(a) carrying out -
(i) building work; or
(ii) plumbing or drainage work; or
(iii) operational work; or
(b) reconfiguring a lot; or
(c) making a material change of use of premises.
(1) A levied charge may be only for extra demand placed on trunk infrastructure that the development will generate.
(2) When working out extra demand, the demand on trunk infrastructure generated by the following must not be included -
(a) an existing use on the premises if the use is lawful and already taking place on the premises;
(b) a previous use that is no longer taking place on the premises if the use was lawful at the time the use was carried out;
(c) other development on the premises if the development may be lawfully carried out without the need for a further development permit.
(a) the demand generated by a use or development stated in subsection (2) may be included if an infrastructure requirement that applies, or applied to the use or development, has not been complied with; and
(b) the demand generated by development stated in subsection (2)(c) may be included if -
(i) an infrastructure requirement applies to the premises on which the development will be carried out; and
(ii) the infrastructure requirement was imposed on the basis of development of a lower scale or intensity being carried out on the premises.
(a) an infrastructure charges notice; or
(b) a notice stated in section 125(3).
infrastructure requirement means a charges notice, or a condition of a development approval, that requires infrastructure or a payment in relation to demand on trunk infrastructure.
contrary,[4] it is the construction of sub-ss (1) and (2) which is pivotal to the resolution of this proceeding. Because pursuant to s 119 a development approval is a pre-condition to the levying of an infrastructure charges notice, the reference to "the development" in sub-s (1) must be a reference to the building approval, having regard to s 280. Then applying s 120(1), in the context of the facts before me, there is no extra demand placed on trunk infrastructure that the building approval will generate over and above the MID. In both cases the hospital is what will generate the demand on trunk infrastructure. As noted above, the use of the premises for a hospital became accepted development as a consequence of the MID.
In the interpretation of a provision of an Act, the interpretation that will best serve the purpose of the Act is to be preferred to any other interpretation.
Further, s 14B permits extrinsic material, including an explanatory note relating to the Bill, to be considered in assisting in the interpretation of a provision. In this regard, the explanatory note to what became s 120 of the PA, which was cl 119 in the Planning Bill 2015 (Qld), relevantly stated:
Clause 119 ensures that a levied charge is only levied for additional demand placed on trunk infrastructure by a development.
The clause prevents the existing lawful use of a site or the existing rights to develop a site from being considered additional demand, unless an infrastructure requirement that applies or applied to the use or development has not been complied with.
[3] To the extent that the term was construed in Douglas Construction & Engineering Pty Ltd v Logan City Council [2023] QPEC 28 without regard to the definition in s 280 of the PA, it does not represent good law.
[4] Given the MID Plan of Designation included a "built form envelope comprising buildings and structures not exceeding 4 storeys, ground floor car parking and vehicular circulation", this is hardly surprising. See the Certificate of the CEO of the respondent filed 15 April 2025, Document 1, at page 14.
OPD Developers Pty Ltd & Anor