympics; (d) CCP was not able to provide a guaranteed delivery date; (e) at the commencement of the contract operating period or flying time, CCP would "own" the airship as opposed to "leasing" it.
He said that Palmer explained that it was their intention for CCP "to become a Limited company and list on the Stock Exchange for capital raising purposes".
"Best endeavours were words which they were probably used but all the words we used were words to that effect, best endeavours, we said we'll do our best and US-LTA will do their best."
He subsequently went on to say that "best endeavours" was "certainly discussed". He agreed that there was reference to delivery of the airship in the last two weeks of August and that it might be possible to fly the airship over the football Grand Final. But he also said that:
"We definitely did discuss that it mightn't be there for the Olympics but we believed that later in the year around summer or something, that we would be able to start working on something more concrete."
Walsh also said that Barbagallo and Nicholls should have been aware from what the CCP representatives said that "CCP at that stage had no funds". "They knew that their $400,000 was going to be used ... to move the project along" and that the $400,000 was not the full amount of the "sizeable deposit" required. He also said that "the topic of non-refundable deposit was certainly discussed". However, he could not:
"fully recall the details ... the topic of non refundability was brought up, the fact of why it was required but the words that were used - I'm not sure, Your Honour. It was a brief discussion, it was probably only discussed for a minute or so."
"Heads of Agreement - Consent granted by Primus to disclose HOA info for fundraising purposes to pay for construction of Airship. ...
Olympics - Urgency due to extremely tight time frame discussed. Delivery to Australia within 7 months not guaranteed.
... Flying Zones - Briefly discussed, including Olympics and possible use by SOBO."
The notes contain no reference to the other matters Walsh said were discussed. Walsh said that he made his notes "after the - we had a bit of a summary at the end of the meeting". That is, Walsh's notes do not purport to be a record of what was actually being said at the time, but are his notes of a summary of the CCP's representatives' view of what they had said to the Primus representatives at the meeting.
"The directors of CCP informed the Primus representatives that once they obtained an advertising contract they would be able to get funding. However Primus were advised that CCP did not have the available funds to purchase the airship and that CCP needed the deposit to form part of their order to US-LTA. Primus knew that the deposit moneys were to be paid over to US-LTA. ... There was discussion in relation to the airship not being ready for 1 September and that if it wasn't ready in time then time would be added at the end of the contract. No guarantees were given by CCP that the airship would be ready for the Olympics but CCP indicated that they would do everything in their power to see that this occurred. This would even entail Palmer & Co to go the States to ensure that this would occur."
"the idea was to have the airship in the country several weeks beforehand so they could carry out trials and do any adjustment or whatever requirements were."
Stefanou said that the words "best endeavours" were used by Palmer or Cahill. He also said that it was his understanding that "an initial deposit and an unconditional contract would get the ball rolling for finance and the arrangement they had with the manufacturer".
"These terms were discussed in details with their legal people in attendnce [sic] . They indicated that they wanted the airship to go beyond the Olympic games period. They realised that they may not be over the Olympics venues but they would be at the Olympics and be seen.
They would have liked to be in Sydney prior to the commencement and then be around after the games taking in Queensland.
They were acutely aware that CCP and US LTA needed signed contracts and deposits paid before any other construction could be started.
Any delay would effect the delivery date into Australia."
"It is based on the accepted December '99 contract and ammended [sic] to reflect the deletion of the schedule 'F' loan option and in its place a new monthly payment schedule. ... You will notice that the overal [sic] contract price remains at the discounted price of $2,975,000.00 reflecting a discount of $225,000.00 USD. Instead the discount will be covered by CCP by the issuance of stock options, terms and price of which per share shall be the same as those issued to you and other principles [sic] of CCP and the number of those shares will reflect a value of $225,000.00 USD. These shares will be issued to the nominee designated by us for this valuable consideration. Please advise us as to documentation and manner this is covered. We also enclose the wire transfer information in order that you can effect payment to US LTA at the earliest possible date which we understand to be immediate following [sic] the completion of the 'Primus' contract. As discussed with you, we understand the Primus contract will be signed today or latest tomorrow during your meetings with them."
"2.1 Time of Delivery. The Airship will be delivered to Buyer by US-LTA assembled and completed, ready for flight at place of delivery and Buyer will accept delivery of the Airship as early as 7 or as late as 8 months after receipt of initial Advance Payment. US-LTA agrees that it will work with the Buyer to adjust the US-LTA manufacture and delivery schedule as much as is possible without incurring significant additional expense in order to accomplish a schedule that permits delivery, importation and operation of the Airship at the Summer Olympic Games, in Sydney Australia, September 2000. ... 5.1 Advance Payment. Advance payment for the Airship will be made to US-LTA by Buyer by payment of the initial sum of 1,600,000.00 (One Million, Six Hundred Thousand Dollars) towards the Total Purchase Price. US-LTA shall not be required to commence any portion of the Agreement until the Advance Payment is paid into US-LTA's accounts and until such payment is made reserves the right solely to terminate this Agreement and enter into a sale Agreement with a different party for the same Airship."
The Purchase Agreement also provided that US-LTA would not be required to continue any work under the Agreement until each monthly payment had been paid to US-LTA.
