DISPUTE - Dispute referred under s 158 of the Building Act 1993 between owners of buildings with a party wall about the construction of the wall or how much of the cost of construction is to be met by each of the owners.
APPLICANTS Richard O'Bryan and Oliver Da Silva (Adjoining Property owners)
RESPONDENT Strod60 Pty Ltd (ACN 630 670 889) (Subject Land owner)
ADJOINING PROPERTY 62 Raglan Street, Daylesford
BEFORE Members L English (panel chair) and P Paras
CITATION O'Bryan & Anor v Strod60 Pty Ltd [2025] VBAB 90
(a) Do the buildings on 60 Raglan Street, Daylesford and 62 Raglan Street, Daylesford share a party wall?
(b) If the buildings on 60 Raglan Street, Daylesford and 62 Raglan Street, Daylesford share a party wall, is there a dispute between the owners of 60 Raglan Street, Daylesford and 62 Raglan Street, Daylesford?
(c) If:
- the buildings on 60 Raglan Street, Daylesford and 62 Raglan Street, Daylesford share a party wall; and
- there is a dispute between the owners of 60 Raglan Street, Daylesford and 62 Raglan Street, Daylesford,
is that dispute a dispute about the construction of the party wall or how much of the cost of construction is to be met by each of the owners?
_______________________ ________________________
(a) the masonry wall of the building on (or near) the western boundary of the Subject Land (Respondent's Building) (immediately adjacent to the building on the Adjoining Land (Applicant's Building), which itself is constructed on (or near) the eastern boundary of the Adjoining Land) has, through neglect or otherwise, become structurally deficient; and
(b) the non-masonry wall of the Respondent's Building (immediately adjacent the deck and private open space to the rear of the Applicant's Building and constructed on (or near) the eastern boundary of the Adjoining Land) should be, but is not, a fire-rated wall,
and enforcement action was therefore required to be carried out by the MBS to address these matters.
(a) a determination that the walls mentioned above (collectively, Walls) are, for the purposes of s 158 of the Act, 'party walls';
(b) determinations about the required construction standard of the Walls;
(c) orders requiring certain works to be performed on the Walls; and
(d) orders determining apportionment of the costs of those works.
(1) If a dispute arises between the owners of buildings with a party wall about the construction of the wall or how much of the cost of construction is to be met by each of the owners, any of the owners may refer the matter to the Building Appeals Board.
(2) Subsection (1) is in addition to and does not take away from the Subdivision Act 1988.
(a) Do the buildings on the Subject Land and the Adjoining Land share a party wall?
(b) If the buildings on the Subject Land and the Adjoining Land share a party wall, is there a dispute between the Applicants and the Respondent:
(c) If:
(i) the buildings on the Subject Land and the Adjoining Land share a party wall; and
(ii) there is a dispute between the Applicants and the Respondent,
is that dispute about the construction of the party wall or how much of the cost of construction is to be met by each of the owners.
As was pointed out by Fry J in Watson, v. Gray (1880), 14 Ch. D. 192, at pp. 194-5, the term "party wall" may have various meanings. It may mean (a) a wall of which the two adjoining owners are tenants in common, or (b) a wall divided vertically into two portions, one belonging to each of the adjoining owners, or (c) a wall which belongs entirely to one adjoining owner subject to an easement in the other to have it maintained as a dividing wall, or (d) a wall divided vertically into two portions, each owned by one, but being subject to a cross easement in favour of the other portion.
The term 'party wall' may be used at common law in any one of four senses. It may mean:
The applicable definition will depend on the given circumstances. For example ... the second scenario will apply where the centre of the wall is situated on the boundary line between parcels'.
According to the definition of 'party wall' in the Encyclopaedic Australian Legal Dictionary, in order for a wall to be a 'party wall', it must provide support to each house or structure. It defines 'party wall' as:
'A wall common to two houses or other structures and from which each draws support.' (emphasis added).
the expression 'party wall' can encompass certain types of walls that do not provide structural support to the relevant buildings/structures.
