The applicant/owner shall restrict sediment discharges from any construction sites within the property in accordance with Construction Techniques for Sediment Pollution Control (EPA 1991) and Environmental Guidelines for Major Construction Sites (EPA 1995).
The existing vehicle crossing shall be upgraded in accordance with the Macedon Ranges Shire Council's standards prior to the commencement of buildings and works.
Stormwater run off from all buildings, tanks and paved areas must be dissipated at a legal point of discharge approved by the Responsible Authority. All new drainage is to be connected into Council's existing drainage network.
Prior to any works being undertaken on the road reserve an "Asset Protection Permit" must be obtained from Council.
[2]
This permit will expire if the development hereby permitted is not commenced within two years or completed (and the use commenced) within four years of the date of this permit. A written application may be made to the Responsible Authority for the extension of the permit prior to the permit expiring or within three months after the expiry of the permit.
Parties
Applicant/Plaintiff:
Optus Mobile
Respondent/Defendant:
Macedon Ranges SC [2009] VCAT 2578
Cases Cited (1)
Optus Mobile v Macedon Ranges SC [2009] VCAT 2578 (2 December 2009)