[2026] VCAT 36
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2026-01-27
Original judgment source is linked above.
For the reasons expressed above, we are satisfied the proposal will provide an acceptable planning response to its heritage planning policy context.
Does the proposal provide an acceptable planning response to demolition in the HO803?
All significant elements of the building identified as being of aesthetic significance, including the components which contribute to the Georgian revival style and the company name to the parapet, are to be retained and will remain evident in the building form.[11]
Council therefore submits the 1941 rear addition is not a 'critical element' to 'understand' and 'read' the significance of the heritage place.
The retention of the exterior face/faces of a building without the three-dimensional built form providing for its/their structural support and understanding of its function.[12]
a. The extent (at 26m deep) of heritage fabric retention which comprises the 1926 original building notwithstanding the roof form is to be removed;
b. The appropriateness of the overall height of the additions (remarkably reduced relative to decision plans);
c. The appropriateness of the contemporary extension sitting atop and to the rear of the Heritage Building;
d. The proposed conservation and restoration of/to original details, including the façade sign;
e. The flow on benefits of activation in, across and around the Subject Land, particularly to the immediate laneway interfaces.
The rear 1940s addition is not identified in the statement of significance as an element of significance, although it is acknowledged that the addition forms part of the overall existing building and provides evidence of the evolution of the site.
...
The 1940s addition is of utilitarian form and design, broadly consistent with the side elevations of the original building, but does not exhibit the characteristics of the Georgian Revival style.
Is the proposed new building an appropriate response to the HO803 and associated heritage policy?
To construct a building or construct or carry out works.
To construct a building or construct or carry out works.
To externally alter a building by structural work, rendering, sandblasting or in any other way.
To construct a building or construct or carry out works.
To construct a building or to construct or carry out works.
(a) A notation on the plans confirming that all service doors to Bouverie Place do not project beyond the building line by more than 100mm when in the fully open position.
(b) Any Level 4 outdoor terrace screens or barriers required to address wind comfort criteria designed and located to minimise adverse impacts on the heritage value of the host building.
(c) Rearrangement for improved functionality of the study/robe/eating areas of the following Room Types:
- Type 04.
- Type 11.
(d) No encroachment of ground level canopies over the Alma Place title boundary.
(e) All external window openings to be retained within the existing building shown on Section drawings to demonstrate that no new internal floors or ceilings within the existing building intersect with the windows.
(f) Material and finish of the Level 4 wind screen.
(g) On an updated proposed ground floor plan, all existing ground level windows, pedestrian doors and vehicle accessways at 16-32 Leicester Street with an interface to Alma Place and Bouverie Place.
(h) Any changes in accordance with the corresponding Environmentally Sustainable Design condition.
(i) Any changes in accordance with the corresponding Landscape Scheme condition.
(j) Any changes in accordance with the corresponding Waste Management Plan condition.
(k) Any changes in accordance with the corresponding Wind Report condition.
(l) Any changes in accordance with the corresponding Conservation Works Plan condition.
(m) Any changes in accordance with the corresponding Melbourne Water conditions.
These amended plans and updated development summary must be to the satisfaction of the responsible authority and when approved shall be the endorsed plans of this permit.
Environmentally Sustainable Design (ESD) Statement
(a) MUSIC modelling to demonstrate 40% annual flow reduction as per Green Star Buildings v1 Credit 39 requirement.
(b) Clarification on rainwater tank connection to WCs, demand volume calculation and catchment area.
(c) Details of the Green Star Accredited Professional (individual) who has been engaged and evidence that a GSAP will be engaged for the life of the project.
(d) Airtightness review and a proposed airtightness target.
(e) Daylight, view and glare control narrative against the five requirements for the Credit 11 Minimum Expectation.
(f) An indicative whole of building daylight calculation (based on inferred performance or otherwise) to support the claim that 'the daylight amenity is considered to be acceptable'.
