JUDICIAL REVIEW - Victorian Building Authority decision - Show cause procedure against building surveyor and building inspector following plaintiff's complaints - Plaintiff contracted with builder to construct a house - No disciplinary action taken - Whether VBA made jurisdictional errors - Building Act 1993 s 182; Building Regulations 2006 reg 1502(a).
1 Mr Shannon Draper seeks judicial review of a decision made by the defendant, the Victorian Building Authority ('VBA'), with respect to Registered Building Inspector Mr K Wilson (the 'RBI'). This proceeding is related to Mr Draper's proceeding S ECI 2020 03774, in which he sought judicial review of the VBA's decision with respect to Registered Building Surveyor Mr C Giambattista (the 'RBS'). The proceedings were heard together with the parties addressing, with a few exceptions, similar grounds, by similar submissions.
2 The VBA decision was made by Ms A Smith, Delegate and Principal Decision-Maker, but I will refer to the VBA as the decision-maker unless the context requires otherwise. Ms Smith also drafted the Show Cause Notice.
3 To obtain judicial review remedies, Mr Draper must establish that the VBA made a jurisdictional error.
4 The VBA's decision arises from the following circumstances. In August 2017, Mr Draper complained to the VBA about works carried out by the RBS and the RBI in 2014 and 2015. The VBA made inquiries and, on 28 November 2019, issued Show Cause Notices to the RBS and the RBI under s 182 of the Building Act 1993 (the 'Building Act'). The RBS and RBI provided written responses to those notices. On 17 March 2020, the VBA decided not to take disciplinary action against either of them. Its reasons for decision were dated 8 April 2020.
5 Mr Draper contended that the VBA made jurisdictional errors in its decisions and seeks, among other thing, the quashing of the decisions, the making of orders or declarations to rectify perceived defects in Victoria's building legislation, the making of orders requiring the VBA to properly perform its functions, and the making of declarations against the VBA that it failed to act as a model litigant.
6 Mr Wilson, the RBI, was not joined as a defendant and therefore has not had the opportunity to be heard in respect of Mr Draper's applications.
7 This proceeding is one of several that Mr Draper has commenced that arise from the same history which I now summarise.
8 In June 2014, Mr Draper entered into a contract with Simonds Homes Victoria Pty Ltd ('Simonds Homes') to construct a house at Wallan. Mr Draper identified defects with the construction of the house and arranged for the VBA to inspect it. Mr Draper later commenced civil proceedings against Simonds Homes in the Victorian Civil and Administrative Tribunal (the 'Tribunal' or 'VCAT') and successfully sought relief in respect of those defects. The Tribunal's orders included:[1]
Pursuant to section 53(2)(g) Domestic Building Contracts Act 1995, the Respondent must rectify defective building works, by demolishing the existing slab, and laying a slab for the dwelling as enables the Finished Floor Level of the garage section of the slab to be 150 mm above a Finished Ground Level at the slab's western edge of RL98.58 metres, in accordance with Site Plan 1.1 signed by the Applicant on 5 June 2014.
9 In this proceeding and in three other proceedings,[2] Mr Draper has raised complaints about the VBA and the now-abolished Building Practitioners Board (the 'BPB'). Mr Draper has also raised concerns about the merits of decisions made by the VBA, the BPB and VCAT, as well as the regulation of the Victorian building industry.
10 The VBA issued the Show Cause Notice to the RBI at the same time as the Show Cause Notice to the RBS. The Show Cause Notice to the RBS proposed three grounds for disciplinary action. The Show Cause Notice to the RBI contained only the equivalent of the third ground in the Show Cause Notice to the RBS, although with some modifications.
11 In the Show Cause Notice, the VBA alleged that the RBI had contravened Building Regulation 1502(a) in connection with the frame completion inspection of the home. In issue was whether the inspected building was not compliant with the endorsed plans or inconsistent with the roof truss design. The Show Cause Notice stated:
The grounds for disciplinary action are as follows:
Ground 1: Approving frame inspection when design and construction of frame was not compliant and engineer's design instruction not provided.
...
On 14 August 2014, you contravened regulation 1502(a) of the Regulations because you approved the frame inspection in circumstances where the design and construction of the frame was non-compliant, and the direction to supply the rectification instruction from the engineer regarding the modification of the slab (item 28) had not been provided.