(a) a wall of which the two adjoining owners are tenants in common;
(b) a wall divided longitudinally into two halves, one half belonging to each of the adjoining owners;
(c) a wall belonging entirely to one of the adjoining owners, but subject to an easement or right in the other to have it maintained as a dividing wall between the two properties;
(d) a wall divided longitudinally into two halves, each half belonging to the owner of the land upon which it stands but subject to a cross-easement in favour of the other half; and
(e) a wall that is common to two structures which supports both of those structures (Fifth Scenario).
(a) three documents, referred to by the Applicants as 'lay person's submissions', authored by:
(i) Mr David Penman;
(ii) Mr Tim Carroll; and
(iii) Mrs Angeline O'Bryan; and
(b) a number of reports procured by the Applicants, including:
(i) a 'Consultants Advice Notice' prepared by, and an email from, Mr Gino Catania of GinCat Fire Engineering; and
(ii) a 'Drainage Assessment' prepared by Mr Simon Merrigan, a land surveyor[9] with the firm, Miller Merrigan; and
(iii) an expert witness report prepared by Mr Merrigan (for Victorian Civil and Administrative Tribunal proceedings) in relation to alleged unreasonable flow of water from the Subject Land to the Adjoining Land.
(a) two engineering reports (one authored by Peter Ryan and one authored by Stanley Nyandowe of Infradesign (Infradesign Report)) obtained by the Respondent in response to action taken by the MBS before the Dispute Proceeding commenced;
(b) a letter sent by the Respondent's then solicitor to the Applicants (Solicitor's letter); and
(c) a (very brief) expert report (authored by Rocco Carinci of Rincovitch Consulting (Carinci Report)) procured and filed by the Respondent in the Dispute Proceeding, which the Respondent had previously indicated (well in advance of the hearing) was 'withdrawn' and would not be relied on by the Respondent.
(a) documents put to Mr O'Bryan during cross-examination; and
(b) documents that were tabled during presentation of the Respondent's submissions,
Absence from the hearing of various (potential) witnesses
(a) made allegations that there were (at least) two different versions of the Infradesign Report;
(b) at an earlier directions hearing, sought orders that Council be ordered to provide an unredacted copy of the Infradesign Report;[11] and
(c) did not make any application to have Mr Nyandowe[12] available for cross-examination at the hearing.
(a) sought to rely on the Infradesign Report; and
(b) did not themselves call any expert evidence,
we could draw an adverse inference against the Applicants regarding Mr Nyandowe's absence from the hearing.[13] However, we do need to draw any inferences in relation to Mr Nyandowe. As detailed below, that part of the Infradesign Report relied on by the Applicants speaks for itself.
Enquiries regarding Infradesign, offices recorded at Como centre South Yarra, they have never had a tenant by that name. Cold call led me to a reception in Zimbabwe. Via company search and a lot of foot work, Stanley Nyandowe operates his business from an upstairs room at [Mr Nyandowe's home residence]. trying to serve this guy court documents, I observed him entering the property at night, then his children denied his presence. As requested further information, including a peer review as required under structural engineer code of conduct in Victoria, refused on many occasions.
and continued, quoting the response from Mr Nyandowe:[16]
... I do NOT appreciate your harassment and your actions have been traumatic to me. Please BACK OFF. You threatened to take action against me and I do NOT FEEL SAFE ANYMORE... PLEASE BACK OFF, I DO NOT WANT TO KNOW YOU, OR WORK WITH YOU NOR WORK FOR YOU... PLEASE, PLEASE, PLEASE BACK OFF... Your actions are a Harassment and coercion to me and they should stop.
(a) security camera footage of Mr O'Bryan taken at Mr Nyandowe's home residence, wherein Mr O'Bryan (who was apparently attempting to serve a subpoena in relation to a different matter) falsely represented that he was trying to deliver a 'valuable' parcel to Mr Nyandowe;
(b) the emails from Mr Nyandowe to Mr O'Bryan (cited in the Applicants' chronology, and quoted above); and
(c) an email from the 'Head of Operations, Business Development' of Rincovitch Consulting describing Mr O'Bryan's attempts to contact various people at that firm as 'escalating to a level of harassment'.
