[2025] VCAT 948
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-10-24
Original judgment source is linked above.
WILL THERE BE ANY UNREASONABLE OFF-SITE AMENITY IMPACTS?
IS AN APPROPRIATE LEVEL OF INTERNAL AMENITY ACHIEVED?
[87] The applicant is also relying on the communal open space for use by future occupiers of those dwellings that do not have any private open space. Relying on communal open space for private open space is obviously, not appropriate, as it is not private.
[51] The second concern raised by Council is the complete absence of private open space to any of the proposed apartments. Usually in a design such as this, areas of private open space are provided by way of balconies. Instead, this design adopts a different approach, which is described in the following manner in the expert evidence of Ms Milner.
I understand the proposal is advanced as an alternative co-housing option, and as an integrated series of compact secure and affordable residential spaces, clustered around a range of on-site shared spaces and facilities including two gardens, a terrace, and communal laundry and kitchen.[6]
[52] I acknowledge that a more detailed description of the co-housing model that is proposed for the review site is found in a Planning Report[7] that was included at page 288 of the Tribunal Book.
[53] The expert evidence of Ms Milner also goes on to describe more fully the communal areas that are proposed to be provided on the review site.
The proposal provides for 138.5 sqm of communal open spaces (exceeding the minimum requirement for a 24-dwelling development, by 40.5 square metres).
The communal open space would be provided by 5 different indoor and outdoor spaces, meeting the expectation that at least 30 sqm should be provided outdoors.
The spaces would comprise:
[54] Usually I would be concerned as to whether this approach would achieve an outcome consistent with Clause 58 of the Merri-bek Planning Scheme. Clause 58 includes the following guidance.
[55] The relevant objective relating to the provision of private open space is found at Clause 58.05-3, and sets out the following.
To provide adequate private open space for the reasonable recreation and service needs of residents.
[56] It is an interesting conundrum as to whether the provision of no private open space can be said to meet the objective of providing adequate private open space. In responding to that conundrum, it might be interesting to compare this part of the Victorian Planning Provisions with Clause 52.06, and the scenario where zero car parking is at times provided in response to a purpose that seeks, "To ensure the provision of an appropriate number of car parking spaces..." Another interesting conundrum is whether the failure to meet an objective at Clause 58, means that I must refuse to grant a permit for the proposed development. To this end I note that while Clause 58 says that a development must meet all of the objectives, there is no words to the effect of, 'A permit cannot be granted if the objectives are not met.' I might observe that on one view, words to this effect are likely to be needed in order to make the objectives a mandatory requirement.
[57] These conundrums are muddied in this proceeding as it involves an application to amend an existing permit, where the existing planning permit allows the construction of 16 apartments, all without any private open space. As such, the proposal that is before me is to extend the existing approved 'style' of residential development to a further 8 apartments on an adjoining property. In making a decision on the original planning permit application, the Council's delegate wrote the following in their assessment as justification for the non-provision of private open space.
Communal open space is the sole open space for residents with no private balconies provided for any dwelling. A total common area of 85sqm is provided for residents in the form of 25.5sqm wintergarden, 14.5sqm communal kitchen, 31.5 sqm pergola area and 13.5sqm community laundry. The common areas cater for a variety of residents needs which in a sense is private given that only residents can access this space. Arguably these larger spaces are more useable than an 8sqm balcony would be to residents and provide a better amenity having integrated landscaping and furniture. The shared facilities encourage interaction between residents which is a key initiative of the development that adopts a new type of housing model aimed at a particular demographic. It is considered that the provision of open space would satisfy the objectives of Clause 58.[9]
[58] I have not been informed why this analysis would not also be relevant and applicable to the 8 additional apartments that comprise the proposed amendment to the existing permit. Ms Lunn sought to advance an argument that this proposed amendment comprises more larger apartments, which would have a greater number of occupants, and would therefore create a greater demand for private open space. However, the fact is that this amendment will comprise 4 additional studio apartments, 3 additional one bedroom apartments, and one additional two bedroom apartment. This generally continues the ratio of these apartment types allowed under the existing approval. Therefore, I am not persuaded that this could be a reason to now require private open space.
[59] Ms Lunn also sought to argue that the proposal adds apartments, without substantially adding to the amount of communal open space. However, the amended proposal that is before me does propose to enlarge the usable area of outdoor communal space at the third floor, provides a new large communal area on the first floor, and also provides additional communal areas on the ground level. The result of these changes is a substantial increase in communal open space, for the addition of only 8 dwellings.
