[2025] NTSC 44
General information, not legal advice.
Supreme Court of the NT
2025-07-24
Commissioner Against
Original judgment source is linked above.
Application to Strike Out Pleading - No Reasonable Cause of Action Pleaded - Breach of Contract - No material facts pleaded linking breaches of contract to caused loss - Application dismissed
Application to Strike Out Pleading - Concurrent Application to Amend Pleadings- Amendments made without leave of Court - Abuse of Process - Amendment seeking to withdraw admission made in pleading - Application to strike out dismissed and leave to amend granted
Supreme Court Rules 1987 (NT) r 23.02(a), r 23.02(d), r 23.04(2)
A v Ipec Australia Ltd and Crew [1973] VicRp 4; [1973] VR 39; Amcor Pty Ltd Trading as A.P.M Containers v Victoria Valley Beef Pty Ltd & Anor [1995] NTSC 11; Bellgrove v Eldrige [1954] HCA 36; (1954) 90 CLR 613; Berno v Green's Steel Constructions Pty Ltd [1991] NTSC 4; Bond Corporation Pty Ltd v Thiess Contractors Pty Ltd [1987] FCA 84; (1987) 71 ALR 615; Bulmer v Oakey Co-op Dairy Co Ltd [1908] St R Qd 216; Darcy v Connolly [1923] WALawRp 24; (1924) 26 WALR 93; De Cesare v Deluxe Motors Pty Ltd (1996) 67 SASR 28; Director of War Service Homes v Harris (1968) Qd R 275; Fancourt v Mercantile Credits Ltd (1983) 154 CLR 87; Golding v Wharton Saltworks [1876] UKLawRpKQB 41; (1876) 1 QBD 374; Hoh v Frosthollow Pty Ltd [2014] VSC 77; Karlovsky v Q-Built Constructions [2006] NTMC 93; Knowles v Roberts [1888] UKLawRpCh 42; (1888) 38 Ch D 263; Laws v Australian Broadcasting Tribunal [1990] HCA 31; (1990) 170 CLR 70; Liddle v North Australian Aboriginal Legal Aid Service Inc [1993] NTSC 78; Motor Accidents (Compensation) Commission v Toyota Motor Corporation Australia Limited & Anor [2023] NTSC 65; Northern Territory of Australia v Bellamack Pty Ltd [2024] NTSC 66; Northern Territory of Australia v John Holland Pty Ltd & Ors [2008] NTSC 4; Otter Gold NL v Barcon Pty Ltd & Sankey [2000] NTSC 65; Robinson v Harman [1848] EngR 135; (1848) 1 Exch 850; Scott Carver Pty Ltd v SAS Trustee Corporation [2005] NSWCA 462; Sherrington v Independent Commissioner Against Corruption (NT) & Anor [2025] NTSC 27; Singleton v. John Fairfax & Sons Ltd [1982] 2 NSWLR 38; Stohl Aviation v Electrum Finance Pty Ltd (1984) 56 ALR 716; Tabcorp Holdings Ltd v Bowen Investments Pty Ltd (2009) 236 CLR 272; Tropicus Orchids Flowers and Foliage Pty Ltd v Territory Insurance Office [1995] NTSC 131; UI International Pty Ltd v Interworks Architects Pty Ltd & Ors [2006] QSC 79; UI International v Interworks Architects P/L & Ors [2006] QCA 434; UI International Pty Ltd v. Interworks Architects Pty Ltd & Ors [2007] QSC 96; UI International Pty Ltd v Interworks Architects Pty Ltd [2007] QCA 402; (2008) 2 Qd R 158; Webster v Lampard [1993] HCA 57; (1993) 177 CLR 598; Westpoint Management Ltd v Chocolate Factory Apartments Ltd [2007] NSWCA 253, referred to.
