[2013] VCAT 1422
Victorian Civil and Administrative Tribunal
2013-09-27
Original judgment source is linked above.
J Hurley, D Wilson, N Walsh, R & L MacRedmond, J & C Kernot, V Currey, Beaumaris Conservation Society Inc., L Scott, V Gray, G Crocker, M & D Finnis
Oceans Beaumaris Pty Ltd v Bayside CC (Correction) [2013] VCAT 1422
annotations identifying any specific construction methods required by the approved Tree Management Plan to minimise the impact of the development on the trees proposed to be retained along the western boundary, including those on the adjoining land at 32 Bodley Street (refer to Conditions 15, 16 and 17 of this Permit)
a landscape plan generally in accordance with the landscape plan submitted to Council on 18 December 2012 (refer to Condition No. 12 of this Permit)
any modifications required by the approved Waste Management Plan (refer to Condition 30 of this Permit)
Water Sensitive Urban Design measures in accordance with Condition 31 of this Permit
Section 77 of the Planning & Environment Act 1987; Bayside Planning Scheme; Commercial 1 Zone; Residential 1 Zone; Heritage Overlay; Design and Development Overlay; Mixed-use development; Policy; Height, Heritage; Neighbourhood Character; Amenity; Car Parking.
J Hurley, D Wilson, N Walsh, R & L MacRedmond, J & C Kernot, V Currey, Beaumaris Conservation Society Inc., L Scott, V Gray, G Crocker, M & D Finnis
Oceans Beaumaris Pty Ltd v Bayside CC & Ors [2013] VCAT 1422
Mr I Pitt SC of Best Hooper. Evidence was called from:
Partial demolition; the construction of buildings and the construction and carrying out of works (including the reconstruction of Beaumaris Hotel/former Great Southern Hotel building; the construction of multi-level additions; four attached dwellings; and a two-storey apartment-style building) to accommodate dwellings, shops, restaurant and associated car parking.
Application under Section 77 of the Planning and Environment Act 1987.
Part Commercial 1 Zone.
Design and Development Overlay - Schedule 1, Building Height Control-Coastal.
Heritage Overlay - Schedule 66, 472 Beach Road, Beaumaris - Former Great Southern Hotel.
Vegetation Protection Overlay - Schedule 3, Beaumaris and Black Rock Native Vegetation Areas.
Cl. 31.02 & 34.01-1 (use of land in the Commercial 1 Zone for dwellings).
Cl. 32.01-4 (the construction of two or more dwellings on a lot in the Residential 1 Zone).
Cl. 34.01-4 (the construction of a building and the construction and carrying out works on land in the Commercial 1 Zone).
Cl. 43.01-1 (demolition; the construction of a building; and the construction and carrying out of works on land in Heritage Overlay - Schedule 66).
Cl. 43.02-2 (the construction of a building and the construction or carrying out of works on land in Design and Development Overlay - Schedule 1.
Cl. 52.06-3 (reduction of the car parking requirement).
Cl. 52.27 (use of land for the sale and consumption of liquor).
Cl. 10, 11.01, 11.04, 15, 15.01, 15.03, 16.01, 17.01, 18.02, 21, 22.05, 22.07, 32.01, 34.01, 43.01, 43.02, 52.06, 52.07, 52.27, 55 and 65.
The review site is comprised of two lots. The larger of these is within the Commercial 1 Zone and is occupied by the Beaumaris Hotel (former Great Southern Hotel) and part of its associated car park. The remaining lot, at 34 Bodley Street, is within the Residential 1 Zone and accommodates the remainder of the hotel's car park. The combined land holding is irregular in shape; has a 53.21 metre frontage to Beach Road, a 94.73 metre sideage to Bodley Street; and an overall site area of approximately 4495 square metres. To the south are commercial premises that front either Beach Road or Keys Street. To the west is a residential property which is occupied by a detached single-storey dwelling. On the opposite side of Bodley Street are a two-storey dwelling, an apartment-style building which is currently under construction, and the Beaumaris Motel. To the east, on the opposite side of Beach Road, is the Beaumaris foreshore reserve.