"We had a conversation with Primus on the 16th. At that point we weren't aware that we had to pay $1.6 million deposit. After that we were told that $100,000 had to be placed with US-LTA to hold the place in production line and that if paid with further funds [US-LTA] would start manufacture. The start of the manufacture would be an envelope for the airship."
In cross-examination, Palmer said that he forcefully queried the $1.6 million figure in his next conversation with Olma, who was firm that that was the deposit he wanted but that he then said that they would "work something out". However, Palmer agreed that in his account of this conversation in his witness statement, none of this was mentioned. All he said there was that, on receipt of the contract, he rang Olma and asked him about "the allowance of $1.5m previously promised by him." Olma said that he had changed his mind and that although he still wanted a shareholding, he did not want as much as $1.5 million. Palmer said that he realised that the business plan would need to be revised and advised Messenger, Jones and Tauber of this.
Continued Further Negotiations between CCP and Primus
"We have been instructed by Robert Palmer that a ten day cooling off clause has been added to the contract. As previously discussed, the time constraint in relation to this matter to produce the airship in time for Sydney Olympics is extremely tight. Unless the contract is unconditional, and the deposit of $400,000.00 is received at Cahills Trust Account on or before 2.00 p.m. on Friday the 3rd of March, our client will not be able to guarantee the production of the airship for the Sydney Olympics. In the meantime our client company reserves the right to pursue active negotiations with other parties. Should your United States Principals wish to view the project, Robert Palmer will produce the specific details by e-mail later today." [Emphasis added].
"At that date, on the 1st March, we had good expectations based on Olma, that we could get it there for the Olympics, but guarantee, I don't know."
Cahill was then asked why he used the word guarantee in his letter. He said it was done:
"to make sure the thing kept going, the project kept moving forward, because we were going backwards and we were wasting time ..."
"co-ordinating the listing of CCP on the Newcastle Stock Exchange he hopes to have us in a position to list about 23 March 2000. The exchange is due to open on 21 March 2000 ..."
"Thank you for your fax and comments of last evening our time. I received the signed documents this morning and will sign and return them today as agreed. You appreciate that we cannot commit any work until deposit. On the request by Primus to visit our facility in Eugene, at this time we respectfully decline the request. Simply put, although we have plenty to show (airship gondola, parts, and sign demonstrations), until the order is committed, we do not want to be put in the position of potentially misleading Primus about CCP's order placement and delivery presumably based on Primus' understanding that the order is already active. Once committed, of course, we would be happy to host them and anyone else you send our way. Recall that any planned showing related to a prototype of advances in laser day/night sign projection are best delayed for a month or two into the order. I admit I have a concern that Tauber is providing a 'proposal' to you on Friday, which to me means a process that may have to undergo negotiations and is not yet in agreement between you. This may be my misreading of your statements but it raises a caution flag here that although this is moving to a close the process could be delayed further. Finally, I would appreciate your confirmation in regard to the agreed share issuance of CCP stock in an amount equivalent to $225,000 USD issued per the terms provided you and your partners. Of course I do not expect this issuance to occur until the US LTA order and whatever remaining issues CCP has with respect to the share offering are in place." [Emphasis added].
"The following is an extract from a fax that Ray Olma sent me dated 1 March 2000. I have sent the original fax by mail with the personal details deleted. Quote: We would be happy to host them and anyone else you send our way. Recall that any planned showing related to a prototype of advances in laser day/night sign projection are best delayed for a month or two in [sic] the order."
Palmer denied in cross-examination that this was a deliberate attempt to mislead Barbagallo. He said that "we couldn't see any problem with Primus visiting the factory". However, Palmer had no credible explanation for what I find was a quite misleading quotation from Olma's facsimile. He could not recall sending to Barbagallo "the original fax by mail with the personal details deleted" nor could he identify "the personal details" in Olma's facsimile to which he was referring. No such document from Palmer was discovered by Primus. By not sending the original facsimile, Palmer was able to avoid revealing to Primus that Olma would not commit to CCP's order until the deposit was received and that Olma was concerned about CCP's ability to fund the balance of the purchase price. If Primus had known this, I consider that it would not have paid the $400,000 deposit.
"There was no need to. Because they knew that the funds that we were receiving from them were going to Olma. And I had the assurance from Olma that he was going to start work on the contract by making the envelope."
This was a reference to Palmer's evidence that in a telephone conversation after he received the contract from US-LTA, Olma agreed that if he received US$100,000 he would keep CCP "in the production line" and that he would order the manufacture of the airship's envelope to be started, which was the first step in construction. However, Palmer agreed that after this alleged conversation, he signed the Purchase Agreement with US-LTA which required payment of a US$1.6 million deposit before work would commence. Palmer said that he understood the reference to "deposit" in Olma's facsimile of 1 March 2000 to be to payment of US$100,000, not the US$1.6 million.
"As soon as the Primus cheque is cleared we will forward a holding deposit of US$100,000.00 the balance will be forwarded to you shortly after. In relation to your stock options we will hold US$225,000.00 for your designated company/person."
