[2026] VCAT 110
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2026-02-18
Original judgment source is linked above.
(a) in section 16(1), that if there is a flow of water from 1013 onto 913 which is not reasonable and which causes damage to 913 or economic loss, the person who caused the flow is liable to pay damages; and
(b) in section 16(5), that if the causing of the flow was given rise to by works constructed or any other act or omission on 1013, the current occupier is liable to pay damages if the current occupier has failed to take any steps reasonably available to prevent the causing of the flow.
(a) the respondent caused the flow for the purposes of section 16(1). She does not assert that the respondent's tenant caused the flow, for example by damaging the shower or blocking its drainage causing it to overflow, and she does not allege that the tenant's use of the shower for its intended purpose of washing 'caused the flow' within the meaning of this section. She says that the respondent caused the flow by failing or refusing to properly repair the shower in 1013; and
(b) if section 16(5) applied because the flow was given rise to by works constructed or any other act or omission on 1013 - such as defective building work when the apartment building was constructed - the respondent is properly to be regarded as 'the current occupier' of 1013 because he is the owner and landlord, and has failed to take the reasonable and appropriate step of repairing 1013 and stopping the leak. Implied in this aspect of the applicant's case, is that the tenant is not legally entitled to repair the shower, as it is the respondent's property.
(a) water ingress into 913 in 2017 did not come from 1013, but came from a common sewer service duct which was common property vested in the Owners Corporation affecting the apartment building, as established by J & C Maloney Plumbers & Gasfitters in a report dated 24 April 2017.
(b) the apartment building was still under builder's warranty in 2017. The builder, Hickory, denied any responsibility. In April 2017 the respondent engaged Pro-Sealed Pty Ltd to conduct a standard epoxy shower service, and was prepared to engage Nifty Maintenance Pty Ltd to repair the bathroom ceiling of 913, but the applicant would not permit that repair to be done.
(c) a contractor engaged by the applicant in October 2022, Trojan Plumbing, did not report any water ingress into 913 from 1013, using the words 'all appears dry' in its report dated 1 November 2022. Trojan Plumbing also recommended that the applicant install a snap vent in the ceiling of 913's bathroom, for additional ventilation.
(d) without admission, when a leak detection report made on 1 November 2024 by The Leak Detector suggested that it was possible that water was seeping into 913 from 1013, the respondent engaged a contractor to undertake rectification work. Although it was not proven in November 2024 that 1013 was the source of water entering 913, this work ended the seepage and so ended any liability which the respondent may have had.
(e) the author of this report of November 2024 wrote that there was 'clearly ... no leak from 1013' and that the leak was 'probably coming from common area'.
(f) without admission, the respondent engaged Megasealed to perform shower rejuvenation, which was completed by 7 February 2025 and tested to be effective. The applicant deferred the repair of 913. This was her choice and not a necessity.
(g) on 21 March 2025 the respondent engaged Titan Plumbing to carry out a thermal test, to check the effectiveness of the Megasealed rejuvenation, and it reported that it had been effective. The respondent also engaged Mould Clean Australia to perform mould treatment on 913.
(h) on 19 May 2025 the applicant emailed the respondent advising that water was leaking. The respondent and his real estate agent inspected 913 and saw no leaking or trace of water. The applicant showed the respondent a video which she said had been taken on 12 May 2025. She said this showed intermittent leaking. The applicant would not allow Megasealed to inspect 913. This disadvantaged the respondent, because he could have made a claim on Megasealed under its warranty, if he obtained evidence of a leak in such an inspection. Megasealed reported that its work was still effective, but recommended that additional work be carried out on 1013.
(i) on 4 June 2025 the applicant took initial steps to join the Owners Corporation as a party to this proceeding. This caused the scheduled final hearing, which was to take place on 7 July 2025, to be adjourned to 2026. The applicant then advised that she did not seek to join the Owners Corporation.
(j) the applicant sent an email to Megasealed which caused it to 'quit'. The respondent then engaged Seal-A-Gap to carry out the further works which Megasealed had recommended. Seal-A-Gap completed that work by 15 October 2025. It issued a certificate of compliance to the effect that its works were carried out by certified, registered specialist tradespersons; that its work was supported by a five year warranty; and that its work complied with Australian Standard AS3740 - Waterproofing of Domestic Wet Areas. The respondent says the applicant has not produced any evidence contradicting Seal-A-Gap's certification or demonstrating that there have been any leaks since 15 October 2025.
(k) the respondent says that the applicant seeks to require the respondent to rectify the puddle flange[1] in the bathroom of 1013. The respondent says that because the respondent's title to 1013 only extends to the internal face of the building, the puddle flange lies outside his title and is not his responsibility.
(l) the respondent says that the applicant has not proven any connection between mould in the bathroom of 913, and his apartment 1013, and nor has the applicant proven that she installed additional ventilation in 913 as had been recommended by Trojan Plumbing on 1 November 2022.
