[2017] VCAT 1689
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2017-10-27
Original judgment source is linked above.
WHAT ARE THE PRINCIPAL PRELIMINARY ISSUES TO BE DECIDED?
Is the Stage 1B proposal 'generally in accordance with' the objectives, design principles and plans of the Preston Market Incorporated Plan 2007 and therefore unable to be contested by third parties?
Since the Council Officer formed the view that the Stage 1B application was generally in accordance with the Incorporated Plan, that application was generally exempt from the notice requirements and review rights of the PE Act.
(a) on land identified for multi-level mixed use development;
(b) on land identified as being suitable for retail and commercial uses;
(c) on land identified as being suitable for a preferred building height of up to 10 storeys;
(d) on land that ensures that the substantial fresh fruit market component of the Preston Market is retained; and
(e) on land that is not identified as being used for primary or secondary pedestrian connections or an internal market plaza.
Do the respondent objectors have any 'standing' to make submissions in relation to flooding/drainage issues?
The Tribunal must make its decision based on the whole of the applicable planning framework
To implement the State Planning Policy Framework and the Local Planning Policy Framework, including the Municipal Strategic Statement and local planning policies.
To recognise or provide for the use and development of land for projects and areas of regional or State significance.
To provide for a range of uses and the development of land in accordance with a plan incorporated into this scheme.
To facilitate high density residential development, including affordable housing opportunities, above ground level.
To encourage the development of the Preston Market site as a multi-level mixed-use area.
Impacts and interrelationship with the existing Preston Market
Does the concept of providing an integrated mixed use development achieve the outcomes sought by the Incorporated Plan and relevant State and local policies?
Layout and built form (tower/podium, setbacks, architectural appearance)
The locational advantages of the site for future residents
[62] We have already referred to what can only be described as the massive increase in Melbourne's population projected through until 2050. Our roads are already congested and will be unimaginably so if a 'business-as-usual' approach is accepted through until 2050. The stark reality is that the way people move around Melbourne will have to radically change, particularly in suburbs so well served by different modes of public transport and where cycling and walking are practical alternatives to car based travel.
[65] State and Local planning policies are already acknowledging the change that is required with Plan Melbourne 2017-2050 and State policies referring to 20-minute neighbourhoods. At the municipal level, Moreland has long been recognised as being at the forefront of encouraging less reliance on car based transport. For example, the Moreland Integrated Transport Strategy 2010 includes a key principle that walking and cycling are the preferred modes of transport.
[70] Although Ms Dunstan undertook a car parking demand assessment, as called for by Clause 52.06-6 when there is an intention to provide less car parking than that required by Clause 52.06-5, we found the whole discussion around car parking of marginal value given the strong policy imperatives about relying less on motor vehicles and more on public transport, walking and cycling. Census data from 2011 or 2016 is simply a snapshot in time, a base point, but we are not persuaded that such data should be given much weight in determining what number of car spaces should be provided in future, for dwellings with different bedroom numbers. Policy tells us the future must be different. We consider that oversupplying parking, whether or not to comply with Clause 52.06, has the real potential to undermine the encouragement being given to reduce car based travel in favour of public transport, walking and cycling.
The absence of any master plan for the whole site
...endeavour to integrate the range of policies relevant to the issues to be determined and balance conflicting objectives in favour of net community benefit and sustainable development for the benefit of present and future generations.
Preston Market, Cramer & Mary Street PRESTON VIC 3072
Development of two (2) ten-storey buildings comprising 128 dwellings, the re-location of the existing Aldi supermarket, offices, retail tenancies, a food and drink premises, a reduction to the car parking requirements and alterations to the existing vehicle access to Murray Road in accordance with the endorsed plans.
When approved, the plans will be endorsed and form part of this Permit.