Your approval of the approved frame inspection falls below the standard expected of a reasonably competent and professional building inspector in the performance of your work on behalf of the RBS.
13 Regulation 1502(a), at the time of the Show Cause Notice, was:
A registered building practitioner must -
(a) perform his or her work as a building practitioner in a competent manner and to a professional standard...
14 The first two particulars of ground 1 of the Show Cause Notice alleged that '[t]he design of the roof truss did not allow for the additional loading for a solar hot water system'. It alleged that the design was not compliant with the endorsed drawings and specifications. There was no evidence that the frame/roof truss design was approved by the RBS. At the approved frame inspection, the frame construction displayed incomplete or non-compliant items.
15 The VBA considered the first two particulars together and decided that they had not been established. It concluded that the contents of an email from Timbertruss**,** the manufacturer of the truss**,** confirmed 'the speculation in the Collina report' that the weight of the solar collector panels had been incorporated into the engineering.[3]
16 The Show Cause Notice then alleged that 'at the approved frame inspection, the frame construction displayed incomplete or non-complaint items'. The first was the existence of large gaps in the hips/truss connections which were non-compliant. The VBA concluded that this allegation was not established.[4]
17 The next particular alleged that there were insufficient clout nails to secure the bracing for the ensuite wall. The VBA accepted that there was insufficient evidence to conclude that clout nails were missing from the speed bracing on the ensuite wall at the time of the RBI's frame completion inspection.
18 The next particular alleged that the bottom plate of the ensuite was excessively cut back and appeared cracked when unsupported by the slab. The VBA considered that this non-compliant item was of a very minor nature.
19 The next particular alleged that the roofing battens should have been installed before the frame stage was considered complete. The VBA accepted that the installation of roof battens was not required for the 'frame work' to be considered complete. The Building Code of Australia required that roof battens be installed in accordance with AS 1684 as part of the installation of roof cladding, not as part of the frame.
20 The next particular alleged that the 31 July 2014 frame inspection listed a defect noting an excessive slab of 50mm overhang beyond the bottom plate to the side of the garage and the second bedroom external walls referred to in Item 28 which needed to be cut back. The Show Cause Notice stated:
The approved frame inspection should not have been approved because the design did not comply with the endorsed plans, there were items which did not comply with the Regulations or the Timbertruss specifications, and the direction to provide the engineer's rectification design for modifying the slab was not provided.
21 The VBA accepted that this item had been attended to, although it maintained that it would have been preferable for the RBI's report of the complete inspection of the frame to have documented that Item 28 was complete because a determination was made not to cut the slab. However, the VBA accepted that such a determination had occurred.
22 The VBA concluded that the RBI contravened regulation 1502(a) in respect of the non-compliant item relating to the excessively cut back bottom plate on the external ensuite wall. However, the VBA regarded this as a very minor contravention. It was the only item remaining listed in the Show Cause Notice that had been established. As the RBI had not previously been the subject of the disciplinary action, the delegate did not take any disciplinary action against him.
23 For the reasons given in my judgment in S ECI 2020 03775, I consider that Mr Draper has standing to bring this proceeding.
24 Mr Draper's proceeding against the RBI raised twenty-two grounds, all of which, with only minor changes, were also raised in S ECI 2020 03774, concerning the VBA's decision regarding the RBS. The grounds that were unique to S ECI 2020 03774 and that were not raised in S ECI 2020 03775 were the tenth, eighteenth, and nineteenth grounds. Mr Draper also sought leave to add and rely on six additional grounds.[5]
25 Mr Draper's grounds included in his amended originating motion were:
26 I have considered all of Mr Draper's grounds on which he relies in this proceeding in my reasons given in S ECI 2020 03774, and adopt those reasons as my judgment in this proceeding.
27 I also adopt my reasons for refusing leave to add the additional 6 grounds upon which Mr Draper sought to rely and which are set out in my judgment in S ECI 2020 03774.
28 For the reasons given in S ECI 2020 03774, I have reached the conclusion that Mr Draper has not established any of the grounds upon which he relies in this proceeding.
30 I will give the parties an opportunity to make written submissions about the costs of the proceeding.
[1] Draper v Simonds Homes Victoria Pty Ltd [2016] VCAT 669.