Grant on Civil Procedure, Presidian Legal Publications, paragraph 5.23.106
Heydon JD, Heydon on Contracts, (Sydney, Thomson Reuters, 2019)
Defendant: Clayton Utz followed by MCS Wolf Pty Ltd
Northern Territory of Australia v Bellamack [2025] NTSC 44
(1) Issues relating to the strike out of paragraph [23] of the Second Amended Statement of Claim ("2ASOC"); and
(2) Issues relating to the purported withdrawal of admissions in paragraphs 6 and 19 of the 2ASOC and various other amendments to other paragraphs 4(a), 17(c)(i), 13(a)(i)(B) and 14(b).
[4] Sometime before 1 June 2009, the Territory decided to develop a suburban subdivision on Crown land in Palmerston, to be known as the suburb of Bellamack. The Territory was the registered proprietor of the land which was referred to as the "lease area". There was a call for expressions of interest for proponents to develop the lease area and a competitive selection process was conducted. Bellamack was selected as the preferred proponent.
[5] On 1 June 2009, the Territory and Bellamack entered into a development agreement. The scheme of the development agreement was that Bellamack was initially granted a Crown lease over the area of land to be developed, subject to the terms and conditions in the development agreement and the lease.
[6] As part of its obligations under the development agreement (developer's works) Bellamack was required to develop, inter alia, residential housing blocks in the lease area, together with a number of house and land packages (affordable homes) which were to be sold to qualified low-income consumers (eligible purchasers).
[7] In accordance with the development agreement, Bellamack was to complete the subdivision works in stages over six years. As each stage was practically complete, areas of the Crown lease were converted into titles to the developed lots registered in the name of Bellamack. As the development went on, some lots were further subdivided and additional titles were issued. Bellamack then sold the titled lots to third parties (purchasers) and remitted a percentage of the sale price of each lot to the Territory upon settlement. After issue of a certificate of title, and pending the sale of each lot, the Territory was entitled to register a caveat to protect its interest. The caveat on each lot was removed upon completion of sale to a purchaser.
[8] The consideration payable to Bellamack is set out in special condition 2 of schedule 4 of the development agreement. In practical terms, Bellamack's payment came from monies received on the sale of the lots. The development agreement also stipulated that the minimum consideration payable to Bellamack upon completion of all lots was to be $14,450,000.
[9] It is not in dispute that, after the sale of each lot had taken place, and the amount payable under the development agreement had been paid, the Territory had no ongoing proprietary or beneficial interest in the land the subject of a sold lot.
[10] Bellamack was obliged, in accordance with clause 3 of schedule 4 of the development agreement, to allocate 67 lots as "affordable allotments". The location of those allotments was required to be approved by the Territory. Bellamack was also obliged to make available to eligible purchasers the maximum number of affordable homes capable of being constructed on the affordable allotments, which was said to be between 77 and 114 houses. An eligible purchaser is defined in the development agreement as "a purchaser determined by the Territory (in its absolute discretion) who has pre-approval for finance to purchase an Affordable Allotment and Affordable Home under this special condition".
[11] The Territory's obligation in relation to identification of eligible purchasers was set out in the development agreement in these terms:
The Territory must at all times during the Term make its best endeavours to nominate and refer to the Developer a sufficient number of Eligible Purchasers to enable the Developer to fulfil its obligations under this special condition 3.
[12] That clause is followed by clause 3.4 which provides, in summary, that if an affordable lot or home was unsold after three months from issue of the title, Bellamack was required to offer it to the Territory for purchase on the same terms as the property would have been sold to an eligible purchaser. If the Territory failed or refused to purchase the property, Bellamack could then offer it for sale on the open market at market price.
[13] Bellamack's obligations under the development agreement as pleaded in the ASOC also included:
[14] In 2012, by separate contract, Bellamack sub-contracted that part of its obligations under the development agreement which related to construction of the 18 houses the subject of this proceeding to San Industries Pty Ltd trading as Titan Building Systems (San Industries). The houses were constructed between 2012 and 2014. San Industries is now insolvent.
[15] Ten of the 18 homes built by San Industries were subject to the compulsory home warranty protection scheme known as the Home Building Certification Fund (HBCF) then in place in the Northern Territory. The HBCF was the scheme of insurance approved by the Director of Building Control pursuant to s 61 of the Building Act at the relevant time. The HBCF was financed largely by the Territory, with some contribution through premiums paid by builders and owners. Initially, the HBCF was managed by the Territory Insurance Office on behalf of the Territory.