(a) for some distance to the north of the Applicants' Building is up to approximately 700 mm high, and functions as a retaining wall (Northern Retaining Wall Portion), retaining soil at a higher finished ground level on the Subject Land than is found on the Adjoining Land;
(b) a short distance to the north of Applicants' Building, rises up to become the gable end western wall of the Respondent's Building (Building Wall Portion); and
(c) for some distance to the south of the Respondent's Building continues at a height of up to approximately 700 mm high, and functions as a retaining wall (Southern Retaining Wall Portion), retaining soil at a higher finished ground level on the Subject Land than is found on the Adjoining Land.
cannot unequivocally confirm that [the eastern wall of the Applicants' Building] is a timber clad wall.
My name is Tim Carroll, I am a builder who built the loft building in the rear of 62 Raglan Street around 2017...
Because of the construction technique adopted protection of the structural integrity of 62 Raglan Street via flashings between the two structures is totally dependent on the proper maintenance and integrity of the masonry wall at 60 Raglan Street. If not water penetration between the buildings would corrode the timber weatherboards of 62...
I've got one engineer, who has written a structural engineering report on next door, saying that he believes the roof structure of [the Applicants' Building] is supported by that wall...,
suggesting that extension might have resulted in replacement of the ridge beam of the Applicants' Building, which Mr O'Bryan suggested in submissions is supported by the masonry wall of the Respondent's Building - despite him also submitting that:
I cannot tell you unequivocally whether the roof of this building is supported on that wall or not.
Under your consideration are some of the oldest buildings in the State of Victoria. My family owns Poets Lodge, built in 1860 and located at 62 Raglan Street Daylesford, this adjoins the neighbours [sic] property 60 Raglan Street, built 1862.
without invasive investigation, the issue of support is unproven.
Reliance on the Infradesign Report and the Solicitor's Letter
However Infradesign noted the observation for a reason. That is why the Applicants summonsed him to the BAB...[20]
It also appears that part of the roof of 62 Raglan Street is supported on the subject wall.
If our observation is correct, it suggests a malpractice as structures can not be structurally dependent on the neighbour structures on the neighbour's property unless in the case of a party wall...
and makes a number of recommendations, including (with added emphasis):
We also recommend that it be conclusively determined whether the roof from 62 Raglan is resting on 60 Raglan Street. (the subject wall). It is important to ensure that the structure is independently supported and not supported on a wall that is showing signs of stress as indicated by the crack as repair work may compromise the neighbour's (62 Raglan St) structure if not independently supported... This recommendation is also intended to reduce the load on the subject wall should it be loaded by structures from the neighbour which the wall may NOT have been designed for in the first place...
We place you and your co-owner, Oliver Gerald da Silva, on notice that our client holds you responsible for damage to the wall and costs to date. Our client reserves the right to recover from you engineering and builder fees incurred to date.
(a) on the one hand, asserting that the Applicants' Building is supported by the masonry wall; and
(b) on the other hand, providing sworn testimony that the question of support cannot be positively determined without 'invasive investigation'.
(a) the Applicants should have carried out investigations (including, to whatever extent necessary invasive investigations within the Applicants' Building)[21] to obtain sufficient evidence to establish whether the Applicants' Building is supported by the masonry wall; and
(b) the assertion that the Applicants' Building is supported by the masonry wall should not have been made without objective evidence supporting that assertion.
(a) the Applicants' Building was extended at any time after the Respondent's Building was constructed; or
(b) the ridge beam (or any part of the roof structure) of the Applicants' Building is supported in any way by the masonry wall of the Respondent's Building.
