Section 79 Planning and Environment Act 1987 - Residential 1 zone - neighbourhood character - height - built form - landscaping - private open space - traffic
Mark Westcott & Elizabeth Zweck, James Hay & Stuart Wilson, Trevor & Christine Lloyd, Dr Vicky Priskich, Roland Orchard, Jinfei Chen, Helen Hermann, Ying Zhang & Wen Cheng Wang, Dr Andrew McDonald, Elizabeth Meaden, Bo Lin & Gaofeng Zhou, David & Monica Buckley, John & Lynn Farrington, Haria Bette Zhang
PE & Associates Pty Ltd v Boroondara CC & Ors [2011] VCAT 1717
Mr D Bowden, Town Planner, Daniel Bowden Town Planning Pty Ltd
Mr Westcott in person and on behalf of Elizabeth Zweck
Mr Lloyd in person and on behalf of Christine Lloyd, Jinfei Chen, Elizabeth Meaden, Bo Lin & Gaofeng Zhou, David & Monica Buckley
Construction of a 4 storey building with basement containing 41 dwellings and 45 car parking spaces, reduction in the standard car parking requirement and alteration to access to a Road Zone Category 1
Application under Section 79of the Planning and Environment Act 1987.
Clause 32.01-4 - construct two or more dwellings on a lot
Clause 32.01- 6 construct buildings and construct or carry out works
Clause 36.04 - construct a building or construct or carry out works
Clauses 11, 15, 16, 18, 21, 22, 52.06, 52.34, 52.35, 55 and 65.
The subject site consists of two properties on the south side of Barkers Road approximately 30m east of the intersection of Barkers Road and Higham Road. The site is irregular in shape with a frontage of 42.68m to Barkers Road, a maximum depth of 60.96m and an area of 2,431.8m². The site has a fall of approximately 2.2m from east to west.
The Tribunal inspected the site and surrounds on 18 August 2011
Golden Wings International Pty Ltd v Boroondara CC & Others [2003] VCAT 1768; Grant v Boroondara CC [2005] VCAT 356 (1 March 2005)
The scale and bulk of the proposed building is excessive and would have a dominating impact upon the streetscape and surrounding area.
The design, layout and massing of the proposed building fails to respond to the existing neighbourhood character.
The proposed building envelope setbacks are insufficient and would have a detrimental impact upon the private open space of surrounding dwellings and on the streetscape.
'The land is no better served by existing physical and social infrastructure than most other parts of Melbourne's inner to middle ring suburbs and, importantly, is not within or adjacent to any activity centre or fixed rail transport stop or hub - where the strategic focus for high density redevelopment is greatest'.
With an overall area of over 2,400 square metres, a depth of some 60 metres and a frontage width of over 42 metres to Barkers Road, the site may have more opportunities than constraints, which will obviously facilitate higher density development.
Having said this the urban context within which the site resides will at the end determine the type of development that could be introduced on the site, its potential density, site coverage, building type and height etc. Barkers Road is a major east-west arterial road with a predominately green and leafy character and soft ambience in which built form is always subservient to landscaping and trees, rather than the opposite. The only exception/anomaly in the streetscape, especially in the vicinity of the site is the institutional buildings that form part of the Carey School on the north side of the road, see images below. The presence of these buildings, in particular the four storey Post Modernist (Deconstructivist) style building recently completed means that a degree of flexibility can be accommodated within the streetscape, but to what extent? That is the question.
Do any other matters warrant rejection of the proposal?
Construction of a four (4) storey with basement building containing dwellings, alter access to a Road Zone Category 1 and a reduction of the standard car parking requirements in accordance with the endorsed plans.
(a) All bedroom windows to the uppermost level of the building as depicted on the elevation plans clearly shown on the proposed third floor plan;
(b) A Landscape Plan in accordance with Condition 3 of this permit;
(c) A Tree Management Plan in accordance with Condition 6 of this permit;
(d) An updated Waste Management Plan in accordance with Condition 17 of this permit.