[16] The remainder of the houses built by San Industries were covered by the Master Builders Association Fidelity Fund Scheme (MBA Fidelity Fund) insurance arrangement which replaced the HBCF scheme as the approved insurance pursuant to s 61 of the Building Act from 1 January 2013.
[17] In the period from about 2013 to 2014, Bellamack sold 17 of the affordable homes constructed by San Industries to eligible purchasers pursuant to individual contracts of sale between it and the relevant purchaser(s) (home owners). Bellamack retained ownership of one lot on which San Industries had constructed a house (house 9) and made the relevant payment to the Territory in accordance with the development agreement.
[18] From about 2015, serious construction defects became apparent in all of the houses constructed by San Industries. In about July 2015 Bellamack wrote to the purchasers of the houses acknowledging the defects, and stating that it had written to San Industries to rectify the faults and had engaged a structural engineer. The defects were not rectified. In 2019 Bellamack commenced proceedings against San Industries claiming damages in respect of the defects in the houses.
[19] The owners of each of the ten houses covered by the HBCF scheme (including Bellamack in relation to house 9) have made a claim under that scheme for rectification of defects. The Territory has, so far, assessed that the HBCF scheme covers all of the claims, other than that made by Bellamack which remains outstanding. On the basis that none of the houses could be economically repaired, the Territory has provided purchasers with an option to either rebuild their homes or sell them to the Territory. As a result, six of the nine lots were purchased by the Territory and three houses were rebuilt. The claim in relation to the property owned by Bellamack has not been finalised.
[20] The eight houses insured under the MBA Fidelity Fund scheme have not been purchased or rebuilt at the expense of the Territory.
[21] For the purpose of this application, Bellamack asks the Court to assume that the 18 affordable homes built by San Industries did not meet the contractual definition and specifications of an affordable home prescribed by the development agreement in accordance with clauses 3.3 and 3.14 of the special conditions and clauses 1.2 and 2.3 of Annexure F (functional design guidelines). The obvious consequence is that for the purpose of this application it is assumed that Bellamack breached its contract with the Territory. Bellamack does not, however, admit the breach of the development agreement for the purpose of the proceeding generally.
Issues in respect to Paragraph 23 of the Statement of Claim
Where an endorsement of claim on a writ or originating motion or a pleading or a part of an endorsement of claim or pleading:
(a) does not disclose a cause of action or defence;
(b) is scandalous, frivolous or vexatious;
(c) may prejudice, embarrass or delay the fair trial of the proceeding; or
(d) is otherwise an abuse of the process of the Court,
the Court may order that the whole or part of the endorsement or pleading be struck out or amended.
(a) to define with clarity the issues which are in dispute between the parties and fall to be decided by the court;
(b) to require each party to give fair and proper notice to the other of the case to be met to enable the opponent to frame and prepare the opponent's own case for trial;
(c) to inform the court what are the precise matters in issue between the parties which alone the court may determine, since they set the limits of the action which may not be extended without due amendment properly made, and
(d) not only to provide a brief summary of the case of each party, which is readily available for reference, and from which the nature of the claim and defence may be easily apprehended, but also to constitute a permanent record of the issues and questions raised in the action and decided therein so as to prevent future litigation upon matters already adjudicated upon between the litigants or those privy to them.
The general rules of pleading are contained in Order 13 Supreme Court Rules. O 13.02(1)(a) provides:
"A pleading shall ... contain in a summary form a statement of all the materials facts on which the party relies but not the evidence by which those facts are to be proved."
Material facts are those necessary to formulate a complete cause of action. The Statement of Claim must state with sufficient clarity the case that must be met. Material allegations of fact are not to be expressed in terms of great generality. They must inform the defendants of the case they must meet and set it out with particularity sufficient to enable any eventual trial to be conducted fairly to all parties. As James LJ said in Davy v Garrett [1878] UKLawRpCh 8; (1878) 7 Ch D 473 at 486:
"... a defendant may claim ex debito justitiae to have the plaintiff's case presented in an intelligible form, so that he may not be embarrassed in meeting it ..."