(a) the Respondent's Building is a masonry building, and was constructed after the Applicants' Building was built;
(b) the Respondent's Building is constructed entirely within the property boundaries of the Subject Land;
(c) both of the Walls are 'external' walls of the Respondent's Building;
(d) the Applicants' Building is a timber building, and was constructed before the Respondent's Building was built;
(e) the (relevant part of) the Applicants' Building is constructed entirely within the property boundaries of the Adjoining Land;
(f) the eastern wall of the Applicants' Building is an 'external' wall of that Building;
(g) each of the two buildings were constructed separately, without any reliance or support on the other; and
(h) where the two buildings are alongside one another:
(i) the external wall of the Respondent's Building is constructed of masonry;
(ii) the external wall of the Applicant's Building is constructed of timber clad with weatherboards; and
(iii) there is a gap of approximately 25 millimetres between the masonry wall and the wall of the Applicant's Building.
(a) the masonry wall, in respect of which they rely on four claimed factors:
(i) flashings are attached to the masonry wall and the roof of the Applicants' Building;
(ii) the roof of the Applicants' Building is supported by the masonry wall;
(iii) the masonry wall acts as a retaining wall (below the level of the finished floor level of the Respondent's Building); and
(iv) fire separation should be provided by the masonry wall; and
(b) the non-masonry because fire separation should be provided by the non-masonry wall.
(a) there is one wall of which the Applicants (on the one hand) and the Respondent (on the other) are owners as tenants in common;
(b) there is one wall divided longitudinally into two halves, one half of which belongs to the Applicants (with the other half owned by the Respondents); or
(c) there is one wall divided longitudinally into two halves, each half of which belongs to the owner of the land upon which it stands and subject to a cross-easement in favour of the other half,
and we observe that these claims, if they had been made, could not possibly have been supported by the evidence. As noted above, the Walls are constructed wholly on the Subject Land. Accordingly, the Walls belong entirely to the Respondent.
an easement or right in the other to have it maintained as a dividing wall between the two properties.
(a) the masonry wall sits alongside the weatherboard wall of the Applicants' Building; and
(b) the non-masonry wall is constructed on (or near) the boundary of the Subject Land adjacent to the private open space of the Adjoining Land.
a wall that is common to two structures which supports both of those structures.
(a) flashings are attached to the wall of the Respondent's Building and the roof of the Applicants' Building;
(b) the roof of the Applicants' Building is supported by the wall of the Respondent's Building;
(c) the masonry wall acts as a retaining wall; and
(d) fire separation should be provided by the masonry wall.
(a) whether the masonry wall is common to the Applicants' Building and the Respondent's Building; and
(b) whether the masonry wall supports both the Applicants' Building and the Respondent's Building.
The title for the Applicants' property does not indicate any party walls or easements on the relevant section where the structures are located on the allotment. We note generally and based on the Walsh decision and general practice that such details would typically be recorded on the property title of both the Applicants and Respondent. [24]
Implied easement - doctrine of lost modern grant?
Implied easement - Subdivision Act 1988?
(a) all land on a plan of subdivision of a building;
(b) that part of a subdivision which subdivides a building;
(c) any land affected by an owners corporation; and
(d) any land on a plan of subdivision which expressly states that s 12(2) of the Subdivision Act applies to it,
Does the masonry wall support both buildings?
The photographs show that the building on the Applicants' and Respondent's properties each have separate external walls. External walls are often load bearing walls which suggest that each building has independent structural supports relying on its respective external walls.
(a) the masonry wall is not a party wall; and
(b) the non-masonry wall is not a party wall.
(a) in relation to the masonry wall, in four ways:
(i) flashings are attached to the wall of the Respondent's Building and the roof of the Applicants' Building;
(ii) the roof of the Applicants' Building is supported by the wall of the Respondent's Building;
(iii) the masonry wall acts as a retaining wall; and
(iv) the Applicants rely on the masonry wall for 'fire separation'; and
(b) in relation to the non-masonry wall, the Applicants rely on it for 'fire separation'.
(a) we have not found that the roof of the Applicants' Building is supported by the masonry wall; and
(b) we conclude that the roofs of both of the buildings are supported by their own external walls.
(a) the Applicants rely on a notion of 'structural reliance' (as a proxy for 'support'); and
(b) the Applicants rely on assertions about risk to the Applicants' Building (or the Adjoining Land more generally).