(m) the respondent says that the applicant has sought an order that the respondent treat or repair the steel framing in 913, that lies beneath the concrete slab that serves as the floor of 1013 and the roof of 913, but that she has not produced any expert evidence in support of that claim or even evidence that the steel framing has been damaged.
(n) the respondent says that the applicant has sought an order that the respondent replace the plasterboard ceiling in the bathroom of 913, but that by 30 September 2024 when the applicant alleged there was a leak into that bathroom, its ceiling had been removed. The respondent also believes, on the basis of a comment made by the applicant, that a temporary cardboard panel had been installed in 2022, in lieu of replacing the ceiling.
(o) the respondent says that the applicant's claim for damages of $6,380.00 based on a quotation from Ultimate Work Solutions ('UWS') includes the cost of painting the bathroom wall and door which are unrelated to any water damage, and that the applicant herself has described a previous quote by UWS as excessive.
(p) the respondent says that the applicant's claim for damages for loss of rent should be dismissed because she has never leased out 913.
(a) IMG_6990. This is a video of around 20 seconds' duration. Imbedded in it is data that it was filmed at 10:00am on 12 May 2025. The camera has been pointed at the roof of the bathroom in 913 because the ceiling has been removed, and the video shows the bottom of the concrete slab which is the floor of 1013 and the roof of 913. Some of the slab is dry and white, but a few centimetres around a PVC pipe through which water from the shower in 1013 discharges is grey which I am satisfied shows that it is wet. Water is dripping through that grey area of concrete.
(b) d552b55da7344d77af9d6f7df19a7e60. Text is displayed on this video, which is of 7 seconds' duration, saying that it was filmed on 7 July 2025 and that it shows 'continual water ingress from ...1013'. The camera has been pointed up at the same PVC pipe as in IMG_6990, and the video shows water dripping at a rate of more than one drop per second from the bottom of the PVC pipe. I conclude from my close observation of this video that this is not showing a crack in the pipe, but rather is showing water running around the outside of the pipe to the lowest point of the pipe, and then falling off due to the forces of water pressure and gravity.[4]
(c) af58f72b1a454641b1fee2a14c7ef01b. Text is displayed on this video, which is of 7 seconds' duration, saying that it was filmed at 9:15am on 13 July 2025 and that it shows 'yellow dye test by registered plumber'. The camera has been pointed at a shelf - which is shaped like an oval dish - inside 913's shower recess, which holds a bottle of lotion and a cup containing toothbrushes. Sitting at the bottom of this shelf is bright yellow fluid. The camera then pans up to the same PVC pipe which is shown in the two videos above, and the video shows yellow water dripping at a rate of more than one drop per second from the bottom of the pipe onto the shelf.
These drains are cut to size on-site by the tilers and installed as part of tiling works. End stop must be sealed and drain hole location cut to suit the connection point to drain in the building which can vary through these [apartment] complexes. The outlet then installed and sealed to underside of the drain ... set into place to the sewer pipe connection point puddle flange.
[1] A 'puddle flange', formally known as a 'leak control flange', is part of the waterproofing system for showers in buildings. The membrane is a protective layer which lies underneath and behind floor and wall tiles. Silicone and shower screens guide water toward the floor waste. Leak control flanges provide the crucial path for subsurface drainage. They ensure a secure connection between waterproofing membranes and drainage systems. They are required by Australian Standard AS 3740-2021 (Waterproofing of wet areas within residential buildings).
[2] The applicant ... They withdrew on 5 August 2025 Elamine Lawyers.
[3] Examples of how these documents have been 'indexed' in folders include: 'A1 supporting docs'; 'A1 docs for hearing'; 'A1 correspondence... video in support (x2 att - across two emails)'; 'appendix'; 'supporting documents'; 'further supporting documents (x19 att)'; and 'supporting photos to be relied on (x17 att)'.
[4] Another video, called IMG-7182, of 12 seconds duration is undated and seems to just be another view of the same thing. Another video called IMG-7181, again of 12 seconds and dated 28 May 2025, shows the same PVC pipe, dripping water. Two other videos called IMG-7220 and IMG_7228, of 12 seconds and 8 seconds respectively, both dated 21 May 2025, shows the same PVC pipe but the picture quality is insufficient to show whether or not water is dripping from the pipe.
[5] The applicant had said in an email that 'Annexure J' was a quote for $7,500.00. There is no Annexure J. The Tribunal's registry had written to the applicant in relation to the need for the applicant to file relevant documents, and the Tribunal had made directions under section 80 of the Victorian Civil and Administrative Tribunal Act 1998 (Vic) requiring the discovery of documents. The UWS quote is the best evidence of the cost of repairing 913.
Patrick
Yin [2026] VCAT 110