A defendant is entitled to have a plaintiff tied down to a clearly pleaded case so as not to be able to spring a new case on the defendant at trial. A plaintiff must plead its case with clarity sufficient to preclude conjecture as to what the case being made against a defendant might be. The defining of the issues in litigation is required from an early stage because discovery and other interlocutory procedures and steps necessary to deal with an opposing case must be conducted within a known framework. Apart from questions of procedural fairness, properly pleaded cases set the arena for the eventual trial and interlocutory processes preceding trial and assist the court by ensuring that the task of managing interlocutory processes and of supervising the conduct of the trial itself are conducted in circumstances where the nature and ambit of the dispute between the parties is clear and the issues for decision are defined. The general rule is that relief is confined to that available on the pleadings. This is a basic requirement of procedural fairness: Banque Commerciale SA, En Liquidation v Akhil Holdings Pty Ltd (1990) 169 CLR 279 at 286.
In a claim for breach of contract the material facts which must be pleaded include:
(1) the term of the contract alleged to have been breached;
(3) the particular means by which the breach is alleged to have occurred;
(4) the details of any special or consequential damage claimed, and
(5) the facts which establish the necessary causal link between breach and damage.
On an application under rule 23.02 no evidence shall be admissible on the question whether an endorsement of claim or pleading offends against that rule.
Bellamack argues that the Territory's ASOC is defective because it fails to plead material facts which, if proved, would establish that Bellamack's breaches caused the Territory's alleged loss by connecting the alleged breaches of contract to the alleged losses flowing from the defective construction of the 18 houses, and because it fails to include material facts which are relevant to why the categories of loss claimed by the Territory are not too remote.
At paragraph [23] the Territory sets out its alleged losses, namely the cost of demolishing and rebuilding, or alternatively acquiring, various houses in the table set out at [6] of the ASOC.
Leaving aside the HBCF indemnity claims, which are a separate cause of action, there is no pleading of material facts which link the loss in paragraph [23] to the failures of Bellamack in circumstances where it is unclear why the Territory was required to replace or rebuild the houses. There is no pleading, for example, that the contract was entered into for the benefit of the ultimate purchasers or that the Territory has an obligation to them in some other way, such as misrepresentation/reliance.
The pleading at paragraphs [21] and [22] that the failures of Bellamack meant that it did not make affordable homes available which complied with the requirements of the development agreement does not in my view sufficiently link the alleged failure with the loss which is alleged at paragraph [23].
(a) There was no suggestion that the Plaintiff was suing on behalf of other persons to whom it is obliged to pass on any damages recovered; and
(b) The Plaintiff ceased to have any economic interest recognised by law in the land that was being developed by the Defendant long before any Affordable Home was built.
"The rule of common law is, that where a party sustains a loss by reason of a breach of contract, he is, so far as money can do it, to be placed in the same situation with respect to damages, as if the contract had been performed."
In the present case, the respondent was entitled to have a building erected upon her land in accordance with the contract and the plans and specifications which formed part of it, and her damage is the loss which she has sustained by the failure of the appellant to perform his obligation to her. This loss cannot be measured by comparing the value of the building which has been erected with the value it would have borne if erected in accordance with the contract; her loss can, prima facie, be measured only by ascertaining the amount required to rectify the defects complained of and so give to her the equivalent of a building of her land which is substantially in accordance with the contract.
In short, this area of the law protects the interests of "performance itself, [and damages are not] confined to compensating for the loss of economic benefits of performance". There are limits on the extent to which a decree of specific performance of a contract will be granted. But damages can secure a similar result if those damages will ensure performance, however belatedly, not merely compensation for some decline in the value by reason of non-performance.
