If the owner(s) of No. 10 Shellbank Parade, Cremorne seeks the shared issues of the facility, the owner is to grant a right of way across the property but only to the minimum extent necessary to provide direct access to the private landing facility from No. 10 Shellbank Parade.
32 Ms Jago submits that the applicable planning controls place significant and consistent emphases on the requirement that water-based facilities be shared. She cites cl 18(f) of REP 23, cl 4.2 of the DCP, cll 4.2 and 15 of the draft REP and the Boat Storage Policy for Sydney Harbour as supporting this submission. The facility is located entirely in front of 12 Shellbank Parade although abutting and in part encroaching over the division of waterway. It will therefore be necessary for the neighbouring property owner to walk over private land to gain access to the shared facility. The proposed condition aims to ensure that when sharing is desired there is no physical impairment to sharing, such as a fence and acting neighbour is legally allowed, by the establishment of a right-of-way or similar to reach the facility. Any such illegal access needs only extend to a small area immediately adjacent to the facility.