"We understand the further phone conference has been arranged for 10.00 on Monday the 6th of March. We are instructed that all matters must be finalised at that conference, and that an unconditional contract be signed at 4.00 p.m. on Monday the 6th of March, and further, the sum of $400,000.00 to be paid into Cahill's Trust Account. This can be done by way of bank cheque or telegraphic transfer to the Trust Account at Bendigo Bank, Fountain Court Branch No 633000 Account No 105322903. Our client company is adamant that there be no further extensions in relation to the signing of the Contract and the payment of the deposit."
Further negotiations followed resulting in yet further amendments to the proposed contract, but agreement on the final form of the contract was eventually reached.
"1.0 CCP grants the advertiser an exclusive licence within Australia to use the Airship for advertising and promotional purposes for the duration of, and on the terms of, this agreement. 1.1 The parties agree that upon the execution of this agreement, the agreement executed by the parties on or around 25 February 2000 shall be immediately terminated. ... 3.0 This agreement commences on the date when it is executed. The licence granted under this agreement shall commence on 1 September 2000 and subject to this agreement shall continue for 12 calendar months. In addition the Advertiser shall be entitled to a two week test period prior to commencement of the licence in which to rest all functions and operations of the Airship. 3.1 Without limiting clause 7, if for any reason the Airship does not commence operation by 1 September 2000 CCP shall credit the Advertiser the amount of the licence fees due for the period during which the Airship is not in operation (the 'Delay Period') and extend the licence period by a period being the Delay Period. 3.2 That CCP during the months of August, September and October 2000 proposes to fly a minimum of 160 hours per calendar month, being a total of 66 hours in addition to the standard 138 hours per month. These additional hours flown during August, September and October 2000 will be at no charge to the advertiser. 3.3 During the months September and October 2000 prior to and after the Olympic and Para Olympic games it is proposed to fly in Sydney. 3.4 CCP represents that: (a) it owns the Airship and has the unfettered right to grant a licence to use the Airship on the terms of this agreement. ... 4.0 CCP will supply the Airship for a period of twelve months which includes flying time of 1656 hours for the sum of $3,250,008.00. 4.1 A non-refundable deposit of $400,000.00 shall be paid upon signing of this agreement. These monies ('deposit') shall be offset against the monthly payments during the months of May, June, July and August 2001. 4.2 The monthly payment of $270,834.00 shall be payable 14 days in advance. The final four months (May, June, July, August 2001) shall be $170,834.00 per month. ... 7.0 If the Airship does not fly in accordance with the Flight Schedule for a period exceeding 4 weeks in aggregate the Advertiser may terminate this agreement by notice to CCP without prejudice to its other rights, except where clause 7.1 applies. 7.1 CCP will not be liable or be deemed in default under this contract on account arising out of any causes such as: directives from CASA, war, armed hostilities, riots, fires, floods, unsuitable weather, earthquakes or governmental acts. ... 8.3 During the Sydney 2000 Olympic games, CCP may, outside the hours specified in the Flight Schedule, carry SOCOG security staff for the purpose specified by that staff."
"Palmer told me that there was some urgency about getting the deposit because the airship manufacturer, US-LTA, had to be paid before construction could begin. Palmer told me that the manufacturing had to commence immediately in order to have the airship ready for the Sydney Olympic Games. I spoke to someone in the Primus Finance Department in relation to making an immediate payment of the deposit of $400,000. The payment was transferred to an account nominated by CCP. Although it was not discussed during this conversation, it is fair to say that I would not have arranged for the immediate payment of the deposit if Palmer told me the airship would not be ready for the Sydney Olympic Games. I regarded this as an essential part of the negotiated deal."
"We will be sitting down with Tauber to arrange the balance of funding on Thursday." Olma replied: "Since you now have the Primus deposit why do you not surprise me and send more than the 100K USD."
Olma said in cross-examination that he expected to be paid the full US$1.6 million deposit once Primus paid the $400,000.
"It was a combination of equities of some if I recall $500,000 from Mr Cahill and a couple of hundred thousand dollars from Mr Palmer, together with other financings that they had arranged ...".
Instead, Olma said in his witness statement that he was asked several times by Palmer and once by Walsh to commence construction on the basis of a reduced deposit and that on each occasion he refused.
"I received your fax. On the balance of the deposit it appears to me that it is still some time off as the position with the investors remains uncommitted. As you know the $100K wire received is well appreciated but a small (non-refundable) fraction of the balance required to proceed. Although CCP has far more funds in hand available to commit it will still take the balance of the deposit to make up lost time nevertheless if you can only send part of the remaining balance that would at least influence matters in a significant way. I will not finance the project beyond the substantial commitment we have in time and resources thus far and we will gradually grind to halt as it simply requires several major expenditures to efficiently proceed to the tune of $650K immediate. Our and your best efforts are being jeopardized by the present uncertainty. If you cannot foresee this more concretely you should probably advise Primus that you could have a delivery problem.
Rob, I know well that you are working hard on this as best you can, but our feeling is that your contacts are the problem and this is the time to tell them to have the courtesy to step up to the plate as they told you they would or to move over so you can serve your client."