When the builder in breach of his contract delivered to the building owner a building that did not conform to the specifications, the owner became entitled to recover damages according to the measure approved in Bellgrove v Eldridge. If the owner subsequently sold the building, or gave it away, to a third person, that would not affect his accrued right against the builder to damages according to the same measure. The fact that the building had been sold might be one of the circumstances that would have to be considered in relation to the question whether it would be reasonable to effect the remedial work, but assuming that it would be reasonable to do the work the owner would still be entitled to recover as damages the cost of remedying the defects or deviations from the contract (assuming of course that the contract price had been paid). In assessing those damages it would not be relevant whether the owner was under a legal liability to remedy the defects, or whether he had a profit or a loss on the sale of the building, for the builder has no concern with the details of any contract that the owner might make with a third party.
It is not shown what interest the Director of War Services Homes then had in any of the nine houses, nor is it shown that he was under a legal liability to the owners to rectify any defects or omissions in the works originally specified. The fact that he did pay to have some remedial work carried out between November 1955 and March 1956 does not, in my opinion, entitle him to recover against the defendant the cost of such work.... In [Bellgrove v Eldridge [1954] HCA 36; (1954) 90 CLR 613] which was an action by the building owner, the cost of making the building confirm to the contract was adopted plus consequential losses. In the present case there was no attempt made to prove any loss on the part of the Director of War Service Homes on the sale of the houses and it appears to me that the cost of the remedial work was not a loss resulting from the breach of the contract but from a voluntary act.
The owner of a defective building may decide to remedy the defects before he sells it so that he may obtain the highest possible price on the sale; he may sell subject to a condition that he will remedy the defects; or he may resolve to put the building in order after it has been sold because he feels morally, although not legally, bound to do so. These matters are nothing to do with the builder, whose liability to pay damages has already accrued.
Bellgrove provides support for this plaintiff's case then in two respects. First, it holds that the cost of demolishing and rebuilding a structurally unsound building is the appropriate measure of damages, the qualification of reasonableness not being significant where the defect is of that kind. Secondly, it holds that it is unnecessary, at least in every case, to prove that there will be a demolition and rebuilding.
The plaintiff in Bellgrove had remained the owner of the building. However, Bellgrove was applied in favour of a plaintiff which had sold the relevant property in Director of War Service Homes v Harris. The respondent there was a builder who had breached his contract with the appellant by substantially departing from the specifications for ten houses. It was only after the houses had been sold that the breaches were discovered and there were complaints by occupiers to the appellant. The appellant demanded that the respondent rectify the defects but he refused. The appellant then had another builder do the work at the appellant's cost, and the appellant claimed that cost from the respondent. The trial judge dismissed the claim because in his view "the cost of the remedial work was not a loss resulting from the breach of the contract but from a voluntary act." That was reversed by the Full Court, in which the principal judgment was given by Gibbs J....
That passage seems to provide sufficient support for the present claim; indeed it suggests that the plaintiff who is a former owner need not plead, as this plaintiff has, that it will demolish and rebuild. But the difference between that case and the present, of course, is that there the plaintiff had rectified the works, and it was the amount which it had spent which it sought to recover. The question was one of causation: whether a proven loss, from the plaintiff's expenditure upon remedial works, was relevantly caused by the defendant's breach of contract. The disposition of the appeal required only a decision as to whether there was that causal relationship, the trial judge having dismissed the claim upon that issue. Many of the remarks in the above passage were obiter dictum.
In holding that the owner in Bellgrove need not prove that she would demolish and rebuild her house, the court was not holding that proof of a loss was unnecessary. The respondent there remained the owner of the house, and her loss came from her not having the benefit of the performance of her contract, which mattered to her because of the consequences for her enjoyment of her property.
Similarly, in Director of War Service Homes v Harris, there was no question that the plaintiff had suffered a loss. As I have said earlier, the issue for determination was whether that loss (the plaintiff's expenditure on rectification works) was relevantly caused by the breach of contract. I agree with Doyle CJ in De Cesare that the obiter dictum of Gibbs J is, with great respect, "expressed in terms that are too absolute". Where a building owner does not have a building that conforms with that required by its contract (or which it would have had absent a breach of a duty of care owed to it) the owner suffers a loss, and one to be compensated according to the measure expressed in Bellgrove, unless, as Hodgson said in SAS, that is displaced by supervening circumstances showing that a different loss or indeed no loss has been suffered.
