Powerhouse Terraces [2025] QBCCMCmr 157
The Body Corporate for Powerhouse Terrace (respondent)
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227(1)(b) and 229(3)(a)
Body Corporate and Community Management (Accommodation Module) Regulation 2020 (Accommodation Module)
COMMITTEE RESOLUTION; IMPROVEMENT TO LOT; REASONABLENESS - The applicant sought committee approval to renovate his kitchen, including making a new penetration in a post-tensioned floor slab. The committee requested various reports that the applicant provided, but then refused approval for the renovation. The applicant argues the committee acted unreasonably by refusing approval when there are existing penetrations in the slab, and by disregarding the reports it asked him to provide. He asks that the committee's refusal is reversed.
I am specifically seeking an order requiring the body corporate to agree to Motion 1 - "Lot Improvement Application - Lot 12" of 10/09/2024.
The word "reasonably" is used in its ordinary sense and "act reasonably" has a corresponding meaning. Reasonable action is evidence-based and rational.[3]
(i) the diameter of the penetration > > (ii) that it should not coincide with cast-in services, and > > (iii) any minimum distances between the penetration and tension cables, services, beams, columns, walls, or other penetrations.
The assertion that informed the denial "the risk is too great to other lots" seems unreasonable considering my lot is directly positioned over the garage which has no less than 30 existing slab penetrations. In addition, it seems an unreasonable decision that I was required to provide a certified Xray/sonograph and engineering report as well as engage a fire engineer to be compliant with the committee's request, which seems to have played no part in the decision. If these requirements have been met and I have been provided no other requirements that I needed to comply to I would also suggest the decision is unreasonable.
• Professional, to-scale floor plans specifying the exact location, size, and purpose of the proposed penetration.
• Structural and hydraulic engineering reports confirming the feasibility and impact of the proposed penetration on the structural integrity of the post-tensioned slab and the building.
• Updated engineer's and fire reports reflecting the penetration specifications (including dimensions).
• Evidence of appropriate certifications, insurances, and qualifications for contractors and the works proposed.
...the Powerhouse Terraces Level 1 slab is a Transfer Slab where loads from the wall above the level 1 slab, which support level 2, 3 and the roof are transferred to the concrete columns in the carpark beneath the slab.
As the walls above do not align with the concrete columns under, those wall loads are transferred to the concrete columns by the Level 1 transfer slab. It is because of this that if one Lot owner damages a post tensioned cable by core hole drilling the Level 1 slab, it may impact the integrity of the whole building and therefore all other Lot owners.
vii. Exaggerating the scope of my works from moving a sink and complying with standard building and tradesmen licencing and certifications to meet Australian and local government standards - to whole building utility load and whole property engineering, legal, liability and insurance related concerns.
viii.Now spending Body Corporate funds to investigate and validate concerns that were never raised when the initial requirements were set down and quite frankly are in many cases not related to the works I have asked approval for. Funds that could have provided a direction for a path towards rectifying the issues with my lot and ensuring the property is safely maintained.
1. The perfect example of this is the new requirement for a hydraulics engineer.
[1] Jacinta Kamel, bcsystems, email to applicant, 10 September 2024.
[3] Body Corporate For Beaches Surfers Paradise v Backshall [2016] QCATA 177 at [23].
[4] Julie Labzin, email of 18 August 2024, forwarded to Mr Davey by Jacinta Kamel on 23 August 2024.