The Landscape Plan must be prepared by a suitably qualified person and generally in accordance with the Landscape Plan prepared by Aspect Studios (dated 7 April 2016 and labelled 'Preston Market Stage 1B Landscape Works') but modified to reflect the amended development referred to in Condition 1 of this Permit and to address the recommendations contained in the John Patrick statement of evidence (dated July 2017) as follows:
(a) Details of the soil depth and volumes of each of the planter box types incorporating rates of 0.6 cubic metres of irrigated soil per 1 sq. metre of tree canopy (planter soil depth no greater than 1.0m); and 1.0 cubic metre of irrigated soil per 10. sq. metres of climbing plants (planter soil depth no greater than 800mm); and any consequential change in planter sizes;
(b) Planter design for trees to address root anchor stability and resistance to wind throw;
(c) Location of the communal food garden so that access to light is maximised for effective plant growth;
(d) Location of trees to assist in the management of wind impacts identified in the wind management plan required by condition 31
(e) Commentary on the general water needs of the landscaping sufficient to show that the irrigation system is satisfactory.
The Landscape Plan is to be accompanied by a report prepared by a suitably qualified person that explains how the Landscape Plan has adequately addressed the above requirements to the satisfaction of the Responsible Authority.
When the Landscape Plan is approved, it will be endorsed and will then form part of this Permit.
In the event that a statement is issued in accordance with Part IXD of the Environment Protection Act 1970, before the development is occupied all conditions of the Statement of Environmental Audit must be complied with.
Written confirmation of compliance with the conditions of the Statement of Environmental Audit must be provided by a suitably qualified environmental professional.
If the conditions of the Statement of Environmental Audit require ongoing maintenance or monitoring, before development is occupied the owner of the land must enter into an Agreement with the Responsible Authority under Section 173 of the Planning and Environment Act 1987 to the satisfaction of the Responsible Authority to the effect that all conditions of the Statement of Environmental Audit issued in respect of the land will be complied with. Written confirmation of compliance with the conditions of the Statement of Environmental Audit must be provided by a suitably qualified environmental professional.
A memorandum of the Agreement must be entered on the Title to the land and the owner must pay the costs of the preparation and execution of the Agreement and entry of the memorandum on Title.
The SMP must confirm that the following performance standards are met:
(a) Green Star Design & As Built (V1.1) 5 Star rating for both the Loft building and the Laneway building.
(b) 6.5 star average NatHERS rating for both the Loft Building and the Laneway Building.
(c) All apartments in the development to have a maximum NatHERS annual cooling load of 30MJ/m2.
(d) Compliance with the Urban Stormwater Best Practice Environmental Management Guidelines for the development.
(e) Provide the ability for at least 15% of carspaces to be retrofitted to accommodate the recharging of electric vehicles.
The following solar photovoltaic systems should be incorporated:
(f) Loft building: 12.6kW peak capacity
(g) Laneway building: 12.6kW peak capacity
The report must be to the satisfaction of the Responsible Authority and must confirm that all measures specified in the SMP have been implemented in accordance with the approved SMP.
The development must be constructed in accordance with the requirements/ recommendations of the approved Acoustic Assessment to the satisfaction of the Responsible Authority.
The WMP must be generally in accordance with the WMP submitted with the application (prepared by prepared by Leigh Design Pty Ltd and dated 5 April 2016) but modified to reflect the amended development referred to in Condition No. 1 of this Permit.
All works must be undertaken in accordance with the recommendations contained in the endorsed WMP to the satisfaction of the Responsible Authority.
No alterations to the WMP may occur without the written consent of the Responsible Authority.
The waste storage/collection area must not be used for any other purpose and must be maintained in a clean and tidy condition, and free from offensive odour, to the satisfaction of the Responsible Authority.
When approved, the CPMP will be endorsed and form part of this Permit.
A memorandum of the Agreement must be entered on the Title to the land and the owner must pay the costs of the preparation and execution of the Agreement and entry of the memorandum on Title.
Car spaces, access lanes and driveways shown on the endorsed plans must not be used for any other purpose.