(e) Relocate storage units from the area in front of car parks 16 to 25 to locations in front of car parks 9, 30, 31, 35, 36, 37 and to the sides of car space 10 and Visitor space 1.
(f) Reduce the aisle servicing storage areas 8 to 10 and 30 to 37 from 1800mm to 1200mm in width, aligning the stores with the eastern alignment of car spaces 16 to 25.
(g) Amend the interior hallway and entrance thresholds to units to provide for an indent of 300mm, to create a hall width of 1800mm outside entries to Units 1, 2, 3, 6, 7, 8, 10, 11, 13, 15, 16, 17, 20, 21, 22, 24, 25, 28, 29, 31, 33, 37, 38, 39, 40 and 41. Refer for SK1 for an example.
(h) Screens to balconies to the front of the site to be at a height of 1m.
(c) Quantity and location of shrubs, grasses and vines nominated in the plant schedule;
(d) Minimum mulch depth of 75mm for all garden beds and planters;
(g) Any tree protection measures required by the Tree Management Plan.
(a) The establishment of appropriate foundations within the trees' Tree Protection Zone (TPZ) measurements. The foundation type and method will need to be specified by the arborist in conjunction with engineering specifications;
(b) The mapping of the foundation excavation points on a site plan;
(c) Reporting on the presence of any exposed roots over 50 mm diameter and management of these roots e.g. how they were pruned, fertilisation, watering regime etc;
(d) When supervision of an arborist will be required on-site and time frames specified for supervision;
(e) The establishment of a fixed TPZ and where it will be located in relation to the trees and proposed development. This TPZ should be clearly identified on a site plan and have specific recommendations stipulated on these plans referenced from the Tree Management Plan;
(f) Any remedial pruning works that are required to be performed on the trees before, during and post development of the site. The pruning comments must reference Australian Standards 4373:2007, Pruning of Amenity Trees and a detailed photographic diagram specifying what pruning will occur;
Contractors to be advised of trees to be retained
Regulation of activities in Tree Protection Zone
Driveways and Car Parking areas to be constructed
(b) Formed to such levels and properly drained so that they can be used in accordance with the endorsed plans;
(c) Surfaced with an all weather seal coat {or surfaced with compacted crushed rock or gravel};
(e) Clearly marked to show the direction of traffic along the access lanes and driveways; and
(d) Delivery of bins to waste collection points and retrieval of bins once collected or location of collection points within basement
(a) Hours for construction activity in accordance with any other condition of this permit;
(b) Measures to control noise, dust, water and sediment laden runoff;
(c) The location and design of a vehicle wash down bay for construction vehicles on the site;
(d) The location of parking areas for construction and sub-contractors' vehicles on the site, to ensure that vehicles associated with construction activity cause minimum disruption to surrounding premises and traffic flows. Any basement carpark on the land must be made available for use by sub-contractors/ tradespersons upon completion of such areas, without delay;
(e) Measures to ensure that sub-contractors/tradespersons operating on the site are aware of the contents of the Construction Management Plan;
(f) Contact details of key construction site staff;
(g) The location of any site sheds and the like; and
20 An Environmental Management Plan must be prepared to the satisfaction of the Responsible Authority. Once satisfactory, such plan will be endorsed and must be implemented to the satisfaction of the Responsible Authority. The plan must include:
21. The submission of a report to Council upon completion of the project, that documents the implementation of sustainability initiatives included in the ESD Management Plan, and which demonstrate how a Green Star, 4 Star benchmark, using Multi-Residential v1 rating tool was achieved.
(a) The development does not start within two (2) years of the issue date of this Permit; or
(b) The development is not completed within four (4) years of the issue date of this Permit.
The Responsible Authority may extend the times referred to if a request is made in writing before the Permit expires or within the three (3) months afterwards.
[1] I have considered all submissions presented by the parties although I do not recite all of the contents in these reasons.
[3] Grant v Boroondara CC [2005] VCAT 356 (1 March 2005) at [25]
PE & Associates Pty Ltd
Boroondara CC & Ors [2011] VCAT 1717