To provide housing at increased densities in buildings up to and including four storey buildings.
To encourage a diversity of housing types in locations offering good access to services and transport including activity centres and town centres.
To encourage a scale of development that provides a transition between areas of more intensive use and development and other residential areas.
To facilitate housing growth in the form of apartment developments of a high quality design and finish.
The provision of private open space in the frontage for an apartment is a common occurrence and allows for the efficient use of the site in a RGZ3;
THE REDUCTION IN THE NUMBER OF CAR PARKING SPACES TO BE PROVIDED IS ACCEPTABLE
Construct two or more dwellings on a lot in the Residential Growth Zone - Schedule 3.
Construct a front fence within 3 metres of a street where:
Reduce the number of car parking spaces required under Clause 52.06-5.
(a) the bedroom windows of apartments 1.01 and 1.03 to be screened in accordance with standard B2 of clause 55 (as it existed in the Monash Planning Scheme immediately prior to the approval date of Amendment VC267);
(b) any changes required by the Waste Management Plan in accordance with condition 14;
(c) any changes required by the Sustainable Design Assessment report, in accordance with condition 16;
(d) the metal cladding on the upper level to be a non-reflective material or similar to the satisfaction of the responsible authority; and
(e) details of the pedestrian gate within the southern side setback area.
(a) a trench grate (minimum internal width of 150 mm) located within the property boundary and not the back of footpath; and/or
(b) shaping the internal driveway so that stormwater is collected in grated pits within the property; and/or
(c) another Council approved equivalent.
(a) the method and location of collection of all waste from the land;
(b) waste volume calculation and total waste generated per waste stream;
(c) frequency of waste collection and permitted collection times;
(d) plans showing the location of bin storage areas, required bin storage equipment and features, number of bins and location of temporary bin storage at collection point(s);
(e) provision of bin cleaning equipment, washing facilities and sewer disposal within the waste storage area;
(f) the type and size of private waste vehicles (if the waste collection service is to be undertaken by a private company);
(g) details of who will be responsible for taking out and returning bins to the collection point (if collection is proposed to be undertaken from the street).
(a) The development has not started before two (2) years from the date of issue.
(b) The development is not completed before four (4) years from the date of issue.
[1] The submissions of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] For example, clause 16.01 Residential development
Papermite Pty Ltd
Monash CC [2025] VCAT 1110