This confirmation must be in the form of a report from a licensed land surveyor and must be submitted to the Responsible Authority no later than 7 days from the date of the sub-floor inspection. The upper floor levels must be confirmed before a Certificate of Occupancy is issued, by a report from a licensed land surveyor submitted to the Responsible Authority.
The external lighting must be designed, baffled and/or located to ensure that no loss of amenity is caused to adjoining and nearby land, to the satisfaction of the Responsible Authority.
For the intersection of Murray Road and Mary Street must show:
(a) Approach and departure lane widths for the east approach of Murray Road at Mary Street (interim layout) to be a minimum of 3.0m.
(b) Eastbound right turn storage lane into Mary Street to provide adequate storage based on SIDRA analysis Ref#16M1366000 and dated 04 July 2016 and submitted to VicRoads on7 July 2016.
For the intersection (interim layout) of Murray Road and Station Avenue must show:
(c) Traffic island at Station Avenue entry prohibiting eastbound right turn in to Station Avenue.
(d) One way left-in only from Murray Road.
In accordance with Section 69 of the Planning and Environment Act 1987, an application may be submitted to the Responsible Authority for an extension of the periods referred to in this condition.
Within twelve (12) months after the expiry date if the request relates to the completion of the development or a stage of the development.
Preston Market, Cramer & Mary Street PRESTON VIC 3072
Development of a ten storey building above a four storey podium (total of 14 storeys) comprising 155 dwellings and a reduction to the car parking requirements in accordance with the endorsed plans.
When approved, the plans will be endorsed and form part of this Permit.
The Landscape Plan must be prepared by a suitably qualified person and generally in accordance with the Landscape Plan prepared by Aspect Studios (dated 8 April 2016 and labelled "Preston Market Stage 1C Landscape Works) but modified to reflect the amended development referred to in Condition No. 1 of this Permit. and to address the recommendations contained in the John Patrick statement of evidence (dated July 2017) as follows:
(a) Details of the soil depth and volumes of each of the planter box types incorporating rates of 0.6 cubic metres of irrigated soil per 1 sq. metre of tree canopy (planter soil depth no greater than 1.0m); and 1.0 cubic metre of irrigated soil per 10. sq. metres of climbing plants (planter soil depth no greater than 800mm); and any consequential change in planter sizes;
(b) Commentary on the general water needs of the landscaping sufficient to show that the irrigation system is satisfactory.
The Landscape Plan is to be accompanied by a report prepared by a suitably qualified person that explains how the Landscape Plan has adequately addressed the above requirements to the satisfaction of the Responsible Authority.
When the Landscape Plan is approved, it will be endorsed and will then form part of this Permit.
In the event that a statement is issued in accordance with Part IXD of the Environment Protection Act 1970, before the development is occupied all conditions of the Statement of Environmental Audit must be complied with.
Written confirmation of compliance with the conditions of the Statement of Environmental Audit must be provided by a suitably qualified environmental professional.
If the conditions of the Statement of Environmental Audit require ongoing maintenance or monitoring, before development is occupied the owner of the land must enter into an Agreement with the Responsible Authority under Section 173 of the Planning and Environment Act 1987 to the satisfaction of the Responsible Authority to the effect that all conditions of the Statement of Environmental Audit issued in respect of the land will be complied with. Written confirmation of compliance with the conditions of the Statement of Environmental Audit must be provided by a suitably qualified environmental professional.
A memorandum of the Agreement must be entered on the Title to the land and the owner must pay the costs of the preparation and execution of the Agreement and entry of the memorandum on Title.
The SMP must confirm that the following performance standards are met:
(a) Green Star Design & As Built (V1.1) 5 Star rating for the Station building
(b) 6.5 star average NatHERS rating
(c) All apartments in the development to have a maximum NatHERS annual cooling load of 30MJ/m2
(d) Compliance with the Urban Stormwater Best Practice Environmental Management Guidelines for the development
In addition, a solar photovoltaic system with a 21.6kW peak capacity should be installed on the roof of the Station building.