"Now that Primus had finally executed the advertising contract I had every confidence that CCP would now be able to obtain the funding necessary to the project. From our discussions with Jones and Messenger, and my discussions with Tauber, CCP believed that it would be able to quickly raise the necessary funding for the project."
"I am surprised and dissapointed [sic], but it is apparent to me that you need to put in place your listing on the exchange to get this done. I did not know that! I had been told that it would take two or three days (ongoing) for the balance of the deposit to be sent, obviously your investor's (Pratt & Tauber primarily) did not come through with their investment in CCP. I have suspended all progress, and programmed activity on this contract until I know definitely were [sic] thing's are at. If I am wrong in respect of my understanding I am sure you will let me know."
" 'Everybody' is acutely aware of the extreme need to get the deposit to you, and all stops are out."
"Harmon and Partners had to wait five weeks for that contract. That put us back five weeks before we could come out with some audited accounts."
However, Palmer also said in a facsimile sent to Olma on 29 April 2002 that:
"The audit was satisfactory but the auditors projections were stuffed it up [sic]. We had to have it done again and got our accountants to do it."
Thus, it appears that there was more than one cause of any delay and in any event Easter fell within this three week period, so the delay was not long. In my opinion, the suggestion that the audit was held up for "five weeks" because of the delay in providing the contract is ludicrous.
"I will confirm to you receipt of the further 50K being part of the deposit due when our bank confirm's it. I believe it is in. I am going to begin to set up the hull order process based on your assurance to me that the balance of the deposit will be here in the next day or two and that there is no doubt as you now have signed commitment's. Because I must be here now because of the delay's to deal with supply contracts and scheduling, I have decided to wait until this is all in hand before I come over, now probably next week (week of the 24th). I have related your assurances to Joe and Martin because as you know they are under scheduling pressure because of the uncertainty over the past weeks. We all have headaches over this. Rob, it is almost two months since you got the Primus contract. I am, not to again be repetative, [sic] concerned for you over your commitment's to them. This has to be right this time as you well know." [Underlining in original]
"months earlier that he'd place the hull on order and it was quite a shock to find out that he hadn't put it on order at this point of time."
Palmer agreed that he had told Olma that the balance of the deposit would soon be available and that CCP had signed commitments. Palmer said that the signed commitment he was referring to was one from a Mr Koadlow that "he would go out and raise" $7 million. This was hardly the commitment that Olma was expecting and was further evidence of Palmer's misleading conduct.
"We very much appreciate the monies thus far on the contract and Joe advises that the shop is fully ready to move forward, having prepared jigs and molds and personnel as much as possible to prepare to begin the major work. The next step is as we say 'cut metal', make financial commitments to vendors and sub-contractors and move all of which I cannot do of course until the full deposit is paid. In the interim, we went and remain on 'stand-by'. This puts US LTA in a difficult position as we cannot remain on 'stand-by' for weeks and pass on other possible work that might interfere with commencing your order. Therefor we are advising that we will begin to go in the other direction very soon toward undoing the set up taken thus far so that we can process other work in order to secure our revenues. This is called a 'stop work' order. If such order is given and we undo the set up, the earnest monies paid will become earned and not credited towards an order. Joe advises that we should not go much beyond May 1 as it will take a couple of weeks to undo the set-up. Again Rob this is a difficult position for us too, but I need to advise you now as time is wasting. It will be a step backwards. We will do all we can to delay such stoppage but at some point it will create losses on our end. I believe and hope this process will be concluded imminently as you say and that such steps will not be necessary. Based on conversations I have had with you and gather this 'money issue' is simply a negotiation over equity and related percentage positions and although I cannot fault trying to garner best value for yourselves, the process is losing sight about Primus, US-LTA's financial and schedule requirement, and the upcoming Olympics target to which we have now lost 2 additional months since the Primus signing that cannot be made up. The exclusivity agreement is forthcoming."
"To confirm the current status of the airship thus far, as of Friday May 12, 2000. If CCP cannot forward the full or a substantial amount of the deposit into US-LTA's account we will re-schedule the subject airship delivery into at least November, 2000. Over the past number of weeks as you are aware, we have repeatedly stated since before the signing of your Primus contract and henceforth thereafter that the ongoing order commitment delays would prevent a delivery based on best efforts for the Olympic Games and at this point we regretfully must state it is virtually impossible given a (4) month schedule for fabrication lead times, shipment and on site preparation and certification. The payment made of $150K sent us as non-refundable payment against the deposit amount of $1.6M required will be re-considered on a revised delivery schedule. Please confirm CCP's receipt of this notice by return fax. On a shareholder issue, could you please advise who the shareholders will be and their percentages. If you are open to advice, I have some comments on how you can structure your positions that may aid in speeding things along."
"We were very optimistic of getting the funds. Always optimistic. We never had a negative vibe from the brokers."