[2] The judgments in the other three proceedings are Draper v Victorian Building Authority [2022] VSC 485, Draper v Victorian Civil and Administrative Tribunal & Ors [2022] VSC 486 and Draper v Victorian Building Authority [2022] VSC 487.
[3] Victorian Building Authority, Notice of Decision Ending Show Cause Process Without Action (VBA REF: PDU/7/3109), [24].
[5] These proposed additional grounds are discussed beginning at [187] of Draper v Victorian Building Authority [2022] VSC 487.
[6] The equivalent ground in S ECI 2020 03774 (ground 1) is discussed beginning at [44] of Draper v Victorian Building Authority [2022] VSC 487.
[7] The equivalent ground in S ECI 2020 03774 (ground 2) is discussed beginning at [44] of Draper v Victorian Building Authority [2022] VSC 487.
[8] The equivalent ground in S ECI 2020 03774 (ground 3) is discussed beginning at [53] of Draper v Victorian Building Authority [2022] VSC 487.
[9] The equivalent ground in S ECI 2020 03774 (ground 4) is discussed beginning at [53] of Draper v Victorian Building Authority [2022] VSC 487.
[10] The equivalent ground in S ECI 2020 03774 (ground 5) is discussed beginning at [68] of Draper v Victorian Building Authority [2022] VSC 487.
[11] The equivalent ground in S ECI 2020 03774 (ground 6) is discussed beginning at [68] of Draper v Victorian Building Authority [2022] VSC 487.
[12] The equivalent ground in S ECI 2020 03774 (ground 7) is discussed beginning at [68] of Draper v Victorian Building Authority [2022] VSC 487.
[13] The equivalent ground in S ECI 2020 03774 (ground 8) is discussed beginning at [78] of Draper v Victorian Building Authority [2022] VSC 487.
[14] The equivalent ground in S ECI 2020 03774 (ground 9) is discussed beginning at [83] of Draper v Victorian Building Authority [2022] VSC 487.
[15] The equivalent ground in S ECI 2020 03774 (ground 11) is discussed beginning at [173] of Draper v Victorian Building Authority [2022] VSC 487.
[16] The equivalent ground in S ECI 2020 03774 (ground 12) is discussed beginning at [59] of Draper v Victorian Building Authority [2022] VSC 487.
[17] The equivalent ground in S ECI 2020 03774 (ground 13) is discussed beginning at [179] of Draper v Victorian Building Authority [2022] VSC 487.
[18] The equivalent ground in S ECI 2020 03774 (ground 14) is discussed beginning at [179] of Draper v Victorian Building Authority [2022] VSC 487. This ground in S ECI 2020 03774 refers instead to Mr Giambattista but is otherwise identical.
[19] The equivalent ground in S ECI 2020 03774 (ground 15) is discussed beginning at [93] of Draper v Victorian Building Authority [2022] VSC 487.
[20] The equivalent ground in S ECI 2020 03774 (ground 16) is discussed beginning at [105] of Draper v Victorian Building Authority [2022] VSC 487.
[21] The equivalent ground in S ECI 2020 03774 (ground 17) is discussed beginning at [116] of Draper v Victorian Building Authority [2022] VSC 487.
[22] The equivalent ground in S ECI 2020 03774 (ground 20) is discussed beginning at [138] of Draper v Victorian Building Authority [2022] VSC 487.
[23] The equivalent ground in S ECI 2020 03774 (ground 21) is discussed beginning at [144] of Draper v Victorian Building Authority [2022] VSC 487.
[24] The equivalent ground in S ECI 2020 03774 (ground 22) is discussed beginning at [159] of Draper v Victorian Building Authority [2022] VSC 487. This ground in S ECI 2020 03774 refers instead to Mr Giambattista but is otherwise identical.
[25] The equivalent ground in S ECI 2020 03774 (ground 23) is discussed beginning at [159] of Draper v Victorian Building Authority [2022] VSC 487. This ground in S ECI 2020 03774 refers instead to Mr Giambattista and addresses his failure 'to properly oversee compliance issues' rather than 'to properly address compliance issues', but is otherwise identical.
[26] The equivalent ground in S ECI 2020 03774 (ground 24) is discussed beginning at [159] of Draper v Victorian Building Authority [2022] VSC 487.
[27] The equivalent ground in S ECI 2020 03774 (ground 25) is discussed beginning at [150] of Draper v Victorian Building Authority [2022] VSC 487.
Draper