Park Breeze Luxury Apartments [2025] QBCCMCmr 396
The Body Corporate for Park Breeze Luxury Apartments (respondent)
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227and 229(3)(a)
Body Corporate and Community Management (Accommodation Module) Regulation 2020 (Accommodation Module)
REASONABLENESS - where applicant argues that failure by the body corporate to approve installation of LED downlights was unreasonable - whether the body corporate failed to act reasonably when refusing permission for the applicant to install ceiling downlights
Accommodation Module, s 177
I hereby order that the Body Corporate for Park Breeze Luxury Apartments CTS 29235 is deemed to have approved the request by the owner of Lot 79 to install ducting through their ceiling area to service their bathroom exhaust fan.
I further order that the Body Corporate for Park Breeze Luxury Apartments CTS 29235 is deemed to have approved the request by the owner of Lot 79 to install recessed LED Downlights in their ceilings subject to the following conditions:
1. The Committee's decision refusing the LED downlights and the redirection of the toilet exhaust fan ducting be set aside.
2. Retrospective approval be granted for the completed LED downlights.
3. Approval be granted for the proposed redirection of the toilet exhaust fan ducting.
1. New ducting for an exhaust fan was observed with an outlet installed in the balcony ceiling.
2. Downlights had been recessed into the plaster board ceiling but had no coverings and these downlights were not "fire rated".
3. Numerous cable penetrations were present and had not been fire sealed with fire-rated products such as caulking or expanding foam.
115O Easements in favour of lots for utility services and utility infrastructure
(1) An easement exists in favour of a lot and against other lots and common property for supplying utility services to the lot and establishing and maintaining utility infrastructure reasonably necessary for supplying the utility services.
(2) However, the exercise of rights under the easement must not interfere unreasonably with the use or enjoyment of the lot or part of common property against which the easement lies.
(1) Rights under a statutory easement must not be exercised in a way that unreasonably prevents or interferes with the use and enjoyment of a lot or common property.
(2) If a statutory easement entitles a lot owner to enter another lot or common property to carry out work, the owner -
(i) to the other lot's owner, and additionally, if the owner is not the occupier, the other lot's occupier, before entering the lot to carry out work; or
(ii) to the body corporate, before entering the common property to carry out work; and
(b) must comply with the security or other arrangements or requirements ordinarily applying for persons entering the lot or the common property.
(3) If a statutory easement entitles the body corporate to enter a lot to carry out work, the body corporate must give reasonable written notice to the lot owner before entering the lot to carry out work.
(4) Subsections (2) and (3) do not apply if the need for the work to be carried out is, or is in the nature of, an emergency.
(1) An adjudicator may make an order that is just and equitable in the circumstances (including a declaratory order) to resolve a dispute, in the context of a community titles scheme, about-
(a) a claimed or anticipated contravention of the Act or the community management statement; or
(b) the exercise of rights or powers, or the performance of duties, under the Act or the community management statement; or
(c) a claimed or anticipated contractual matter about-
(i) the engagement of a person as a body corporate manager or service contractor for a community titles scheme; or
(ii) the authorization of a person as a letting agent for a community titles scheme.
(2) An order may require a person to act, or prohibit a person from acting, in a way stated in the order.
(3) Without limiting subsections (1) and (2), the adjudicator may make an order mentioned in Schedule 5.
17. If satisfied the body corporate's decision about a proposal by the owner of a lot to make improvements on or changes to common property is an unreasonable decision - an order requiring the body corporate -
fire-rated products such as caulking or expanding foam to fill penetrations.[12]
[1] See report from Immix Electrical dated 19 June 2025
[2] This is despite the fact that there was an existing fan in lot 79
[4] The Atrium Resort [2016] QBCCMCmr 164
[5] Body Corporate For Beaches Surfers Paradise v Backshall [2016] QCATA 177 at para 99
[6] Riverside Hamilton [2020] QBCCMCmr 13 at para 49; Noosa Shores [2023] QBCCMCmr 382 at para 23
[7] Seacrest [2016] QBCCMCmr 28; Melaleuca Park [2018] QBCCMCmr 87
[8] Seacrest [2016] QBCCMCmr 28 at para 37; The Atrium Resort [2016] QBCCMCmr 164 at para 38
[9] Such as the Electrical Safety Regulation 2013 and any Australian Standard, or AS/NZ Standard mandated by the Regulation, and any applicable provision of the National Construction Code.
[10] Including (1) the Electrical Safety Regulation 2013 and any Australian Standard, or AS/NZ Standard mandated by the Regulation, and (2) any applicable provision of the National Construction Code.
[11] Fire-rated downlights are designed to maintain fire resistance of the ceiling into which they are recessed (see AS/NZS 3000 Clause 7.5.2.3 & NCC Vol 1: Specification C3.15 Penetration of Walls, Floors and Ceilings by Services).