"REGARDING PRIMUS - CCP AUSTRALIAN AIRSHIPS LTD CONTRACT (CCP) Dear Ravi, Further to our meeting yesterday with Mathew Barbagallo, Brent Retallick, David Cunningham (CCP accountant) and myself, I wish to confirm the following: CCP have had difficulty in obtaining finance to fund this project. We had assurances from two share broking firms in Melbourne that they would acquire the seed capital/investment funds required within the timeframe set out by CCP prior to listing. Our deadline was $2.5m by this weekend. As you are aware we engaged Harmon Partners on 20th March 2000 to conduct an audit of our books and records. They completed this unqualified audit on May 4th 2000. Our meeting yesterday was to advise Primus of our difficulties to date and alert you to the fact we might not be able to meet the Olympic deadline. Since our meeting yesterday I now believe we will obtain the necessary funds in time to meet our contractual commitments to Primus. Yesterday when we met, we were going to explore the option of Primus being financially involved with CCP. I have spoken with Ray Olma, President of USLTA this morning and he is prepared to catch the next available plane to Australia and meet with you if you believe that would be of any advantage." [Emphasis added].
"In the meeting Palmer advised in effect that the delivery date of the airship (as provided in the Primus contract) may be difficult to meet as funding was proving difficult to secure. Primus expressed concerns about delivery dates and whether the airship would be available for the Olympics."
"Please note there is an element of urgency in this matter, as we must pay USLTA the balance of their deposit of US$1.5m on the airship ASAP."
Palmer said that he believed his statement in that document was correct, thereby admitting that the substantial deposit was always required by US-LTA.
"The Directors of CCP have agreed on a proposed funding strategy which effectively doubles the income of USLTA on this deal and will enable rapid funding to achieve delivery for the Olympics." [Emphasis added].
Palmer agreed that by the time of this proposal, "we certainly were struggling" to raise the necessary funds. Palmer also agreed that the reference in his facsimile to Olma to CCP listing on the Australian Stock Exchange "within 12 months" was incorrect. It was not "an option" at that time because "you have to trade for a number of years before you can be listed on the Australian Stock Exchange". Olma later indicated that he was not interested in underwriting the project.
"Ray Olma stated that unless he received the balance or a substantial part of the balance of the deposit US$800,000 deposit [sic] he would not guarantee the delivery of the airship for the Olympic Games. He would only guarantee its delivery on condition that he could get the envelope manufactured in 2 months. I asked him if he had made any enquires about the envelope and he said yes he believed he could get it done and all stops would be out on his part. He said it was possible. I asked him to order it now and he was not prepared to do it unless he received the deposit."
Olma denied that he told Palmer around this date that delivery might be arranged for the Sydney Olympics.
"We hope we are within days of gaining the finance required for the Primus airship. I have been speaking to Ray over the past few days and he seems to think the Olympics are still an outside chance."
"No work has been done except planning etc. No metal as been cut. Joe told us it will take 6-8 months, at least, from the time they get the 'go' (after financing is complete) to delivery in Australia. Our Airships expert, Giovanni Abrate, who was with us agreed, there is no way that ship will be ready for Olympics. Nothing as started yet. Re the signs, I am not sure, we did see some examples of signs and the equipment in in operation (very impressive) but I don't know whether any of the signs or images were yours. I had the impression not so, they said they weren't doing any work until they get paid (mostly referring to cutting metal etc."
"It looks as though the Olympics are out. I don't believe we have a chance of attending them in the airship. I spoke to Ray this morning prior to receiving this Email. He claims if he can get the envelope manufactured in two months (subcontracted) we still can have delivery for the games. Realistically I do not believe we will get it in time." [Emphasis added].
"Further to your conversation with Rob Palmer, at this stage, we are behind in the airship program but we are negotiating with the builder and our financiers in the hope to resolve our program."
"Indicative letter of offer from ABN Anbro to inject $1.5 million - needed to complete construction of airship. Problem has been form of contract between CCP and Primus too vague, too short a term to convince financier. No secondary market for the airship. Need to put forward three year revenue flow. Contract needs work from point of view of both parties. Construction company said airship could be finished by November if finance arranged. Rob got strung along by brokers. O.T. [Quinert] said brokers sat on their hands for a fair period of time. Need to have 36 month term will not have start date prior to November. Want financier to be involved in contract (in nature of hire purchase contract). Olympics have been missed. Financier will want to see far more 'belts and braces agreement' ('triple net security'). Airship is under construction in U.S.A. - $250,000 has been paid to USA (from our money). Company bound by contract in USA to acquire airship. Construction has been delayed because funding not in place. ... He said at this stage. Without prejudice from now on. We have not met our obligations. I said we would be very happy to negotiate the contract but need to have $400,000 refunded. Brent and I left them to discuss this. Michael [Quinert] said that ability to repay deposit depends on the matter proceeding. I said that we want to know what the company and the directors have to say about raising $400,000 to repay us. I said that I thought they should tell us the financial position of the company and the directors and should come back within 24 hours with definite proposal for repaying or securing the $400,000. Rob Palmer says deposit held by USA. After a break: Ability to repay deposit depends on the matter proceeding. Directors always in good faith - did not spend money for any other purpose. Doubtful that can recover money from the manufacturer. Could re-negotiate with another client (but is a long time away)."
"We were seeking to see whether they would accommodate a request to renegotiate the existing contract ... because the existing indicative offer from ABN-AMRO was quite clear that it needed a longer term."
There were no other possibilities of finance in the wind at that time as far as he was aware.
