Supreme Court of Victoria
2014-03-14
J FORREST J
Original judgment source is linked above.
EVIDENCE - Prospective application to file and serve supplementary report - Late service of expert report - Prejudice - Prejudice avoidable by virtue of timetabling - Change of assumptions forming basis of expert brief - Lay evidence affecting assumptions underlying expert evidence - Prospective leave to file and serve expert report granted subject to certain timetabling conditions - Civil Procedure Act 2010 (Vic), s 9.
As in their earlier reports, the experts would be told to assume the fuel hazard within the coupes did not exceed "high." [5]
We agree that Mr Incoll's notional coupes do not always identify potential planned burning area boundaries. The notional coupes represent an "area" where DSE could or may apply the provisions of the Code and Fire Protection Plans and/or Fire Management Plans. We agree that in some cases within the notional coupes it would be necessary to fall back to existing roads or trails, or to construct new mineral earth breaks to utilise as the burning block boundary. Wherever it is necessary to do this, an element of land within the notional coupe will automatically be excluded from the burning block and will not be subjected to prescribed fire. We agree that although Mr Incoll has calculated coupe areas, the areas he calculates are not necessarily representative of the actual area to which planned burning could or is likely to be applied. We note that any such exclusions are in addition to areas that might routinely not burn in a burning block, or burn at a lesser intensity because they are riparian strips, gully areas or shaded areas where fuel moisture differential precludes burning. In practice, these latter types of areas are likely to occur within any prescribed burning blocks.[9]
We agree that the coupes identified in the Incoll report are a set of "notional" burning coupes that represented a maximum potential prescribed burning area, and which do not represent the actual prescribed burning outcomes that would be achieved once the ecological and other constraints (eg. topography, access, practical perimeter locations, etc) had been factored in at the coupe planning stage (as noted on page 22 of the Incoll report).[10]
Aon demonstrates that there are a number of factors relevant to an application such as this. For instance:
(a) whether there will be a substantial delay caused by the amendment;
(b) the extent of any wasted costs;
(c) whether there is an irreparable element of unfair prejudice caused by the amendment;
(d) concerns of case management arising from the stage in the proceeding when the amendment is sought;
(e) whether the grant of the amendment will lessen public confidence in the judicial system; and
(f) whether a satisfactory explanation has been given for seeking the amendment at the stage when it is sought.
It is, however, to be remembered that the primary question still remains:
What do the interests of justice dictate? Aon reminds us that the prism through which these interests are viewed is wider than just that of the moving party. [23]
It is sensible and reasonable to conclude that a claim that is dependent for its success on expert evidence becomes fanciful once the basis for the expert opinion that has thus far sustained it evaporates. That is what has happened here_. The expert's opinion based on unproved assumption will become irrelevant and is likely to become either inadmissible or unacceptable to the court._ It is a central tenet of the Civil Procedure Act, evident in its application to experts, that expert opinion plays a critical role in relation to the overarching purpose expressed by that Act. Its obligations come into play prior to the trial, for participants in litigation on whom the overarching obligation fails, when the basis for expert opinion falls away.[28] (citations omitted and emphasis added)
[1] I have used the Department's previous title, "DSE", throughout this Ruling.
[2] The term "planned burning", as used in this Ruling, refers to fuel reduction burns. These are fires deliberately lit and controlled by DSE on public (and occasionally private) land. Such burns are aimed at reducing the overall fuel hazard on public land, and accordingly, reduce the threat or intensity of subsequent wildfire on or around that land.
[3] SPI is leading the claim against DSE. Mrs Matthews has also joined DSE, as has UAM on its cross-claim.
[5] SPI's submissions, [14] (CRT.SPN.202.0001, 0004-0005).
[6] I have set out some of these orders at [17]-[22] of Matthews v SPI Electricity (Ruling No 20) [2013] VSC 197.
[7] Appendix Seven to Mr Incoll's report (EXP.SPN.600.0001, 0066). The Kilmore Fire Area Public Land is referred to in this Ruling as "public land" and includes State forest, regional parks and national parks in the Kilmore East/Kinglake area.
[13] DSE's submissions, [21] (SUB.STA.008.0001, 0005).
[15] SPI's submissions, [11] (CRT.SPN.202.0001, 0004).
[20] [2011] VSC 391, [12] ("Thomas").
[22] [2009] HCA 27; (2009) 239 CLR 175 ("Aon").
[23] [2013] VSC 197, [38] citing Thomas v Powercor Australia Ltd (Ruling No 3) [2011] VSC 391, [12].
[24] [2013] VSC 239, [21].
[25] Civil Procedure Act 2010 (Vic), s 9.
[26] Matthews v SPI (Ruling No 20) [2013] VSC 197; Matthews v SPI (Ruling No 23) [2013] VSC 239.
[28] [2013] VSC 74, [39].
Matthews
SPI Electricity & Ors
(2009) 239 CLR 175