(g) A project-specific pre-screening climate change checklist and climate change risk and adaptation assessment for the development.
(h) A site plan showing materials that reduce urban heat and demonstrate Credit 19 Heat Resilience can be achieved.
(i) Details on how building's upfront carbon emissions can achieve at least 20% lower than those of a reference building.
(j) Provide a pathway (ideally modelling) demonstrating how the 20% saving in energy use will be achieved.
(k) Updated energy modelling that accounts for thermal bridging in the building fabric and includes the thermal performance of floors and roofs.
(l) Indicate tank size and re-uses, and proprietary devices on town planning drawings.
(m) Any other changes as a consequence to the requirements of Condition 1.
Implementation of Environmentally Sustainable Design (ESD)
(a) Detailed planter sections including soil volumes, support structures, diverse schedule of species including indicative planting locations with specific consideration given to tree species / placement / soil volume requirements and specified lightweight growing media.
(b) Indicative planting locations to consider planter widths to ensure the volume of soil can accommodate root volume of planting.
(c) Planter depths for all planters, with trees to be no less than 1m with a minimum soil volume of 28 cubic metres.
(d) Consideration of further greening added to the Level 4 outdoor area, along with consideration of more shade trees and understory plantings around seated areas.
(e) An irrigation system demonstrating the use of non-potable water sources (rainwater, storm water and recycled water).
(f) A Green Factor score card submitted along with the landscape plan.
(g) A Landscape Maintenance Plan providing comprehensive details of proposed maintenance regimes with provision for maintenance beyond the fifty two week period following Practical Completion.
(h) Any other changes as a consequence to the requirements of Condition 1.
Except with the prior written consent of the responsible authority the approved landscaping must be implemented prior to the occupation of the development. The landscaped area(s) must be maintained to the satisfaction of the responsible authority.
(a) The provision of a fixed structure to the enclosure around the chute termination points and linear track system to prevent access to unintended users (use of a curtain is unsuitable).
(b) Modification of the waste storage area, including an increase to the overall size as necessary, so that a bin of each type is immediately accessible to the user.
(c) Updated architectural plans attached to the WMP.
(d) Any other changes as a consequence to the requirements of Condition 1.
Waste storage and collection arrangements must not be altered without prior consent of the Melbourne City Council - Waste and Recycling.
Private Tactile Ground Surface Indicator (TGSI) not within the Road Reserve
Existing Street Lighting not to be Altered without Approval
Noise to Comply with Noise Limit and Assessment Protocol 1826.4
(a) Retention and preservation of the 'Modern Printing Works' lettering to the parapet of the Bouverie Street elevation.
(b) Replicated form, portions and detail of the existing metal framed windows if being replaced for the purposes of providing compliance with the National Construction Code.
(c) Documented conditions of the retained sections of the building to aid in their preservation throughout the construction of the development.
The recommendations contained within this report must be implemented at no cost to the City of Melbourne and be to the satisfaction of the responsible authority.
All works must then be carried out in accordance with the endorsed structural documentation to ensure the ongoing stability and support of the existing structures.
(a) public safety, amenity and site security.
(b) operating hours, noise and vibration controls.
(c) air and dust management.
(d) stormwater and sediment control.
(e) waste and materials reuse.
(f) traffic management.
(g) an Arboricultural Impact Assessment (AIA) and Tree Protection Plan (TPP). The AIA-TPP must identify all impacts to public trees, be in accordance with AS 4970-2009 (Protection of tress on development sites), AS4373-2007 (Pruning of Amenity Trees), and be authored by a qualified consulting arborist (min. AQF Level 5), including, but not limited to:
- A public tree location plan drawn to scale including proposed/approved building design, construction zones, site access, machinery, equipment, and temporary structures required to enable demolition, excavation, and construction, where these works are to impact public tree(s).
- City of Melbourne asset numbers for the public trees to be impacted (found at http://melbourneurbanforestvisual.com.au).