"I refer to our meeting today. I note your advice at the meeting that your client CCP Australia Airships Pty Ltd (CCP) is not able to fulfill its obligations under the agreement. In my view this constitutes a repudiation of the contract by CCP. Primus reserved its rights to accept the repudiation and to rescind the agreement and take action to recover its losses. Obviously, the directors will be made parties to this action, which will include claims based on deceptive and misleading conduct. Primus is prepared to enter into negotiations to vary the agreement, but only if the deposit of $400,000.00 paid by it is first repaid or secured to its satisfaction. Primus requires CCP and its directors to put to it within 24 hours (by say 3.00 p.m. on Thursday) a firm proposal in this regard, supported by frank disclosure of their respective financial positions. If this is not done, Primus will take vigorous action to protect its rights."
"We acknowledge receipt of your facsimile of 19 July 2000. Contrary to your assertion, the writer did not advise your company that CCP would be unable to fulfil its obligations under the agreement. Rather, a proposal was put forward regarding an amendment to the current agreement so as to enhance our client's position with respect to finalisation of its funding arrangements. In addition, we suggested that various amendments to the agreement may be appropriate so as to enhance and clarify the position of Primus with respect to the transaction. We note that you have now formally made allegations of deceptive and misleading conduct with respect to the directors of CCP. We consider those allegations to be baseless and mischievous in nature. However, in the event that you care to properly particularise such allegations, we would be happy to seek instructions with regard to a formal response on behalf of the parties concerned. As advised at the meeting on 19 July 2000, the non-refundable deposit paid in accordance with the current agreement has been utilised in the manner as contemplated by the parties and as reflected by the terms of the current document. As far as our client is concerned, the terms of the existing agreement make no provision for the repayment of the deposit as suggested in your facsimile. We note that on several occasions at the meeting on 19 July 2000 you suggested that Primus wishes to take a constructive and commercial approach to this matter. Frankly, we find your conduct in issuing your facsimile of 19 July 2000 difficult to reconcile with the approach you purportedly wish to take."
"Thank you for your report of this morning. It appears for several reasons that CCP will be unable to make any sort of further financial commitment to US LTA at this time or in the next weeks and therefor we will proceed with our other business at hand. We are understatedly disappointed with your results with Primus but they are as we expected and forewarned you against. Although it was good news to see the AMRO commitment, it becomes mute [sic] as CCP is now in no position to take advantage of the loan offer with the loss of the sponsor commitment. From our perspective and experience in these matters it will be much harder to close a new sponsor commitment in a short period, not to mention investors without Primus' contract. I appreciate your efforts and commitment but realistically CCP is not able to commit to fund even the reduced deposit requirement at this stage and therefor we have go [sic] about our business and put what was an excellent opportunity to proceed on the back burner. If you can salvage Primus is your backing committed to put up the cash and revenue underwriting required forthwith to close AMRO?? If so, I would suggest you demonstrate assuredly to Primus that the financial deal will close at Primus' agreement and the order will be cut quickly. You can bet this will be an important point with them as up till now they have been used as a promotional tool rather than treated as a customer. Showing that the order is cut demonstrates your commitment to them as customer ... (and makes us happier too)."
"We refer to the Agreement between CCP Australian Airships Limited ('CCP') and Primus Telecommunications Pty Ltd ('Primus') dated 25 February 2000 ('the Agreement') and confirm that CCP has failed to procure the flight of an airship bearing advertising for Primus by 1 September 2000 or at any other time in accordance with the terms of the Agreement. Moreover, it is clear that CCP will be unable to procure the airship during 2000. In these circumstances, Primus considers that this constitutes a repudiation of the Agreement by CCP, which repudiation is accepted by Primus as a rescission of the contract. Primus now seeks damages including repayment of the sum of $400,000 paid to CCP earlier this year. Primus also reserves its right to recover further damages by reason both of the breach of the Agreement by CCP and by reason of misleading deceptive conduct on the part of CCP and its directors. In the event that CCP fails to pay the sum of $400,000 or secure that sum to the satisfaction of Primus, within 21 days from the date of this letter, legal proceedings will be commenced without further notice."
Miller said that at the time he sent that letter he believed that the airship had not been constructed, that finance for the airship had not been obtained by CCP, that no delivery date had been identified for the airship and that there was no prospect of the airship being delivered or construction commencing within the immediate future.
"We are instructed that your summation of events as outlined in your letter dated 30 January last appears to take no account of several important backgrounds [sic] facts. These are as follows: 1. When the original negotiations were held, it was understood and agreed by the persons then representing Primus that CCP at that time did not have sufficient capital to construct the airship but would use its best endeavours to seek the necessary funding from third party investors. 2. Primus executed the Licence Agreement so as to assist CCP in demonstrating to would be investors that a customer, and therefore revenue base, existed for the project. 3. The deposit was paid on a non-refundable basis with Primus's knowledge and consent that those funds would be used to assist CCP's objectives of procuring the necessary equity investment to build the airship. By making the deposit non-fundable, Primus was fully aware that the funds provided were therefor, effectively, risk capital in the venture. As previously advised, our client and its directors have made all reasonable efforts (and are continuing to do so) towards raising the necessary equity capital to construct and put into service the airship. It became apparent to our client during the course of those efforts that alterations to the licensing arrangement, such as an extension to the term, would be necessary to attract the required funding. You will recall that our client's approaches to you last year in relation to those matters were rejected out of hand, and since that time our client has been seeking alternative licence arrangements. Having regard to the foregoing, our client and its directors have acted appropriately at all times in relation to this matter and deny any wrongdoing or liability such as that you have alleged. Any proceedings that you issue will be strenuously denied. We respectfully suggest that the best way forward in this matter is for the parties to work cooperatively towards a commercial solution for all concerned."