[60] I am persuaded by the evidence of Ms Milner that given the style of housing proposed for the review site, the circumstances surrounding the original approval, and that what is before me is an amendment to an existing permit, I find that an appropriate open space outcome can continue to be achieved in this unique housing form, through the reliance on communal open space only. For these reasons I find that no private open space is required in response to the objectives at Clause 58 of the Merri-bek Planning Scheme.
[90] In relation to the provision of open space, while some of the proposed dwellings have a limited area of private open space, all residents will have access to very generous areas of communal open space, which is described in the following manner in the evidence of Mr Iles.
[91] In addition, the future residents on the review site will also have access to the 1923 square metres of open space that exists on the part of the broader site that is covered by the Urban Floodway Zone. > > [92] We find that the provision of private open space on the review site is appropriate. We make this finding for the following reasons. While six of the proposed 21 dwellings will have less than 40 square metres of private open space, we consider that the areas that are provided for these six dwellings are functional, appropriately dimensioned, and importantly will enjoy high levels of solar access. To the extent that these areas fail to meet Standard B28, we consider that this is more than addressed by the substantial provision of communal open space on the review site. Indeed, we consider that the standard and variety of communal facilities to be provided on the review site, will provide a higher standard of internal amenity for future residents, than if each dwelling were provided with the area required under Standard B28. > > [93] We note that many of the areas of secluded private open space are provided at ground level surrounded by low open style fencing. As a result, views can easily be gained into these areas of private open space. While that reduces the available privacy, it also enhances the sense of community and the interactions that can occur between neighbours. We observe that the positive aspect related to the enhanced interactions, might balance the negative associated with reduced privacy. Others might feel that the positive outweighs the negative. Given the impact on privacy exists as a result of viewing between areas of communal open space and private open space, as opposed to direct views from the public realm, we consider that the lack of privacy to the areas of private open space does not 'tip the scales' and make the areas of private open space unacceptable. We form this view having regard to the wide range of communal open space options available on the review site, and the fact that many of the proposed dwellings are provided with a secondary area of private open space in the form of a first floor balcony.
[62] According to the evidence of Mr Pagliaro, 17 of the proposed 571 dwellings are provided with no private open space, and 'a number' of other apartments are provided with areas of private open space that is less than that required under Standard D20.[10] While nine of the apartments with no area of secluded private open space are studio apartments, eight of the apartments are two bedroom apartments with a floor area of 83 square metres. > > ... > > [64] Mr Pagliaro opines that despite this non-compliance with Standard D20, an acceptable level of internal amenity will be provided to all future occupants, due to the extent of communal open space proposed on the review site. These areas are detailed in the following manner at page 4 of Mr Pagliaro's evidence.
Total communal areas comprising 2,585sqm indoor space and 3,350sqm outdoor space.
Ground level (total of 1,463sqm indoor, 2,870sqm outdoor):
[65] This provision of 5935 square metres of communal facilities within the proposed development compares well with the required provision of 250 square metres of communal open space that is required under Standard D7. The extent of provision of communal open space is one factor to consider, when deciding whether to allow a development that does not comply with Standard D20. Another consideration is the extent of public open space available within a short walking distance of the review site, at Albert Park Lake, the Royal Botanic Gardens and Fawkner Park. These are relevant considerations as both public and communal open space are referenced in the decision guidelines at Clause 58.05-3 of the Port Phillip Planning Scheme. > > ... > > [68] In this proceeding, we are persuaded by the evidence of Mr Pagliaro that the private open space objective is met, and an acceptable level of internal amenity provided, by the proposal that is before us. While this means that some apartments are provided with no private open space, and others are provided with areas less than that required under Standard D20, we consider that is more than compensated by the accessibility to both communal and private open space. > > [69] In regards to the proposed communal open space, we consider that the overall extent provided at 5935 square metres, and the diversity of the spaces provided, provide a very significant and weighty benefit to the future residents of the review site. We note that future residents will have access to communal open space which can provide a variety of recreational needs, including a swim, a gym workout and a yoga class. In addition, other components of the communal open space provides working from 'home' spaces, residents lounges, dining rooms, meeting rooms, a covered outdoor BBQ area and an adjacent open deck. We are impressed that the range and quality of the communal facilities proposed on the review site, can substitute for the type of activities one could reasonably expect to undertake on a private balcony. > > [70] In addition, the review site is in a location which experiences an exceptional level of access to high quality public open space. Albert Park Lake is directly across the road from the review site, while Fawkner Park and the Royal Botanic Gardens are both within a walking distance. Together, these three areas of public open space provide a high quality resource for future residents of the review site. > > [71] For these reasons we find that the extent of private open space proposed to be provided on the review site is acceptable, and will contribute to an appropriate level of internal amenity.