An accompanied site inspection was undertaken on the first hearing day.
Is the proposal consistent with the relevant planning policies of the Bayside Planning Scheme?
Does the built form respond acceptably to the strategic and physical context of the site?
Would the proposal be acceptable in terms of its effect on the heritage values of the historic Great Southern Hotel?
Is the proposal respectful of its locality's neighbourhood character?
Will the development have an unacceptable impact on the amenity of neighbouring residential properties?
(i) the provision of 6 cubic metres of storage space for each dwelling
(ii) each tandem space must be 4.9 metres in length, with a further 0.5 metre length provided between each space, to achieve a length of 10.3 metres
Traffic and parking operations on and adjacent to the site must be in accordance with the approved Traffic and Parking Management Plan to the satisfaction of the Responsible Authority.
The development must be undertaken in accordance with the approved Construction Management Plan, to the satisfaction of the Responsible Authority.
All species selected must be to the satisfaction of the Responsible Authority.
The ground surface of the Tree Protection Zone must be covered by a 100 mm deep layer of mulch before the development starts and be watered regularly to the satisfaction of the Responsible Authority.
No vehicular or pedestrian access, trenching or soil excavation must occur within the Tree Protection Zone without the written consent of the Responsible Authority. No storage or dumping of tools, equipment or waste must occur within the Tree Protection Zone.
The approved Conservation Management Plan must be implemented to the satisfaction of the Responsible Authority.
When approved, the plan will be endorsed and will then form part of the permit. The collection of waste and recyclables from the land must be undertaken in accordance with the approved Waste Management Plan, to the satisfaction of the Responsible Authority.
These plans must be accompanied by a report from an industry accepted performance measurement tool, which details the treatment performance achieved and demonstrates the level of compliance with the Urban Stormwater - Best Practice Environmental Management Guidelines, CSIRO 1999.
The water sensitive urban design stormwater treatment system as shown on the endorsed plan must be retained and maintained at all times in accordance with the Urban Stormwater - Best Practice Environmental Management Guidelines, CSIRO 1999, to the satisfaction of the Responsible Authority.
In accordance with Section 69 of the Planning and Environment Act 1987 an application may submitted to the responsible authority for an extension of the periods referred to in this condition.
[1] We have considered all submissions presented by the parties although we do not recite all of the contents in these reasons.
[2] Although the Strategic Land Use Framework Plan has the activity centre noted as a 'Neighbourhood Centre' the Council advised that this designation has been consistently accepted as referring a Neighbourhood Activity Centre.
[4] Pursuant to Section 60(1A)(g) of the Planning and Environment Act 1987
[5] We do not give any credence to the possibility that the reconstructed historic roof would offend viewers on the waters of Port Phillip Bay.
[6] The illustration that accompanies Design Suggestion 2.2.2 Set Back Upper Levels of Tall Buildings or Use a Podium and Tower Form to Help Create a Pedestrian Scale at Street Level, in Guidelines for Higher Density Residential Development (Department of Sustainability and Environment, 2004) shows a three-storey podium as an example of a pedestrian-scale building.
[7] Refer to Hogan Carrum Property Pty Ltd v Stonnington CC & Ors (Correction) [2013] VCAT 16 at paragraphs 63-64.
[8] We note that this included a calculation of the car parking demand associated with the restaurant that exceeded that derived by utilising the rate specified in Clause 52.06-5.
[9] We do not make any finding as to whether the commercial component should or should not remain. We have made our decision on the proposal that is before us. Should the Applicant wish to remove the commercial element, then an amendment to the permit will need to be applied for pursuant to the relevant provisions of the Planning and Environment Act 1987.
Oceans Beaumaris Pty Ltd
Bayside CC