"CCP represented to you that CCP had a contract with an entity called Primus to provide the airship for advertising over the Olympic Games, Sydney September 2000, and that if the airship could not be available for the Olympic Games, CCP would be in default on its contract with Primus." [Emphasis added].
Cahill said that he had no idea who told Clarke about this representation. He said that "he probably made it upon the information which had been forwarded to him" by CCP. However, despite a call for production, CCP never produced "the information" which had been forwarded to Clarke. Palmer made the unlikely suggestion that the instructions were oral. When asked further questions about this letter, Cahill said that Palmer provided Clarke with the details of the proposed claim. Palmer said that both he and Cahill had instructed Clarke. "We gave him a rough brief on what to say to Mr Olma". Although, both Palmer and Cahill said that the above quotation from Clarke's letter was factually incorrect, neither was able to provide a credible explanation of how Clarke supposedly got it so critically wrong.
Legal Issues - The Contractual Claim against CCP
"In a commercial contract it is certainly right that the court should know the commercial purpose of the contract and this in turn presupposes knowledge of the genesis of the transaction, the background, the context, the market in which the parties are operating."[3]
"During the months September and October 2000 prior to and after the Olympic and Para Olympic games it is proposed to fly in Sydney."
This partly explains why clause 3.2 of the Licence Agreement contemplated greater flying time in the months of August, September and October 2000. See also the reference in clause 8.3 to the possibility of carrying SOCOG security staff "during the Sydney 2000 Olympic games".
"our client will not be able to guarantee the production of the airship for the Sydney Olympics." [Emphasis added]
"a deposit wears two aspects: if the purchase is carried out, it goes against the purchase money, but its primary purpose is that it is a guarantee that the purchaser means business ..."[5]
"if CCP hadn't as it represented to Primus done it's best endeavours and done everything it possibly could to try to get the airship here, then I believe Primus would be entitled to a full refund of any deposit."
"Upon rescission of the contract, the consideration for which the purchasers had paid the deposit failed totally. The purchasers became entitled to recover the deposit not as damages but in quasi-contract as money paid for consideration that had totally failed ..."[13]
"Upon rescission, the purchasers were entitled to obtain restitution of the deposit which they had paid. Their claim for the return of the deposit was not founded on the rescinded contract. Nor did it represent a claim for damages for the vendors' breach of its terms. It was a claim founded in the equitable notions of fair dealing and good conscience which require restitution of a benefit received as, or as part of , the quid pro quo for a consideration which has failed ..."[14]
"But the purchasers seek only to recover the deposit paid by them. That is not a claim for damages ... It is a claim for money had and received and is based upon an imputed promise to repay, the money having been paid for a consideration that has wholly failed ..."[15]
(Reference to authorities omitted)
"Prepayments can, in general, be recovered, but the position of deposits or earnests is not entirely clear, the better view being that they are not recoverable if paid to provide a sanction against withdrawal."[18]
(a) that whilst the Olympic Games were in progress the airship would be seen flying all over Sydney by millions;
(b) that the only areas in which the airship could not fly were designated "no fly" zones;
(c) that the airship would be available to be used by Primus for promotional purposes during the last two weeks of August 2000 and during the Sydney Olympics;
(d) that if Primus paid a deposit of $400,000 by 8 March 2000 CCP was able to guarantee the delivery of the airship for the Sydney Olympics; and
(e) that CCP owned the airship.
The conduct alleged against CCP was that it refrained from telling Primus that CCP did not have available funds to pay the deposit for, or otherwise to pay for the purchase price of, the airship, and that CCP had no commitments in place or resources for any such funding.
"my experience and track record in preparing large budgets for major items of capital equipment in the Army and General Motors, plus my experience in successfully operating small businesses."
I therefore regard Walsh's evidence with some scepticism.
"It is the objective nature of the alleged contravenor's conduct that is ultimately determinative of liability and not his or her state of mind ..."[23]
"As soon as the Primus cheque is cleared we will forward a holding deposit of US$100,000 the balance will be forwarded to you shortly after." [Emphasis added].
The US$100,000 was only holding CCP's place in the production line and Palmer acknowledged that the balance was required. I see no reason not to conclude, as Olma said he expected, that the balance referred to the remaining US$1.5 million of the US$1.6 million deposit.
"because section 4(2) requires A to prove firstly that R knew of these financial difficulties, there would appear to be little room for the operation of section 51A in the context of future representations by silence."
Section 4(2) of the TPA which elucidates the meaning of "conduct" does say in sub-section (c) that:
"a reference to refusing to do an act includes a reference to: (i) refraining (otherwise than inadvertently) from doing that act ..."