DOES THE PROPOSAL APPROPRIATELY PROVIDE FOR CAR PARKING AND TRAFFIC MOVEMENTS?
Vehicle access should be achieved from laneways or side streets (in that order of preference).
Car parking should be located within a basement or concealed from the public realm.
Development should not provide additional vehicular access from Smith Street.
Vehicle ingress and egress into development, including loading facilities and building servicing, should be designed to ensure a high standard of pedestrian amenity and limit potential conflict between vehicle movements and pedestrian activity.
Because a permit can be granted does not imply that a permit should or will be granted. The responsible authority must decide whether the proposal will produce acceptable outcomes in terms of the decision guidelines of this clause.
Housing affordability
Objective
To facilitate the provision of affordable housing and social housing (public and affordable community housing), including new social housing and upgrades to existing social housing.
Strategies
Support development that includes a provision of affordable housing within its mix of dwellings.
Provide well-designed affordable housing within new development that is integrated with the remainder of the development.
Support development that caters for key workers (employed in the provision of essential services such as in the police, health, emergency or education sectors) within or close to activity centres, health and education precincts.
Objective
Support the provision of new public housing and upgrades to existing social housing (including public housing).
Strategy
Support the development of new and additional social housing, in line with identified needs.
Policy guidelines
Consider as relevant:
(6) The responsible authority must not include in a permit a condition requiring a person to pay an amount for or provide works, services or facilities except -
(a) in accordance with subsection (5), section 46N(1) or 46GV(7); or
(b) a condition that a planning scheme requires to be included as referred to in subsection (1)(a); or
(c) a condition that a determining referral authority requires to be included as referred to in subsection (1)(a).
Integrated decision making
Victorians have various needs and expectations such as land for settlement, protection of the environment, economic wellbeing, various social needs, proper management of resources and infrastructure. Planning aims to meet these needs and expectations by addressing aspects of economic, environmental and social wellbeing affected by land use and development.
The Planning Policy Framework operates together with the remainder of the scheme to deliver integrated decision making. Planning and responsible authorities should endeavour to integrate the range of planning policies relevant to the issues to be determined and balance conflicting objectives in favour of net community benefit and sustainable development for the benefit of present and future generations...
[118] The Respondents submit that they represent the surrounding community, who do not consider that a net community benefit will be achieved. In addition to the community represented by the Respondents, I also need to have regard to those components or generations of the existing community who have not yet been able to break into the Malvern East housing market, as well as future generations of Victorians. It is these later sectors of the community that will benefit most from the provision of increased housing supply in this desirable and highly liveable location. For these reasons I find that the proposed development will achieve a net community benefit, and is worthy of the grant of a planning permit.
To construct a building or construct or carry out works
To construct a building or construct or carry out works
To externally alter a building by structural work, rendering, sandblasting or in any other way
To construct a building or construct or carry out works
To reduce the number of car parking spaces required under Clause 52.06-5
(a) Clearly show the end of trip facilities within the supermarket tenancy, as per AS2890.3 and the City of Yarra Planning Scheme.
(b) Public accessibility to the visitor bicycle area clearly shown, with signage identifying the location of visitor bicycle parking annotated.
(c) The widths of the development vehicle entrance off St David Street dimensioned.
(d) Any changes associated with the provision of heritage interpretation panels or similar devices, as per Condition 4.
(e) Any changes recommended in the amended Sustainable Management Plan (SMP) required by Condition 22 of this planning permit.
(f) Any changes recommended in the amended Acoustic Report required by Condition 41 of this planning permit.
(g) Any changes recommended in the Loading Management Plan required by Condition 38 of this planning permit.
(h) Any changes recommended in the Waste Management Plan required by Condition 24 of this planning permit.
(i) Any changes recommended in the Wind Assessment required by Condition 44 of this planning permit.
(j) A convex mirror placed at the northeast corner of the supermarket car park accessway on St David Street, to provide improved visibility of pedestrians walking east along St David Street.
(k) pedestrian resident access abutting the loading dock on St David Street to be refined to achieve greater visibility from the public realm and to improve the sense of address.
(l) Allocation of external storage for the apartments that do not comply with required storage volume under Clause 58.05-4.
(a) All restoration works detailed within the Wood Bagot VCAT Amended Plans - Architectural Study dated July 2025.