(a) Paragraphs [4] - [5] plead the terms of the Development Agreement;
(b) Paragraph [6] pleads the construction of the 17 defective homes;
(c) Paragraphs [7] - [11] plead the building requirements of the Development Agreement (Building Code of Australia, Building Regulations 1993 (NT));
(d) Paragraph [12] pleads non-compliance with the Building Code of Australia, Building Permits and Australian Standards;
(e) Paragraph [13] pleads the breaches of the Development Agreement by reference to the matters of non-compliance in paragraph [12].
(f) Paragraphs [14] - [17] plead the consequences of the breaches;
(g) Paragraphs [18] - [20] relate to the Home Builders Certification Fund, which is not relevant to this part of the application;
(h) Paragraph [21] pleads that, had the Defendant complied with its obligations under the Development Agreement, it would have made available for sale homes which complied with the Development Agreement;
(i) Paragraph [22] pleads that, by reason of paragraphs [14] - [17] breaches, the Defendant failed to make available houses which complied with the Development Agreement;
(j) Paragraph [23(a)] pleads that, had the Defendant complied with the Development Agreement, then 17 affordable homes would have been released to the residential housing market to be purchased by Eligible Purchasers which complied with the development agreement and would have not been 17 severely defective homes on the relevant allotments;
(k) Paragraph [23(b)] pleads that as a result of the Defendant's breaches and consequences thereof pleaded in paragraphs [14] - [17] 17 homes which did not comply with the development agreement were released to the market, and were purchased with defects, requiring demolition and in most cases rebuilding.
As a result of the Defendant's breaches and the consequences thereof pleaded in [14]-[17] above, the Plaintiff is entitled to a measure of compensatory damages in an amount, so far as money can do it, that places the Plaintiff in the same situation as if the Development Agreement had been performed. Namely, the Plaintiff is entitled to the necessary and reasonable cost of rectification or where the reasonable cure is to demolish and rebuild the Completed Affordable Homes, then the cost of that undertaking, so as to repair or remove the defective homes (as each case may require) and create Affordable Homes which complied with the Development Agreement on the Affordable Allotments available to be owned by Eligible Purchasers or to enable the construction on them of homes which were not defective and which complied with the Building Act and BCA.
Issues in respect to Paragraphs [6] and [19] of the 2ASOC
Pursuant to its policy terms, the HBCF insurance coverage responded to claims for defective building work made in respect of the Completed Affordable Homes identified in No. 9-18 of the table pleaded in [6] above.
Indeed, traditional principle is that assertions made in pleadings do not amount to admissions. In Boileau v. Rutlin, the Court of Exchequer Chamber held that an averment of the existence of an agreement in a bill in equity in another suit between the same parties could not be received as an admission of the agreement by the party pleading the agreement...
It has been suggested that the traditional principle may be too strict and that in some circumstances an assertion in a pleading should be received as an admission... More recently, in Singleton v. John Fairfax & Sons Ltd., Hunt J. declined to follow the older cases and concluded that:
"an imputation pleaded in a statement of claim as required by Pt 67, r. 11(2) is admissible evidence by way of admission against the plaintiff that the matter complained of conveyed that imputation in fact. The same may well operate against a defendant in relation to any contextual imputation pleaded in his defence."
In reaching this conclusion, Hunt J. considered that pleadings should be treated "in the same way as any other form of admission" and that the susceptibility of a pleading to be received as an admission should depend upon whether it was intended to be taken as a sincere or absolute assertion.
However, in Stohl Aviation v. Electrum Pty. Ltd. Jenkinson J. declined to follow the approach taken by Hunt J., preferring the traditional rule of exclusion on the ground that a departure from that rule would often lead to unprofitable collateral inquiries concerning the circumstances in which the assertion was included in the pleading. The suggestion that pleadings should be treated in the same way as any other form of admission fails, in our view, to take account of the function and object of pleadings, when they are not required to be verified, in outlining the party's case and defining the issues to be tried.