The report must be to the satisfaction of the Responsible Authority and must confirm that all measures specified in the SMP have been implemented in accordance with the approved SMP.
The development must be constructed in accordance with the requirements/ recommendations of the approved Acoustic Assessment to the satisfaction of the Responsible Authority.
The WMP must be generally in accordance with the WMP submitted with the application (prepared by prepared by Leigh Design Pty Ltd and dated 5 April 2016) but modified to reflect the amended development referred to in Condition No. 1 of this Permit.
All works must be undertaken in accordance with the recommendations contained in the endorsed WMP to the satisfaction of the Responsible Authority.
No alterations to the WMP may occur without the written consent of the Responsible Authority.
The waste storage/collection area must not be used for any other purpose and must be maintained in a clean and tidy condition, and free from offensive odour, to the satisfaction of the Responsible Authority.
When approved, the CPMP will be endorsed and form part of this Permit.
A memorandum of the Agreement must be entered on the Title to the land and the owner must pay the costs of the preparation and execution of the Agreement and entry of the memorandum on Title.
Car spaces, access lanes and driveways shown on the endorsed plans must not be used for any other purpose.
This confirmation must be in the form of a report from a licensed land surveyor and must be submitted to the Responsible Authority no later than 7 days from the date of the sub-floor inspection. The upper floor levels must be confirmed before a Certificate of Occupancy is issued, by a report from a licensed land surveyor submitted to the Responsible Authority.
The external lighting must be designed, baffled and/or located to ensure that no loss of amenity is caused to adjoining and nearby land, to the satisfaction of the Responsible Authority.
For the intersection of Murray Road and Mary Street must show:
(a) Approach and departure lane widths for the east approach of Murray Road at Mary Street (interim layout) to be a minimum of 3.0m.
(b) Eastbound right turn storage lane into Mary Street to provide adequate storage based on SIDRA analysis Ref#16M1366000 and dated 04 July 2016 and submitted to VicRoads on7 July 2016.
For the intersection (interim layout) of Murray Road and Station Avenue must show:
(c) Traffic island at Station Avenue entry prohibiting eastbound right turn in to Station Avenue.
(d) One way left-in only from Murray Road.
In accordance with Section 69 of the Planning and Environment Act 1987, an application may be submitted to the Responsible Authority for an extension of the periods referred to in this condition.
Within twelve (12) months after the expiry date if the request relates to the completion of the development or a stage of the development.
[1] On 26 September 2017, Member Bennett was promoted to Senior Member. Although he did not preside during the hearing, section 65 of the Victorian Civil and Administrative Tribunal Act 1998 requires the Senior Member to preside. It becomes particularly relevant if opinions are divided between the Members constituting the Tribunal, but that has not occurred in this proceeding.
[2] There is a one space difference in material submitted to us. Ms Dunstan's evidence statement refers to 810 spaces. For convenience we have consistently referred to 810 spaces - the difference of one space makes no material difference to our assessment of parking provision.
[3] We have considered the submissions of all the parties that appeared, all the written and oral evidence, all the exhibits tendered by the parties, and all the statements of grounds filed. We do not recite or refer to all of the contents of those documents in these reasons.
[4] This 10 storey preferred height limit for this location is shown at the plan at page 17 of the 2007 Incorporated Plan.
[5] Advice of the Priority Development Panel Reference: PDP19, April 2007( Page 29)
[6] Mr Talacko indicated that for this type of major project, preparing for an external assessment would involve a cost in excess of $100,000.
[7] Amended grounds of refusal dated 13 June 2017.
[8] Ronge v Moreland CC (Red Dot) [2017] VCAT 550.
Preston Market Developments Pty Ltd
Darebin CC [2017] VCAT 1689