(b) Fully dimensioned and accurately measured plans at a scale of no less than 1:50 prepared by a suitably qualified heritage practitioner/ architect, detailing:
- The proposed reconstruction works to the existing façade including reconstruction of the Ackman's Furniture Warehouse façade at the uppermost level (Level 03) to accurately reflect the parapet and decorative architectural features and reconstruction of the parapet and architectural detailing above the retained Fitzroy Coffee Palace façade.
(c) A written description of the demolition and construction methods to be used.
(a) elevation drawings at a scale of 1:20 illustrating typical podium details, entries and doors, and utilities and typical tower facade details;
(b) section drawings to demonstrate façade systems, including fixing details and joints between materials or changes in form;
(c) information about how the façade will be maintained, including any vegetation; and
(d) coloured drawings outlining colours, materials and finishes.
(a) oversee design and construction of the development; and
(b) ensure the design quality and appearance of the development is realised as shown in the plans endorsed under condition 1 of this planning permit or otherwise to the satisfaction of the Responsible Authority.
Department of Transport and Planning (conditions 10-11)
(a) The retention of the four existing street trees along Gore Street property frontage.
(b) A detailed planting plan(s) for each level of the development showing the location of proposed planting, including plant species and quantities, as well as a legend containing key features, materials, and surfaces.
(c) A planting schedule listing the proposed plant species (botanical and common name), installation size, width x height at maturity, and plant quantities.
(d) Detailed drawings for built elements such as landscaping walls and furniture, including critical dimensions.
(e) On-slab container planter detail drawings demonstrating:
- Minimum soil depth to be provided for each planting type.
- Volume and type of growing media.
- Minimum dimensions of 450mm in width for perimeter planters.
- Wind-resistant mulch is to be used for above ground planted areas.
(f) Typical detail drawings for surface materials such as paver types, gravel treatment, etc.
(g) Additional seating opportunities within the communal courtyard on level 3.
(h) Proposed irrigation including proposed water supply (potable or other), and type of irrigation (pop-ups or drip irrigation).
(i) Proposed maintenance schedule, including task details and frequency.
(j) A specification of works to be undertaken prior to planting.
(a) implementing and complying with the provisions, recommendations and requirements of the endorsed landscape maintenance plan;
(b) not using the areas set aside on the endorsed landscape plan for landscaping for any other purpose; and
(c) replacing any dead, diseased, dying or damaged plants, to the satisfaction of the Responsible Authority
(a) Tree Protection Zones (TPZ) and Structural Root Zones (SRZ) calculated in accordance with the AS4970-2009 Protection of Trees on Development Sites.
(b) The development layout, all built features, including pavement, retaining walls, utilities, and drainage infrastructure.
(c) A Tree Protection Plan (scaled drawing) showing tree protection requirements for retained trees in accordance with the AS4970-2009 Protection of Trees on Development Sites including:
- tree protection fence alignments and dimensions
- areas of ground protection, i.e. where fencing cannot adequately afford tree protection or access across the TPZ is required.
- location of Tree Protection Zone signage
- a notation to refer to the TMP for additional detail
- any exclusions or limitations to the TPP, including a list of any plans not assessed.
(d) A timeline of when the Project Arborist will be on site, including:
- Any demolition along Gore Street
- Any changes to levels or grades including crossovers or pram crossings on Gore Street within the TPZs of retained trees
- regular, planned visits to ensure compliance with the TMP.
(e) Pruning required to Trees 1-4 including marked up photos of canopy proposed to be pruned.
(a) must be provided in a manner, and on terms, to the satisfaction of the Responsible Authority;
(b) may be held by the Responsible Authority until the works are completed to the satisfaction of the Responsible Authority; and
(c) in accordance with the requirements of this permit; or
(d) otherwise to the satisfaction of the Responsible Authority.
(a) all footpath specifications;
(b) all kerb and channel specifications;
(c) all road pavement specifications;
(d) all detailed design plans;
(e) all roading and drainage infrastructure works including soft/hard landscaping;
(f) public lighting details;
(g) the undergrounding of powerlines in St David Street and the reconstruction of the southern footpath of St David Street; and
(h) street trees.
(a) Consistency with Condition 1 plans.
(b) Cooling loads for every dwelling demonstrating a maximum cooling load of 30MJ/m2 has not been exceeded.
(c) Confirmation that the proposal will achieve best practice daylight under BESS or equivalent sustainability rating tool.
(d) Vegetated landscaping calculation to include all vegetated areas across the development, including sheltered or partially covered landscape zones.