- The general condition and specific data of each public tree presented concisely with the assistance of tables and photos.
- A written assessment of all public trees located adjoining property, detailing any construction impact the proposal will have on these trees.
- Reference finalised Construction and Traffic Management Plan, including designs, details, and dimensions of any public protection gantries, loading zones and machinery locations.
- Site specific details of the temporary tree protection fencing or hoarding to be used to isolate public trees from the demolition and construction activities. Details of any other tree protection measures considered necessary and appropriate to the works.
- Specific details of any design modifications or construction methodologies to be used within the Tree Protection Zone of any public trees. These must be provided for any utility connections or civil engineering works.
- Any pruning required to public trees must include detailed specifications with reference to marked images.
- A supervision schedule for the Project Arborist, interim reporting periods and final completion report (necessary for bond release).
(a) natural surface levels and floor levels to Australian Height Datum (AHD);
(b) the Finished Floor Level (FFL) of ground floor fire stair area with basement and external access, must be set no lower than 21.03 metres to AHD (with the exception of any transitional areas containing landings, steps or ramps to the satisfaction of Melbourne Water.
(a) Bike Room, Common laundry and Communal area (west of lifts): 21.4 to AHD.
(b) Communal area (east of lifts) and Lift Lobby: 21.3 metres AHD.
(c) Lounge and entrance corridor: 21.1 metres AHD.
(d) Ground floor fire stair with basement and external access: 21.03 metres AHD.
(a) The accommodation provided on the land is to be used for the exclusive accommodation of students enrolled full time at a secondary or tertiary level educational institution and to be vacated within three months of completion of full time studies.
(b) The building to operate at all times in accordance with the SMP as required by Condition 39 of this permit to the satisfaction of the responsible authority. The SMP must establish a set of 'house rules' for the use, to be followed thereafter, to the satisfaction of the responsible authority. The plan must ensure that a suitably qualified full time manager with responsibility to oversee student behaviour permanently resides on the site and must detail the maintenance, cleaning, garbage storage and collection, supervision and security of the site.
(c) The requirements contained in the agreement shall form part of any lease of the premises which the owner of the land under this permit may enter into with another party.
The owner of the land must pay all of the Melbourne City Council's reasonable legal costs and expenses of this agreement, including preparation, execution and registration on title.
(a) The development is not started within three years of the date of this permit.
(b) The development is not completed within five years of the date of this permit.
The responsible authority may extend the permit if a request is made in writing before the permit expires, or within six months afterwards. The responsible authority may extend the time for completion of the permit if a request is made in writing within 12 months after the permit expires and the development started lawfully before the permit expired.
[1] Substituted plans removed the proposed retail/commercial space at ground floor in the revised floor layout.
[2] A permit is not triggered for the proposal under the PO1.
[3] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[4] Tribunal Order dated 17 October 2025, order 7.
[5] Source: City North Heritage Review 2013: Statements of Significance.
[6] See page 95 of 113 of the City North Heritage Review - Carlton (Vol 2). We note the historic heritage grading system has since been updated by Amendment C258 to the Scheme.
[7] See paragraph [14], Evidence Statement, Katherine White, Lovell Chen.
[8] Paragraph [34], Evidence Statement, Katherine White, Lovell Chen.
[9] This is supported by White in her Written Evidence Statement, paragraph [59],
[10] See pages [13], [23] and [28] of the Heritage Design Guide 2023.
[11] Paragraphs [53] and [55] of Katherine White's Written Evidence Statement.
[12] Page 4 of 250 in the Heritage Places Inventory, March 2022 (amended August 2025).
[13] Figure 10 of the Heritage Design Guide 2023.
[14] Clause 15.03-1L-02 also includes a similar strategy for new buildings in the Capital City Zone that seeks to position new development in line with the prevailing building line in the street.
Panorama Investment Corporation Pty Ltd