But even if s 51A has no role to play in this particular part of the case, this does not mean, in my opinion, that CCP's silence about the unlikelihood of the airship being available for the Olympics because of CCP's inability to raise the necessary funds in time cannot amount to misleading or deceptive conduct. In Demagogue Pty Ltd v Ramensky, Black CJ said:
"Silence is to be assessed as a circumstance like any other. To say this is certainly not to impose any general duty of disclosure; the question is simply whether, having regard to all the relevant circumstances, there has been conduct that is misleading or deceptive or that is likely to mislead or deceive. To speak of `mere silence' or of a duty of disclosure can divert attention from that primary question. Although `mere silence' is a convenient way of describing some fact situations, there is in truth no such thing as `mere silence' because the significance of silence always falls to be considered in the context in which it occurs. That context may or may not include facts giving rise to a reasonable expectation, in the circumstances of the case, that if particular matters exist they will be disclosed."[25]
A similar view was expressed by Hill J in Winterton Constructions Pty Ltd v Hambros Australia Ltd:
"Obviously, it is difficult to see how a mere silence could, of itself, constitute conduct which is misleading or deceptive or likely to mislead or deceive. However, if the circumstances are such that a person is entitled to believe that a relevant matter affecting him or her adversely would, if it existed, be communicated, then the failure to so communicate it may constitute conduct which is misleading or deceptive because the person who ultimately may act to his or her detriment is entitled to infer from the silence that no danger of detriment existed. Thus, where a duty to speak is imposed, silence may constitute misleading and deceptive conduct."[26]
"Nothing in the common law, in s 52 or s 82 or in the policy of the Act supports the conclusion that a claimant's damages under s 82 should be reduced because the loss or damage could have been avoided by the exercise of reasonable care on the claimant's part. There is no ground for reading into s 82 doctrines of contributory negligence and apportionment of damages. No doubt, if part of the loss or damage would not have occurred but for the unreasonable conduct of the claimant, it will be appropriate in assessing damages under s 82 to apply notions of reasonableness in assessing how much of the loss was caused by the contravention of the Act."[31]
The Claim under s 58 of the TPA
"A corporation shall not, in trade or commerce, accept payment or other consideration for goods or services where, at the time of the acceptance: (a) ... (b) there are reasonable grounds, of which the corporation is aware or ought reasonably to be aware, for believing that the corporation will not be able to supply the goods or services within the period specified by the corporation or, if no period is specified, within a reasonable time."
[1] [1982] HCA 24; (1982) 149 CLR 337 at 350
[3] [1976] 1 WLR 989 at 995-6
[5] [1981] VicRp 13; [1981] VR 120 at 123
[7] [1966] HCA 63; (1966) 120 CLR 583 at 589
[11] (1884) 27 Ch D 89 at 97.
[13] [1989] HCA 51; (1989) 168 CLR 385 at 432
[14] [1989] HCA 51; (1989) 168 CLR 385 at 438
[15] [1989] HCA 51; (1989) 168 CLR 385 at 455
[17] [1993] HCA 4; (1993) 176 CLR 344 at 376-7 per Deane and Dawson JJ
[18] [1993] HCA 4; (1993) 176 CLR 344 at 356.
[19] Re Ku-ring-gai Co-operative Building Society (No 12) Ltd [1978] FCA 50; (1978) 36 FLR 134 at 167 per Deane J.
[20] James v ANZ Banking Group Ltd [1986] FCA 41; (1986) 64 ALR 347
[21] Global Sportsman Pty Ltd v Mirror Newspapers Ltd [1984] FCA 180; (1984) 2 FCR 82
[22] Wheeler Grace and Pierucci Pty Ltd v Wright [1989] FCA 127; [1989] ATPR 40-940 at 50,251 per Lee J, which was cited with approval by Heerey J in Bowler v Hilda Pty Ltd (1998) 80 FCR 191 at 205-6.
[23] (1998) 80 FCR 191 at 206.
[24] [1992] ATPR (Digest) 46-096 at 53, 376.
[25] [1992] FCA 557; (1992) 39 FCR 31 at 32.
[26] [1992] FCA 582; (1992) 39 FCR 97 at 114.
[27] Henville v Walker [2001] HCA 52; (2001) 206 CLR 459 at [14] per Gleeson CJ.
[28] Henville v Walker [2001] HCA 52; (2001) 206 CLR 459 at [160] and [163] per Hayne J.
[37] [1985] HCA 65; (1985) 158 CLR 661 at 667 and 669 per Mason ACJ and Wilson, Deane and Dawson JJ.
[38] [1985] HCA 65; (1985) 158 CLR 661 at 670 per Mason ACJ and Wilson, Deane and Dawson JJ.
Primus Telecommunications Pty Ltd
CCP Australian Airships Limited [2003] VSC 120
(1982) 149 CLR 337
(1966) 120 CLR 583
(1989) 168 CLR 385
(1993) 176 CLR 344
(1978) 36 FLR 134
(1986) 64 ALR 347
(1984) 2 FCR 82
(1998) 80 FCR 191
(1992) 39 FCR 31
(1992) 39 FCR 97
(2001) 206 CLR 459
(1985) 158 CLR 661