(e) A consistent average of at least 7 Stars be stated throughout all documents.
(a) at the permit holder's cost; and
(b) to the satisfaction of the Responsible Authority.
(a) at the permit holder's cost; and
(b) to the satisfaction of the Responsible Authority.
(a) address lighting along Hodgson St between Smith St and Gore St and the entrance to the approved building.
(b) to comply with uniformity, access and maintenance requirements as per standard AS1158.3.1;
(c) to control light spillage in accordance with the requirements of AS 4282 - 2019, "Control of the obtrusive effects of outdoor lighting"; and
(d) to the satisfaction of the Responsible Authority.
(a) at the permit holder's cost; and
(b) to the satisfaction of the Responsible Authority.
(a) at the permit holder's cost; and
(b) to the satisfaction of the Responsible Authority.
(a) at the permit holder's cost; and
(b) to the satisfaction of the Responsible Authority.
(a) Explain that, in the event a second truck enters St David Street when the supermarket loading dock is occupied:
- the second truck should use the on-street holding space to the west on St David Street;
- a spotter is required for the reverse movements when the second truck proceeds to enter the loading dock; and,
- no trucks should enter Hargreaves Street.
(b) Show the location of the on-street holding space to the west on St David Street.
(c) remove the requirement to use Hargreaves Street to exit to the local road network and electronic signage along the corner of Smith Street and St David Street.
(d) Limit supermarket loading hours to:
- Monday - Friday 7:00am - 8:00pm
- Saturday 7:00am - 8:00pm
- Sunday 9:00am - 5:00pm.
(a) Consistency with Condition 1 plans.
(b) Include 109 St David Street in the assessment as a sensitive receiver if this site includes residential usage (with particular regard to noise from the proposed loading dock).
(c) The future assessment of mechanical plant noise and substation be conducted by a suitably qualified acoustic consultant.
(d) Proposed operating hours for the loading dock stated in Section 8.2 of the report.
(e) Correction to show 45dBA predicted at 111 St David Street for the 'general and organic waste truck'.
(f) The maximum source noise levels for the carpark and loading dock doors (e.g. Lmax at 3m) specified.
(g) Noise from the loading dock door included as a contribution in the overall EPA Publication 1826 assessment of noise from the loading dock.
(h) The noise ingress criteria for traffic and trams to be consistent with sections 3.3 and 4.3 respectively of the City of Yarra 'Guidelines- managing noise impacts in urban development' document.
(i) Clarification of whether the traffic and tram noise source levels are based on measurements conducted in March 2017 (as per Section 6.2 of the report) or December 2024 (as per page 38 of the report). If the source levels are based on measurements from 2017, source level measurements should be conducted again.
(j) The references in the first two sentences of Section 12.1 for walls to "ideally" being of certain constructions to either be a formal recommendation or be accompanied by a specification of a minimum Rw or Rw+Ctr that needs to be met.
(k) The communal outdoor areas to be closed between 10 pm to 7 am, or a sleep disturbance assessment be provided in the acoustic report.
(l) Waste collections be limited to the hours recommended in EPA Publication 1254, with the wording "where possible" removed from Section 7.5 of the report.
(a) Provide evidence of compliance with the requirements of the endorsed Acoustic Report.
(a) accurately reflect the plans required by Condition 1 of this Permit; and
(b) include wind tunnel testing demonstrating that acceptable wind levels will result from the development on and off site.
(a) constructed and available for use in accordance with the endorsed plans;
(b) formed to such levels and drained so that they can be used in accordance with the endorsed plans;
(c) treated with an all-weather seal or some other durable surface; and
(d) line-marked or provided with some adequate means of showing the car parking spaces;
(a) at the permit holder's cost; and
(b) to the satisfaction of the Responsible Authority.
