[2007] VCAT 1309
Victorian Civil and Administrative Tribunal
2007-07-27
Ms J, Mr P
Original judgment source is linked above.
Would there be other potential impacts upon nearby dwellings?
Would the proposal adversely impact upon road safety?
Decommissioning processes and other responsibilities
The use and development must be carried out in accordance with the endorsed Landscaping and Visual Screening Plan to the satisfaction of the Responsible Authority.
The use and development must be carried out in accordance with the endorsed Off-site Landscape Plan to the satisfaction of the Responsible Authority.
The use and development must be carried out in accordance with the endorsed Traffic Management Plan to the satisfaction of the Responsible Authority and VicRoads and the cost of any works including maintenance is to be at the permit holders expense.
The use and development must be carried out in accordance with the endorsed Environmental Management Plan to the satisfaction of the Responsible Authority.
The use and development must be carried out in accordance with the endorsed bird and bat management plan to the satisfaction of the Responsible Authority.
The use and development must be carried out in accordance with the endorsed Heritage Protection Management Plan to the satisfaction of the Responsible Authority.
A report summarising the results of the program, and the data collected, must be forwarded to the Responsible Authority within 30 days of the end of the monitoring period. The results must be written in plain English and formatted for reading by lay people.
Recommendations to address any non-compliance with NZS6808 must be included in the report and, on agreement by the Responsible Authority, measures to address non-compliance must be immediately implemented to the satisfaction of the Responsible Authority.
The use and development must be carried out in accordance with the endorsed process to the satisfaction of the Responsible Authority.
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires or within three months afterwards.
[1] We joined Ms Emma Elsworth as a party to the joint application for review without objection by any party.
[2] Map 5 in the Landscape and Visual Assessment Study by J Cleary. This cites houses #1-18 but omits a number 15. Dwellings #6 and 7 are in the same ownership as the review site and are 509 metres and 525 metres from the closest turbine based on Table 1 of the Marshall Day Acoustic report dated 10 October 2006 at page 5. Another dwelling has also been omitted from a group of four that exist on the west side of the Ballan-Daylesford Road more than 1.5km from the closest turbine. We also observed on our visit an older timber (farm?) dwelling north of dwelling #3 that appears to have been omitted from all material and not mentioned in submissions. It may not be occupied. It has extensive vegetation surrounding it. It would be more than 600 metres from the closest turbine. House #18 is undergoing extensive works.
[3] Based on Table 1 of the Marshall Day Acoustic report dated 10 October 2006 at page 5.
[5] Landscape and Visual Assessment Study by J Cleary.
[6] This has been located on site since August 2006.
[7] As stated in the material accompanying the planning permit application - planning report at page 42 of 68.
[8] For example, acoustic, fauna, archaeological and geotechnical assessments.
[9] The Tribunal has considered the provisions of Clause 35.07 in addition to Clauses 11, 12, 14, 15.01, 15.05, 15.09, 15.14, 17.02, 18.02, 19.03, 21 (Municipal Strategic Statement), and Clause 65 (general decision guidelines). Clause 21.03-3 includes a Structure Plan for Muskvale Leonards Hill. State and national greenhouse strategies, and legislation relating to flora and fauna protection, are among other material considered by the Tribunal. Clause 52.32 applies to wind energy facilities with decision guidelines requiring consideration of:
[10] We have considered the provisions of Clause 42.01 and Schedule 1.
[11] VicRoads has offered no objection to the proposal subject to conditions being included on any permit to issue.
[12] Our inspection occurred on 22 June 2007. It included the review site, many of the dwellings and properties within one kilometre of the proposed turbine locations, and the wider area.
[13] Amendment VC16 to all planning schemes.
[14] Macarthur Wind Farm Pty Ltd v Moyne SC [2006] VCAT 1423, Start v Pyrenees SC [2006] VCAT 2599, P1677/2005 Naroghid Wind Farm Pty Ltd v Corangamite SC.
[15] For example, reports dealing with wind farms proposed at Bald Hills (2006), Macarthur (2006), Yaloak (2005) and Wonthaggi (2003) by independent panels and advisory committees.
