[2025] VCAT 830
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-09-17
Original judgment source is linked above.
Domestic Building: Owners Corporation and individual lot owners pursue domestic builder in respect of defects in an apartment building constructed for a developer in Malvern East, Victoria; numerous defects were alleged but the respondent contended that some defects had arisen as a result of work carried out by others after the termination of the building contract made between the respondent and the developer; the respondent also contended that some defects alleged were not defects at all, and that some defects, which were conceded, were technical in nature which did not justify an award of damages; discussion of relevant authorities including ; ; CLR 272 and ; claims for a number of defects not pressed at hearing; damages in respect of defects assessed at $119,562.39; applicants' claim for interest to be determined at a further hearing; applicants granted leave to apply for costs and reimbursement of fees; respondent also granted leave to apply for costs and reimbursement of fees.
Owners Corporation PS801173C and Ors as per Schedule
Owners Corporation PS801173C v Devakon Pty Ltd (Building and Property) [2025] VCAT 830
Ms G Nip of Counsel, instructed by Ms L Moseby, solicitor
Mr A Blunt of Counsel, instructed by Mr D Ivers, solicitor
Shaun Koob (Owner of Lot 1 on Plan of Subdivision PS801173C)
Rana Brogan (Owner on Lot 2 on Plan of Subdivision PS801173C)
Kathryn Hines (Owner of Lot 3 on Plan of Subdivision PS801173C)
Annette Newton (Owner of Lot 4 on Plan of Subdivision PS801173C)
Quang Trung Ly and Yazmin Binti Johari Halim Shah (Owners of Lot 5 on Plan of Subdivision PS801173C)
Liam Riordan (Owner of Lot 6 on Plan of Subdivision PS801173C)
Lucy Tissot (Owner of Lot 7 on Plan of Subdivision PS801173C)
Aaron Robins and Paula Robins (Owners of Lot 8 on Plan of Subdivision PS801173C)
Jemima Doris Isaac (Owner of Lot 9 on Plan of Subdivision PS801173C)
Peter Paul Stricker (Owner of Lot 10 on Plan of Subdivision PS801173C)
THE UNDERLYING DISPUTE BETWEEN THE BUILDER AND THE DEVELOPER
AUTHORITIES RELEVANT TO THE ASSESSMENT OF DAMAGES
The rule of the common law is, that where a party sustains a loss by reason of a breach of contract, he is, so far as money can do it, to be placed in the same situation, with respect to damages, as if the contract had been performed.
The Bellgrove qualification that rectification must be a 'reasonable course' to adopt is calculated to control the level of damages and to address those cases in which the prima facie rule produces a result which is manifestly unjust. It is not limited to the question of mitigation in the sense of awarding damages for that method of rectification which best mitigates the loss. It is a qualification which allows the selection, in special circumstances, of an alternative measure of damages. The qualification reflects two methods often employed by the common law. First, in recognition that a sound general rule may nonetheless still work an injustice in a particular case, it qualifies the general rule with a proviso. Secondly, it translates what is, at base, a determination of legal policy into a quasi-factual question by engaging the reasonableness standard. The reasonableness of rectification is not determined by an entirely factual enquiry. The test of reasonableness is only quasi-factual and imports a normative standard.[14]
Rectification damages are awarded for a breach of a building contract unless there is good reason to adopt another measure because the award of rectification damages would be manifestly disproportionate to the attaining of the contractual benefit. That rule entrenches rectification costs as the primary measure of damages and emphasises the exceptional nature of any lesser award. In determining whether good reason exists, the authorities suggest that the following are relevant considerations:
(1) the degree of departure from the contractual stipulation;
(2) the adverse effect of the departure on the functional utility, amenity and aesthetic appearance of the building;
(3) the reasons, objectively ascertained and commonly known, for which the innocent party made the stipulation which was breached;
(4) the practical feasibility of rectifying the work, including the effects on third parties of attempting to do so;
(5) whether or not the innocent party intends to carry out the rectification work;
(6) the absolute cost of the rectification work and the disproportion between that cost and
(7) the nature of the wrongdoer's fault for the defect; and
(8) the public interest in reducing economic waste.
In determining what is reasonable, the issue is one to be determined objectively, there being no suggestion that the plaintiff should be the arbiter of his or her reasonableness. However, the determination must take place in the context of the relevant contract, and hence by reference to the plaintiff's needs and desires reflected in the bargain he or she struck.