(1) The Defendant's summons dated 23 October 2024 is dismissed.
(2) On the Plaintiff's summons dated 25 November 2024, the Plaintiff has leave to amend paragraphs [4(a)], [6(b)], [14(b)], [17(c)(i)], [19] and [19(a)] in terms of the Second Amendment Statement of Claim filed 4 October 2024.
(3) The Second Amended Statement of Claim, filed on 4 October 2024, shall be taken as filed in accordance with these orders.
(4) Costs are reserved.
[1] Northern Territory of Australia v Bellamack Pty Ltd [2024] NTSC 66 ("Huntingford J's judgment")
[2] See paragraph [12] of the Defendant's written submissions dated 11 November 2024. See paragraph [34] of the submissions in respect to the issue of abuse of process.
[3] [2008] NTSC 4 at [9]- [12] ("John Holland").
[4] The Defendant also cited Bond Corporation Pty Ltd v Thiess Contractors Pty Ltd [1987] FCA 84; (1987) 71 ALR 615 at 621 to the same effect.
[5] See Sherrington v Independent Commissioner Against Corruption (NT) & Anor [2025] NTSC 27 citing Northern Territory of Australia v Bellamack Pty Ltd [2024] NTSC 66 at [55] per Huntingford J; Motor Accidents (Compensation) Commission v Toyota Motor Corporation Australia Limited & Anor [2023] NTSC 65 at [93] per Luppino AsJ ("Toyota").
[6] The affidavits of Spain made 23 October 2024, Bloemendal made 19 February 2025 and Chin made 25 November 2024 were tendered by both parties and taken as read.
[8] See Grant on Civil Procedure at paragraph 5.23.106 citing Karlovsky v Q-Built Constructions [2006] NTMC 93 at [8] in respect to the equivalent rule in the Local Court, although there is no express rule prohibiting affidavit evidence in the Local Court Rules as there is in rule 23.04 of the Supreme Court Rules.
[9] Golding v Wharton Saltworks [1876] UKLawRpKQB 41; (1876) 1 QBD 374; Knowles v Roberts [1888] UKLawRpCh 42; (1888) 38 Ch D 263; Bulmer v Oakey Co-op Dairy Co Ltd [1908] St R Qd 216; Darcy v Connolly [1923] WALawRp 24; (1924) 26 WALR 93.
[10] Fancourt v Mercantile Credits Ltd (1983) 154 CLR 87 at 99; Webster v Lampard [1993] HCA 57; (1993) 177 CLR 598 at 602-603 (cited in Otter Gold NL v Barcon Pty Ltd & Sankey [2000] NTSC 65 at [22].
[11] A v Ipec Australia Ltd and Crew [1973] VicRp 4; [1973] VR 39 at 53; Hoh v Frosthollow Pty Ltd [2014] VSC 77 at [20].
[12] [1848] EngR 135; (1848) 1 Exch 850 per Parke B.
[13] Defendant's written submissions dated 11 November 2024 at paragraph [31].
[14] Plaintiff's submissions dated 25 November 2024 at paragraph [19].
[15] (2009) 236 CLR 272 ("Tabcorp").
[16] [1848] EngR 135; (1848) 1 Exch 850 at 855.
[17] Also see Heydon JD, Heydon on Contracts, (Sydney, Thomson Reuters, 2019), paragraph 26.430 entitled "Expectation loss: recovery not limited to financial loss".
[18] [1954] HCA 36; (1954) 90 CLR 613 at 617 ("Bellgrove").
[20] Heydon JD, Heydon on Contracts, (Sydney, Thomson Reuters, 2019), paragraph 26.430.
[21] (1968) Qd R 275 per Gibbs J at 278 ("Harris").
[24] UI International Pty Ltd v Interworks Architects Pty Ltd [2007] QCA 402; (2008) 2 Qd R 158 at 170.
[25] Westpoint Management Ltd v Chocolate Factory Apartments Ltd [2007] NSWCA 253 at [49-51].