In Bradburn versus [sic] Lindsay (1983) All ER 408 where a party is guilty of negligence where the wall falls into disrepair through neglect the party with the wall will have breached their duty of care and would be responsible for the cost of rectification.
Section 158 of the Act is a remedial provision, which enables parties to resolve disputes before the BAB. The expression 'party wall' should be given an expansive interpretation so that parties are able to seek the assistance of the BAB, without the parties needing to seek declarations from a court.
From a fire engineering point of view the risk the Building Regs and Code is trying to address is fire spread to a building.
i.e. an owner must protect themselves from fire, by a fire rated wall that has rating from the outside only.
Eg Bushfires are fires from outside, brick veneer or approved fire rated systems to protect from fires on adjoining boundaries.
The same applies for windows on a boundary where in Volume 1 of the BCA, the intent is to protect from outside under BCA Clause 3.2.
Therefore the neighbours' wall should be fire rated from the outside to meet the prescriptive requirements of the BCA/Regs...
[1] We have considered all of written and oral submissions made by the parties and (relevant) material filed with the BAB, however, we do not consider it necessary to refer to or cite all of the material put before us, instead focussing on the key points leading to our findings.
[4] LexisNexis Australia. Cited in Wong v Zhang & Anor [2019] VBAB 10 at [13].
[6] Constituted by Members Lodge (panel chair), Kurban and Knight.
[9] Mr O'Bryan referred to Mr Merrigan as a civil engineer, however we note that Mr Merrigan states in his VCAT evidence report 'My academic qualifications are: Bachelor of Applied Science (Surveying), 1992 at RMIT; Master of Landscape Architecture, 2000 at Melbourne University'.
[10] Pursuant to s 15 of the Evidence (Miscellaneous Provisions) Act 1958 (as in force immediately before its repeal) (per cl 2 of Sch 3 to the Building Act 1993).
[11] Which resulted in the BAB issuing a 'summons to produce' to Mr Nyandowe.
[12] The Applicants made an application for a summons to be served on Hepburn Shire Council to require it to provide an unredacted version of the Infradesign Report. After considering that application at a directions hearing, the BAB ordered the Respondent to file and serve an unredacted version of the report and issued a 'summons to produce' to Mr Nyandowe', requiring him to produce other documents referred to in his report. The Applicants did not apply for a summons to be made requiring Mr Nyandowe to appear at the hearing.
[13] The 'rule' in Jones v Dunkel [1959] HCA 8; (1959) 101 CLR 298. Noting that the BAB is not actually bound by the rules of evidence (cl 3(d) of sch 3 to the Building Act 1993).
[14] Orders that were vigorously opposed by the Respondent.
[16] Which the Applicants allege was 'drafted by' the director of the Respondent - an allegation about which we do not (as we do not need to) make any finding.
[17] In addition to the fact that the BAB refused the Applicants' application to summons him to attend.
[18] As discussed below, the Infradesign Report observes that further investigation is required.
[19] Noting that this report was not filed with, or tendered to, the BAB, and the unidentified author of it was not called to give evidence.
[21] Reference was made to requests to enter the roof space of the Respondent's Building. We do not accept that entering the roof space of the Respondent's Building would have been of much assistance in answering the question as to whether the Applicant's Building is supported by the masonry wall. In our view, an inspection (which, may or may not require invasive investigation) of the Applicants' Building's roof space would be much more likely to provide evidence of the means of support of the roof of the Applicants' Building.
[23] Constituted by Members Hodges (panel chair) and Van Ravenstein.
[25] See, for example, Valmorbida v Les Denny Pty Ltd [2023] VSC 680.
[27] At [13] and [14]. Footnotes omitted.
[28] Constituted by Members Hodges (Chairperson) and Van Ravenstein.
[30] Though we note that we do not need to (and do not) make any findings about these allegations.
�O'Bryan & Anor
Strod60 Pty Ltd [2025] VBAB 90;
(1959) 101 CLR 298