(a) the proper identification of the claimant's performance interest, that is to say, the benefit bargained for;
(b) a consideration of the extent to which the defendant has, despite departure from the contractual standard, nevertheless achieved the contractual objective, and hence provided the plaintiff with the benefit he or she bargained for;
(c) any lack of proportionality between the proposed work and cost, and the benefit to be achieved by the plaintiff through this work;
(d) the plaintiff's intention and ability to carry out the rectification work, although he noted that these considerations are not usually decisively relevant in their own right;
(e) it may be that in cases where the defendant's breach is intentional, or profit driven, that the Court may be more reluctant to deprive the plaintiff of rectification damages designed to protect his or her performance interest.
(a) basement water ingress (Item 1);
(b) basement surface drainage (Item 2);
(c) fire service leak (Item 3);
(d) rendering (Item 6);
(e) fire doors (Item 10);
(f) fire pump (Item 11);
(g) entry/ground floor apartment tiled area (Item 12);
(h) omission of upturns (Item 13);
(i) omission of sealing to penetrations (Item 14);
(j) insufficient fall of tiling (Item 15);
(k) gaps to grout (Item 16);
(l) omission of nosing (Item 17);
(m) insufficient fall of flashing around penetrations (Item 18);
(n) box gutter change of directions (Item 19);
(o) insufficient fall of box gutter (Item 20);
(p) insufficient fall of capping flashing (Item 21);
(q) insufficient fixing of capping flashing (Item 22);
(r) insufficient fixing of flashing laps (Item 23); and
(s) water discharge point (Item 24)
THE CLAIM THAT WATER WAS LEAKING INTO THE BASEMENT.
In any hearing involving experts, it is essential for each expert to be cross-examined as to the opposing expert's opinions so that the Tribunal has the benefit of the opposing and tested opinions on which to make the decision. [26]
DEFECT 2 - THE FAILURE OF THE BUILDER TO CREATE A SPOON DRAIN IN THE BASIN
DEFECTS 4 (DEFECT IN PAINTING AND PLASTERING) AND 5 (BUILDER'S CLEAN)
DEFECT 7 (FOXTEL WIRING), 8 (CAR STACKERS), AND 9 (ROOF WALKWAY)
DEFECT 12 - ENTRY/GROUND FLOOR APARTMENT TILED AREA
DEFECT 14 - OMISSION OF CEILING TO PENETRATIONS IN UNIT G 10
DEFECT 18 - INSUFFICIENT FALL AROUND SKYLIGHT PENETRATIONS
DEFECT 21 - INSUFFICIENT FALL OF CAPPING FLASHING
DEFECT 22 - INSUFFICIENT FIXING OF CAPPING FLASHING
DEFECT 23 - INSUFFICIENT FIXING OF FLASHING LAPS
(a) there is a flow of water from the land of a person onto any other land; and
(ii) damage to the property (whether real or personal) of any other person; or
the person who caused the flow is liable to pay damages to that other person in respect of that injury, damage or loss.
(5) If the causing of, or the interference with, the flow (as the case requires) was given rise to by works constructed or any other act done or omitted to be done on any land at a time before the current occupier became the occupier of the land, the current occupier is liable to pay damages in respect of the injury, damage or loss if the current occupier has failed to take any steps reasonably available to prevent the causing of, or the interference with, the flow (as the case requires) being so given rise to.
(g) entry/ground floor apartment tiled area (Item 12); $Nil-withdrawn
(i) omission of sealing to penetrations (Item 14); $Nil.
(m) insufficient fall of flashing (Item 18); $Nil.
(n) box gutter change of directions (Item 19); $3,600.
(o) insufficient fall of box gutter (Item 20); $Nil.
(p) insufficient fall of cap flashing (Item 21); $8,500.
(q) insufficient fixing of capping flashing (Item 22); $730.
(r) insufficient fixing of flashing laps (Item 23); $1,400.
[1] Owners Amended Points of Claim dated 20 July 2023, [14].
[5] Mr Rustom's amended witness statement of 14 March 2025, [85].
[14] [2017] SASCFC 72, [54].
[16] Mr Coghlan's first report of 10 October 2022, p 88, TB 105.
[17] Mr Coghlan's second report of 31 May 2024, p 46, TB 230.
[18] Mr Coghlan's first report of 10 October 2022, 1.20, TB 25.
[19] Mr Coghlan's first report of 10 October 2022, p 6, TB 23.
[20] Mr Coghlan's second report 31 May 2024, TB 231.
[22] Mr Molnar's first report following his inspection on 23 January 2024, TB 127.
[23] Builder's written opening submissions dated 2 May 2025, [20].
[24] Mr Molnar's third report dated 18 April 2025, p 6, TB 380.
[27] Mr Stricker's witness statement, [16], TB 385.
[32] [2004] VSC 438; 11 VR 41
Owners Corporation PS801173C
Devakon Pty Ltd
(1954) 90 CLR 613
(2014) 254 CLR 185
(2009) 236 CLR 272