[26] See paragraph [50] in Westpoint Management Ltd v Chocolate Factory Apartments Ltd [2007] NSWCA 253, Also and subsequently UI International Pty Ltd v Interworks Architects Pty Ltd [2007] QCA 402; (2008) 2 Qd R 158 at 170-17, 192, 194.
[27] There were four sets of proceedings involving challenges to pleadings: UI International Pty Ltd v Interworks Architects Pty Ltd & Ors [2006] QSC 79 (20 April 2006) upheld on appeal in UI International v Interworks Architects P/L & Ors [2006] QCA 434 (3 November 2006) and further challenges to pleadings in UI International Pty Ltd v. Interworks Architects Pty Ltd & Ors [2007] QSC 96 (30 April 2007) and on appeal UI International Pty Ltd v Interworks Architects Pty Ltd [2007] QCA 402; (2008) 2 Qd R 158.
[28] UI International Pty Ltd v Interworks Architects Pty Ltd & Ors [2006] QSC 79 at [17]- [18] and [29]-[30].
[30] Nor possibly other more contemporary cases such as De Cesare v Deluxe Motors Pty Ltd (1996) 67 SASR 28, Scott Carver Pty Ltd v SAS Trustee Corporation [2005] NSWCA 462, Westpoint Management Ltd v Chocolate Factory Apartments [2007] NSWCA 253 or UI International Pty Ltd v Interworks Architects Pty Ltd [2007] QCA 402.
[31] Plaintiff's written submissions dated 25 November 2024 at paragraph [44].
[32] It is not apparently clear how that was done. The Plaintiff had contacted the Court Registry indicating it wished to file without leave or consent using up its one chance to do so under Rule 36.03(a) but also sought dispensation from marking up the amended copy in accordance with the Rule. Leave was granted to file an Amended Statement of Claim and was so filed. The Amended Statement of claim is headed "Amended Pursuant to Rule 36.03(a)", which I take to be use of the "free amendment" before pleadings closed.
[33] Berno v Green's Steel Constructions Pty Ltd [1991] NTSC 4 at [17].
[34] Liddle v North Australian Aboriginal Legal Aid Service Inc [1993] NTSC 78 at [33].
[35] See Tropicus Orchids Flowers and Foliage Pty Ltd v Territory Insurance Office [1995] NTSC 131 at [6] and Amcor Pty Ltd Trading as A.P.M Containers v Victoria Valley Beef Pty Ltd & Anor [1995] NTSC 11 per Coulehan M at [20] - which was an application by a defendant to withdraw, by amendment, an admission in its defence as to the existence of a written agreement and its effect.
[36] Northern Territory of Australia v Bellamack Pty Ltd [2024] NTSC 66 at [15].
[37] Northern Territory of Australia v Bellamack Pty Ltd [2024] NTSC 66 at [19].
[38] The relevant correspondence is set out in the affidavit of Chin made 25 November 2024, Annexure AYC-1.
[39] [1990] HCA 31; (1990) 170 CLR 70 at 98 per Gaudron and McHugh JJ, and at 86 per Mason CJ and Brennan J ("Laws").
[40] Paragraph [6(a)] of the ASOC states "The Defendant (a) allocated Lots to be Affordable Allotments including as listed in the table below". Paragraph [6(b)] of the ASOC further qualifies the table by stating the Defendant "on the dates specified in the rightmost column of the table caused to be constructed and made available to Eligible Purchasers, Affordable Homes on each of those Affordable Allotments, pursuant to its obligations under the Development Agreement."
[41] See also Stohl Aviation v Electrum Finance Pty Ltd (1984) 56 ALR 716 at 732.
[43] Defendant's submissions dated 9 October 2023 at paragraph [15].
Northern Territory of Australia
Bellamack Pty Ltd [2025] NTSC 44
(1954) 90 CLR 613
(1987) 71 ALR 615
(1996) 67 SASR 28
(1983) 154 CLR 87
(1990) 170 CLR 70
(1984) 56 ALR 716
(2009) 236 CLR 272
(2008) 2 Qd R 158
(1993) 177 CLR 598
(1990) 169 CLR 279