[16] Capacity factor is defined by Sustainability Victoria as the ratio of annual energy generation to the maximum possible generation of the plant operated at full power every hour of the year.
[17] The Star, Tuesday 15 May 2007, page 37.
[18] We refer to this organisation as "SV".
[20] For example, permit application PL-SP/05/0283 Macarthur wind farm, report of the Panel, May 2006 at page 59. That panel also recommended public reporting of the actual capacity factor, although that was not included in the issued permit.
[21] A recent example is McGill v Bass Coast Shire Council [2007] VCAT 1028 that cites several other cases.
[22] We refer to these as the "Policy Guidelines".
[23] These themes are found in the Hepburn Planning Scheme and similarly in the Moorabool Planning Scheme. The Farming Zone includes two decision guidelines on these themes:
[24] Policy Guidelines at page 24 Evaluation of Visual Amenity.
[27] Landscape & Visual Assessment Study, 2006, Map 4, page 35..
[28] Telstra Corporation v Hepburn SC (Red Dot) [2005] VCAT 1099.
[29] Telstra Corporation v Hepburn SC (Red Dot) [2005] VCAT 1099 at paragraph 35.
[30] Telstra Corporation v Hepburn SC (Red Dot) [2005] VCAT 1099 at paragraph 50.
[31] Schedule 2 - Visual Amenity and Building Design.
[32] Clause 21.03 of the Hepburn Planning Scheme.
[34] Map 5 - Neighbouring Residences, Landscape & Visual Assessment Study, 2006, at page 41.
[35] A condition included on the Notice of Decision by the Council and accepted by the Respondent.
[36] There is no #15 on the plan. Our assessment includes Perry residence but omits #6 and #7 as they are in the same ownership as the review site. We have also referred to another unidentified house with #21, 22 & 23. A further (possibly) vacant cottage is near to dwelling #1 but surrounded by plantings. Distances to turbines sourced from Cleary study with turbines in location shown on the plans.
[37] This standard is also referenced as NZS6808:1998. There is no Australian Standard (a draft was published in 2004).
[39] Bald Hills EES report at pages 192 - 193.
[40] Extract from Wind Farms Environmental Noise Guidelines, 2003, SA EPA, at page 10 commenting on NZS6808.
[41] Recent examples of commentary on this matter can be found in Nightingale v Latrobe SC [2006] VCAT 384 and Viste v Cardinia SC [2006] VCAT 340 although the factual circumstances in both instances differ from the current proceeding. In addition, refer to the comments on the Panel in relation to the Bald Hills wind farm at pages 202 - 203.
[42] We were advised by the Respondent that the turbines would not be operational at wind speeds of less than 3 metres/second.
[43] Refer to cited evidence Bald Hills panel report at pages 196 - 197 and Bald Hills panel conclusions at pages 205 - 208.
[44] Wind Farms Environmental Noise Guidelines, 2003, SA EPA, at page 13.
[45] Letter to Mr D Shapero from Mr G Hull, Manager Coasts and Land Use Planning, South West, dated 19 June 2006. That may relate to an earlier draft of the June 2006 Fauna Assessment Report.
[46] It does not appear that all of DSEs requested conditions from 19 June 2006 letter were included in its letter to the Shire commenting on the proposal - a letter dated 22 December 2006.
[47] For example, Yaloak Wind Farm Panel, March 2005, at pages 116 - 117, and proposed Cullerin Range Wind Farm in NSW (west of Goulburn).
[48] Leonards Hill Wind Farm - Fauna Assessment, Addendum, June 2007 at page 4 of 9.
[49] The letter from Mr Hull to Mr D Shapero indicates that little or no native vegetation exists on the land. The letter refers to an inspection of the site by DSE.
[50] Such as the National Estate or Victorian Heritage Register.
[51] Reference was made to some relics being dug up on the hill by Ms Barron's father but no indication that the location was close to the site for the turbines.
[54] Report by Hardrock Geotechnical Pty Ltd dated 27/10/06.
[55] Refer comments in Macarthur wind farm panel report at page 138.
[56] Letter to the Council dated 8/12/06.
[57] The situation may be different if the land was designated as 'crown land' or the native title claim was at a different stage.
Perry
Hepburn SC [2007] VCAT 1309