[2025] VSC 576
General information, not legal advice.
Supreme Court of Victoria
2025-09-12
FORBES J
Original judgment source is linked above.
(a) Although Mr Powderly states that DOMA Group had no involvement in the Development on instructions, DOMA Group asserts that it had a 'limited involvement' as a joint venture partner developing a masterplan. This is repeated in the First Third Party's submissions that DOMA Group was 'only involved in the design of the masterplan'.
(b) Mr Powderly states that DOMA Constructions was a joint venture partner with Volt Lane Pty Ltd and responsible for construction of the ATO building, and that the joint venture engaged BLOC to construct the ATO building and related works although DOMA Group instructions are that it was a joint venture partner.
(c) DOMA Group instructed its lawyers that it built the ATO Office only. By contrast, Mr Powderly and Mr Sky refer to a joint venture between Volt Lane and DOMA Constructions with which BLOC was involved (in an unidentified capacity) in constructing the ATO building.
[1] Defendant, 'Defendant's Amended Third Party Notice' filed 6 March 2025 ('Third Party Notice'), 3 [5].
[2] The jurat of Mr Sky's affidavit of 6 June 2025 notes the affidavit was 'sworn', but the introductory passages refers to affirming. For consistency, this affidavit will be referred to as 'affirmed'.
[3] At the hearing the Court was informed that there was four affidavits of Aayushee Sharma, including an affidavit dated 20 February 2025. At page 30 of the transcript of the hearing, the Court was taken to an exhibit to this purported affidavit, being an email from Mr Skye to Ms Sharma. The Court was otherwise not taken to this affidavit during the hearing. The Court subsequently located this exhibit as part of Ms Sharma's affidavit affirmed 28 May 2025 at 221‑-222 of the exhibit bundle.
[4] Third party notice (n 1) 3, [2], [2A].
[9] The plan is extracted from architect drawing A200.1 and marked up by the defendant.
[10] Affidavit of Aayushee Sharma, affirmed 28 May 2025, Document 'Tab 14' in Exhibit 'AS-1', 92.
[11] Drawn by AWT Consulting Engineers.
[12] Ibid, Document 'Tab 19' in Exhibit 'AS-1', 226.
[13] Ibid, Document 'Tab 20' in Exhibit 'AS-1', 227.
[14] Ibid, Document 'Tab 21' in Exhibit 'AS-1', 268.
[15] Ibid, Document 'Tab 15' in Exhibit 'AS-1', 93. Also in exhibit 'PP', 93, exhibited to the affidavit of Paul Powderly, affirmed 13 May 2025.
[16] Ibid, Document 'Tab 16' in Exhibit 'AS-1', 94.
[17] Ibid, Document 'Tab 17' in Exhibit 'AS-1', 100-219; Affidavit of Paul Powderly, affirmed 13 May 2025, Exhibit 'PP-1', 1-99. In comparing the two exhibited documents, it appears the version of the external works contract provided by Mr Powderly is missing part of schedule 4 and all of schedules 5-13.
[20] Ibid, Document 'Tab 17' in Exhibit 'AS-1', 214-215.
[21] Ibid, Document 'Tab 17' in Exhibit 'AS-1', 216-217.
[22] Ibid, Document 'Tab 21' in Exhibit 'AS-1', 229-326.
[23] Specifically, drawing A213, version 'E'.
[24] Affidavit of Paul Powderly, affirmed 13 May 2025, 2 [7]-[14].
[30] Affidavit of Paul Powderly, affirmed 15 May 2025, 2 [3].
[31] Affidavit of Adrian Sky, 15 May 2025, 2 [9].
[43] Sharma (n 9) Document 'Tab 8' in Exhibit 'AS-1', 64.
[44] Ibid, Document 'Tab 10', in Exhibit 'AS-1', 75.
[46] Ibid, Document 'Tab 15' in Exhibit 'AS-1', 93.
[47] Ibid, Document 'Tab 21' in Exhibit 'AS-1', 268.
[48] Affidavit of Aayushee Sharma, affirmed 6 June 2025, 2 [10].
[52] 230V Harvest Home Road Pty Ltd v Salvo & Ors [2021] VSC 558.
[53] Second Third Party (BLOC), 'Submissions In Support Of Second Third-Party's Interlocutory Application For Summary Judgement / Strikeout Of Pleadings' filed 5 June 2025 [17] ('BLOC's Submissions').
[54] Affidavit of Paul Powderly, affirmed 15 May 2025, 168.
[55] Per affidavit of Aayushee Sharma, affirmed 28 May 2025, 7.
[56] For example, per the construction drawing A200.1
[57] Affidavit of Aayushee Sharma, affirmed 28 May 2025, 75.
Retallick
The Owners - Strata Plan No. 90567 & Ors [2025] VSC 576
PRACTICE AND PROCEDURE ― SUMMARY JUDGMENT APPLICATION ― Applications by third parties for summary judgment, or in the alternative, strike out of the first defendant's third party notices ― Laying of a polished concrete surface within part of construction of a development including a shopping precinct ― Whether documentary evidence provided in application makes clear that a claim against the third parties for liability for construction of the pedestrian surface has no real prospect of success ― Where a factual dispute about circumstances and responsibility for construction of the polished concrete surface in the relevant area of the Development is raised by the documents and affidavit evidence ― Summary judgment refused ― ss 62 and 63 of the Civil Procedure Act (2010) (Vic) ― Lysaght Building Solutions Pty Ltd (t/as Highline Commercial Construction) v Blanalko Pty Ltd (2013) VR 27 ― 230V Harvest Home Road Pty Ltd v Salvo & Ors [2021] VSC 558.
(2013) 42 VR 27