(a) a pre-conditions survey (dilapidation report) of the land and all adjacent Council road frontages and nearby road infrastructure;
(b) works necessary to protect road and other infrastructure;
(c) remediation of any damage to road and other infrastructure;
(d) containment of dust, dirt and mud within the land and method and frequency of clean up procedures to prevent the accumulation of dust, dirt and mud outside the land;
(e) facilities for vehicle washing, which must be located on the land;
(f) the location of loading zones, site sheds, materials, cranes and crane/hoisting zones, gantries and any other construction related items or equipment to be located in any street;
(g) site security;
(h) management of any environmental hazards including, but not limited to:
- contaminated soil;
- materials and waste;
- dust;
- stormwater contamination from run-off and wash-waters;
- sediment from the land on roads;
- washing of concrete trucks and other vehicles and machinery; and
- spillage from refuelling cranes and other vehicles and machinery;
(i) the construction program;
(j) preferred arrangements for trucks delivering to the land, including delivery and unloading points and expected duration and frequency;
(k) parking facilities for construction workers;
(l) measures to ensure that all work on the land will be carried out in accordance with the Construction Management Plan;
(m) an outline of requests to occupy public footpaths or roads, or anticipated disruptions to local services;
(n) an emergency contact that is available for 24 hours per day for residents and the Responsible Authority in the event of relevant queries or problems experienced;
(o) the provision of a traffic management plan to comply with provisions of AS 1742.3- 2002 Manual of uniform traffic control devices - Part 3: Traffic control devices for works on roads;
(p) a Noise and Vibration Management Plan showing methods to minimise noise and vibration impacts on nearby properties (including businesses) and to demonstrate compliance with Noise Control Guideline 12 for Construction (Publication 1254) as issued by the Environment Protection Authority in October 2008. The Noise and Vibration Management Plan must be prepared to the satisfaction of the Responsible Authority. In preparing the Noise and Vibration Management Plan, consideration must be given to:
- using lower noise work practice and equipment;
- the suitability of the land for the use of an electric crane;
- silencing all mechanical plant by the best practical means using current technology;
- fitting pneumatic tools with an effective silencer; and
- other relevant considerations (including impacts on the operation of businesses);
(q) a detailed dilapidation report detailing and documenting the existing and post construction conditions of surrounding road infrastructure and adjoining private properties;
(r) if any existing public lighting assets require temporary disconnection, alternative lighting must be provided to maintain adequate lighting levels. A temporary lighting scheme can only be approved by Council and relevant power authority. Existing public lighting could only be disconnected once temporary alternative lighting scheme becomes operational; and
(s) any site-specific requirements.
(a) any stormwater discharged into the stormwater drainage system must be in compliance with Environment Protection Authority guidelines;
(b) stormwater drainage system protection measures must be installed as required to ensure that no solid waste, sediment, sand, soil, clay or stones from the land enters the stormwater drainage system;
(c) vehicle borne material must not accumulate on the roads abutting the land;
(d) the cleaning of machinery and equipment must take place on the land and not on adjacent footpaths or roads; and
(e) all litter (including items such as cement bags, food packaging and plastic strapping) must be disposed of responsibly.
(a) Monday-Friday (excluding public holidays) before 7 am or after 6 pm,;
(b) Saturdays and public holidays (other than ANZAC Day, Christmas Day and Good Friday) before 9 am or after 3 pm; or
(c) Sundays, ANZAC Day, Christmas Day and Good Friday at any time.
(a) The development is not started within three (3) years of the issued date of this permit.
(b) The development is not completed within five (5) years of the issued date of this permit.
(c) The use does not start within two (2) years of completion of the development.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the Responsible Authority for an extension of the periods referred to in this condition.
[1] Section 4(2)(d) of the Victorian Civil and Administrative Tribunal Act 1998 (Vic) states a failure to make a decision is deemed to be a decision to refuse to make the decision.
[2] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] When measured in accordance with the definition of Street wall height as provided in DDO30.
[4] Both of these heights are arrived at from using the parapet heights and the natural ground levels provided on the East West Section on Plan TP-32101.
[5] As measured according to the definition of street wall height set out in DDO30, which in this context, "means the height of the street wall measured by the vertical distance between the footpath at the centre of the frontage and the highest point of the building, parapet, balustrade or eaves at the street edge."
[6] Paragraph 93 of Ms Milner's written evidence statement.
[7] Planning and Urban Context Report (Tract, 8 August 2022).
[8] Paragraphs 117-119 of Ms Milner's written evidence statement.
[9] Taken from page 37 of Ms Milner's evidence statement.
[10] Mr Pagliaro clarified in response to cross examination that 31% of the proposed apartments either had no private open space, or areas less than that required by Standard D20, although we understand that this figure is prior to the changes recommended by Mr Talacko.
[11] A concept explored in the decisions of Knox City Council v Tulcany Pty Ltd [2004] VSC 375 and Rozen & Anor v Macedon Ranges Shire Council & Anor [2010] VSC 583.
[12] A reference to both Clause 71.02-3 of the Yarra Planning Scheme, and s4(1)(g) of the Planning and Environment Act 1987 (Vic).
Perpetual Corporate Trust Limited
Yarra CC [2025] VCAT 948